Sök:

Sökresultat:

11441 Uppsatser om Industrial control system - Sida 29 av 763

En studie av sambanden mellan locus of control, self-efficacy, socialt sto?d och positiv feedback

Organisationspsykologi kan ibland upplevas allt fo?r problemorienterad med stort fokus pa? just problem och konflikter i organisationer. Det finns dock en inriktning pa? de fo?rha?llanden och processer som bidrar till att ma?nniskor, grupper och organisationer kan frodas och fungera optimalt. Denna studie syftade da?rfo?r till att underso?ka eventuella samband mellan positiv feedback, self-efficacy, locus of control och socialt sto?d.

Kvantifiering av föroreningstillskott från dagvatten inom skyddsområdet för Göta Älv : en simuleringsstudie med modellen SEWSYS

The river Göta Älv reaches between Vänern and Gothenburg and is the main raw water source for Gothenburg that supplies about 700 000 people with water. To protect and maintain a high water quality, continuously samples and water analyses are made throughout the river. In 1998 a protection area was founded between surte and Lärjeholm where the raw water intake is. This was made to increase the awareness of the importance to protect the water. However, there is a lot of contribution of untreated stormwater to Göta Älv within the protection area.Göteborg Water and Sewage Works commissioned this thesis where two areas, Tagene industrial area and Kärra residential area, with untreated stormwater outlets within the protection area are studied.

Realtidsstyrning av IP-kamera

The final thesis named Tracking in Sensor Networks was created by the company Instrument control Sweden. The thesis work is to create a plug-in to an already developed software pro- gram, SkyView. Via the software program one should be able to control an IP-camera from AXIS, model 215 PTZ, with the appropriate protocol over a network.  An Application Programming Interface, API, was used to easily control the camera through SkyView. The interface is called VAPIX and is used to all cameras from AXIS.

Manual för elMaster Concept 2012

This thesis includes a description of the project flow for our projects at Semcon. The emphasis is on designing a manual for elMaster Concept.The project flow provides several minor and major elements plotting schedules for this project and the establishment of a manual. When a schedule is drawn, lists and tables with components and connections can be created. This is done to better manage drawings and make changes. These diagrams and tables are used in product manufacturing, testings, controls.

Fotboja i hemmet - vem blir egentligen straffad?

Karriärcoaching är en tjänst som ökat kraftigt på den svenska marknaden. Tidigare studier inom området har visat att en stark självkänsla stärker en persons hälsa och underlättar för denne att hantera problem. Syftet med studien var att undersöka om karriärcoaching har någon påverkan på prestationsbaserad självkänsla, känslan av kontroll (Locus of Control) samt självbemästring av tankar och känslor (Self-Efficacy). Genom en enkätundersökning har en grupp som genomfört karriärcoaching jämförts med en kontrollgrupp som ej genomfört karriärcoaching. Ett oberoende t-test gav en signifikant skillnad i Locus of Control (p<.05).

Tågtrafikledare i praktiken : Informationshantering och systemanvändning vid Gävle driftledningscentral

In Sweden whenever trains or maintenance workers want access to the railway system, their requests of usage and movements are being supervised, granted and handled by train dispatchers. The profession holds a key role in making the complex railway system work in terms of efficiency, safety and delivering on-time arrivals. This master thesis, delegated by the Swedish Transport Administration, has been carried out at the Division of Human Computer Interaction at Uppsala University and at the train traffic control center in Gävle. The aim has been to map what information the train dispatchers use in order to make safety-related decisions concerning their working goals. And further to describe and analyze how the train dispatchers, visavi their tools and systems in the work domain, gather necessary information.The result indicates a complex, diverse and spread out setting of different programs, procedures and tools that make satisfactory fulfilment of efficiency, safety and punctuality in relation to the time table hard.

