Sökresultat:
9087 Uppsatser om Lead Time - Sida 16 av 606
Hantering av varumärken
AimThe aim of the study was to develop a method for the survey of play movement demands and temporal patterns in order to enable a descriptive study of the defensive players in American Football. The overall aim was to improve the understanding of how American Football is played to create opportunities for enhancement of current or developing new training methods to better suit football.MethodFifty plays from a Division 3 college football game on video from 2005 was divided into sequences of action for one player each from the defensive line, linebackers and defensive backs and analyzed with the video analyzing software cSwing. Every players sequence of action was recorded in a spreadsheet and noted on a scaled football field where distances were measured and together with time stamps from cSwing velocity was calculated.ResultsUsing this method it was possible to describe the play movement demands and temporal patterns which was the main task of the study. The defensive end worked on an average 4.61 seconds per play, the distance was 12.4 meters and average speed 2.5 m×s-1. The linebacker worked on an average 4.35 s per play, 13.7 m and at a mean speed of 3.0 m×s-1.
Cykeltidsoptimering av sjuaxligt robotsystem
This master thesis studies how much the cycle time, i.e. the time it takes for an industrial robot to perform a given task, can be reduced if an extra degree of freedom (DOF) is added to the robot system. The extra DOF consists of a linear track, which is supposed to be used in an optimal way. The problem has been studied using simulations in the robot simulation tool RobotStudio. To be able to run an optimization in Matlab, with the RobotStudio simulation cycle time as the object function, communication between Matlab and RobotStudio has been set up with an interface written in Visual Basic.
Konstruktion av mutterdragare för stora moment
This degree project was conducted in collaboration with Gremo AB located in Ätran.The aim of the project was to develop a solution to secure quality and to help assemblingthe locknut holding the vertical hinge on the harvesters and foresters from Gremo.At this time the nut is assembled manually by the aid of an overhead crane. The nut istightened differently from time to time, and there was no specified torque to which it istightened. Another present problem was the locking washer which sometimes getsdamaged during assembly, when this happens the procedure has to be started over fromthe beginning. The current assembly procedure is very time consuming and lengthy forthe employees.Our task was to design a machine that could tighten the nut to a specified torque with amargin of error of ± 3%. The assembly procedure will be held simple and the timerequired at a minimum.The project started by developing several principle solutions, the one solution that bestmatched our specifications were developed to a primary solution.Today we have started manufacturing and assembling our prototype.
Fritidspedagogens möte med ett museum : Fritidspedagogens uppdrag och det pedagogiska arbetet under ett studiebesök
Essay means attempt, and is a paper written based on self-experienced dilemmas, which the writer then returns to, reflect upon and discusses on the basis of literature and accepted theories. In this essay, I reflect upon my own professional role as a leisure-time pedagogue. The leisure-time pedagogue must provide activities that in different ways relate to the curriculum 2011. I have therefore a responsibility to influence the students' desire for knowledge. Focus of learning is different from the one in school, with an emphasis on informal learning.The dilemma is that I am unable to do any pedagogical work at the museum because of many conflicts.
Vård & Omsorg - Mer än ett jobb? : En undersökning av hur väl vård- och omsorgsförvaltningens kampanj lyckats - enligt teori och empiri
Today?s society has become a society of information were communication has become more important to manage, both for companies and for the person as an individual. If you want your message to be successful you have to plan your communication and also evaluate the result. The administration of health and care in Karlstad had already planned and performed an information campaign, ?Vård & omsorg ? Mer än ett jobb? (translation ?Health & care ? More than a job?), and therefore we got the assignment to investigate the rate of success.The investigation is based on both theory and empiric.
Ena dagen student nästa dag nyutexaminerad sjuksköterska
Background: Every year about 4600 nurses are examined in Sweden. The work as a nurse is responsible and she is often working under time pressure. Aim: To describe nurse?s understandings about her professional role during her first year after the examination. Method: Systematic literature review, where 10 scientific articles were examined.
Frilekens betydelse för barn i förskolan : En kvalitativ studie av några pedagogers syn på den fria lekens betydelse för barns lärande
The aim of this study is to increase knowledge and understanding of free play or free fun time importance for children of age around five years in preschool, in order to promote children?s development and learning. The focus was on exploring and better understanding of teacher?s and educators? approach to the free fun play time as a tool in their educational work, and also about their own role in this context as well as analyzing of forms, rules and structures spontaneously created by groups of children having free play fun time. Another important moment of this study was to give more light on approaches to this issue in education theories by Piaget, Vygotsky and Freud among others.As to the practical experimental part of the study it has been performed at a preschool and kindergarten in a suburb at the outskirts of Stockholm, with four employed educators there and with groups of children of age around five.
Potentiella armeringsfel inom byggproduktionen : En generell studie
Reinforcement is of great importance to fulfill the dimensioned strength of a concrete construction. This requires that the work needs to be carried out with adequate results that neither endangers the workers or the safety of the construction. Progressive development of the planning phase, construction documents, and construction methods is in constant need since the technology constantly evolves.In order for contractors to be able to get acceptances from their quotations requires that they have to increase their working pace in order to be able to leave a quotation with a lower price than the competition.Due to the increasing pace the different parts involved in the construction process is subjected to time pressure. The design stage, construction documents, work preparation and the execution are all affected when everything has to be finished quickly. To avoid problems, it is required that all parts are able to deliver good quality solutions and results under the influences of time pressure, which is not always easy.
Konstruktion av elektrolytisk ozongenerator
The work has been carried out in cooperation with the company Zenit Design in Malmö. The project's goal was to restore, improve and produce an ozone generator. During the project, the authors sought relevant literature in databases, been in contact with US suppliers of fuel cell membranes, Asian suppliers for the processing of Teflon and Titanium parts in mechanical engineering and Swedish suppliers of various standard components. The authors had access to a temporary lab at Zenit and electron microscope at Halmstad University where material tests were performed. The authors have also had access to measurement equipment to measure amounts of ozone.During the work, the authors have mapped how an existing ozone generator works and then have their own development.
Blockbaserad provning : Utveckling av en ny testrigg för utloppsmodulen
Alfa Laval?s strategy is to focus on modularized product platforms. Several benefits areforeseen, reduced lead-time, less costs, shorter Time To Market and better quality.Development and verifying will be carried out on block level. Today the separators arebeing tested as a complete unit. A number of factors affect the test results and problemsthat are encountered can be hard to identify.
E.ON:s transformatorflöde - en studie av återanvändningen av transformatorer i projekt krafttag
Problem StatementAfter the hurricane Gudrun in January 2005 EON Elnät Sverige AB started the project KRAFTTAG, were 17,000 km of the airborne power grid shall be replaced with cables underground. The transformers in the airborne power grid shall be dismounted, renovated if necessary and then conveyed to stations, of type kiosk.Additional new transformers, more than planned, have been bought. This is due to the dysfunctional transformer flow from the demolished power supply to projects, were the new power supply is built, the general picture is complicated, since the reconstruction involves other companies and many employees at E.ON.PurposeThe purpose of this master thesis is to map and understand the existing transformer flow. The objective is to make a recommendation on how to increase the level of E.ON? s transformer recycling.Methodthe authors have worked with a system approach, including both qualitative and quantitative data.
Produktion av Pyrolysolja från kvistrejekt
Fast pyrolysis is a method for converting biomass into three energy rich products: char, gas and bio-oil, where the latter is most interesting. Pyrolysis is an endothermic process where biomass is heated in an anaerobic environment and, with the right operating conditions, up to 80 %wt bio-oil can be extracted. Key parameters for fast pyrolysis are: stable reactor temperature (~500°C), short residue time for gas in the reactor (<2 s) and a very high heating rate for the biomass. Today there are several different process solutions for fast pyrolysis, where fluidized beds and rotating cones are most developed. Bio-oil has compared to fossil oil: lower heating value, low pH and also polymerizes with time. Because of this upgrading is desirable for increasing competitiveness.
Hydroperikard hos katt : patofysiologi, diagnos och behandling
Hydropericardium or pericardial effusion (PE) is the accumulation of fluid in the pericardial sac and is often secondary to pericardial diseases or diseases related to the heart. It is unusual with clinically relevant pericardial diseases in cats but pericardial effusion is the most common one.
Since PE causes serious symptoms and may lead to death it is important with a quick diagnosis and treatment. PE can be acute and cause cardiac tamponade, which gives severe clinical signs. Cardiac tamponade needs to be treated immediately or else the cat will die from cardiogenic chock. More common is chronic PE where the fluid accumulates during a longer period of time and the pericardial sac stretches.
Vem predisponerar för ätstörningar? En litteraturstudie om olika grupper i samhället som är i riskzonen för ätstörningar
The purpose of this literature review was to find common factors for the persons who predispose to eating disorders. These factors shall help the nurse to recognise early signs of eating disorder behaviors. The literature review is directed to the nurse and will answer the issue: Which groups in the community run the risk of developing eating disorders? Furthermore, this knowledge shall lead to a better understanding of persons having eating disorders and be used as an aid in his/her encounter with these patients. The method was a literature review based on eight scientific articles, which were interpreted on the basis of the competence of the nurse.
Komplexiteten i ett event : Kommunikationskanalen som leder till relationer
Events are a growing channel for companies and organizations to reach out to their customers. The com-munication channel opens up to satisfy all human senses. Which are required for a message to go into the receiver and be memorized. The research gap we decided to contribute to we made a case study of an event that is not sport related and looking at both the transmitter perspective and receiver perspective. Thus, the purpose of our study is to increase the understanding of how the transmitter should be able to convey the purpose and goal of the event to the receiver.