Utveckling av en dynamisk Simuleringsmodell av en skotare

The predominant forestry harvesting method is based on the harvester-forwarder method, theharvester folds, branches and cuts trees, and sorts the logs into piles, while a forwarder transportsthe logs to a landing area.This master thesis work is about realization of a dynamic forwarder simulation model, and itspurpose is to provide an integrated forwarder simulation model in MATLAB/SimMechanicswhere the forwarder is based on a concept using pendulum arms to connect wheels and chassis.Active suspension control is developed and implemented into the simulation model, and finallycompared in simulation with passive suspension.In a first step, an integrated forwarder simulation model is developed, containing a simplifiedforwarder model, a tire-to-ground interaction model and a test track model. The simplifiedforwarder model is based a rigid multi-body system with a spring-damper suspension of thependulum arms. The tire-to-ground interaction model calculates the reaction forces, friction fromthe ground and applies the propulsion force. The test track model is a simplified version of thereal test track in Skogforsk. The propulsion wheel torque control is used to regulate theforwarder speed.

UTVECKLING AV SUPPORTARMFÖR PARALLELLA INSTALLATIONER

The purpose of this thesis is to identify the factors that drive efficiency and effectiveness in technical development projects performed at A?F?s department of product development. In addition to identifying and analyzing these factors, the thesis also analyzes what needs to be taken in to account in order to implement a measurement system that is able to both monitor and control the identified factors.The thesis has been performed in a qualitative manner. It is based on interviews with people from several different technological companies, within different lines of business, all of which are customers to A?F?s department of product development.The results show that there are seven critical factors for project efficiency and effectiveness.

Framtagning av smyckeskollektionfrånidé till marknad

The purpose of this thesis is to identify the factors that drive efficiency and effectiveness in technical development projects performed at A?F?s department of product development. In addition to identifying and analyzing these factors, the thesis also analyzes what needs to be taken in to account in order to implement a measurement system that is able to both monitor and control the identified factors.The thesis has been performed in a qualitative manner. It is based on interviews with people from several different technological companies, within different lines of business, all of which are customers to A?F?s department of product development.The results show that there are seven critical factors for project efficiency and effectiveness.

Pamiro

This report describes the work with creating a CMS (Content Manager System). A CMS is a web tool so you easy can publish materials on your web page. With a CM Scan you can without any knowledge of programming web pages create and maintain a web page. This will result in that you and your organisation save time and money. You can also split the responsibility for the webpage in different roles, but still keep the control. We have chosen to create our CMS in a script language called php4 and with the database server MySQL, we have also used JavaScript a lot.

Produktsäkerhet i livsmedelsindustrin : HACCP inom bageri och konditori

During the last years, producers and consumers have become increasingly aware of food safety. Foodborne illness and foodborne injury are in best case unpleasant but they can also be fatal. HACCP (Hazard Analysis Critical Control Point) is a preventative food safety system which is aimed to guarantee production of safe food free from pathogens, foreign materials and substances with potential to cause adverse health effect. In order to succeed in developing, installing, monitoring and verifying a HACCP system, there is a mix of hurdles for the company to overcome. While larger food companies meet a difficult challenge, small and medium size enterprises often feel that the hurdles are almost impossible to manage.

Clas Ohlson : Hur påverkas styrningen i ett företag i och med en börsintroduktion?

The purpose of this report is to examine what will happen with the financial control of a company if changes from a family owned company to a public company listed on a stock market. The expectations were that the control would have a more short-term focus with more financial measures. The result shows that the changes were experienced as minor. The rate and the work in the finance department showed to be the major changes due to the change of owners..

Kvalitetssäkring av produktionsprocess : Skumming i industritvätt

This report describes the manufacture and control of a flying platform. The report describes the basic and fundamental theories required to get the platform flying. It touches on subjects such as A/D-conversion. PWM-control and PID-control. The sensors used in the platform are a gyro and an accelerometer.

Fjärrstyrning av videokamera

On some occasions it may be inappropriate with a cameraman behind the camera. In somecases there is no cameraman available or it is a smaller event, like a family celebration, to befilmed. It can also be difficult for a cameraman to shoot from certain angles. One solution forthis kind of situations can be to remotely control the camera movements. There are thosekinds of solutions on the market today but they either address professional filmmakers or thefunctionality is limited, for example by the absence of wireless remote control.This project aims to develop a solution to the problem with absence of wireless remote controland also a solution with more flexibility and less complexity than today?s solutions.

ISO 14001 : En genomgång av SSAB EMEA Oxelösunds miljöledningssystem

Environmental issues is now taking a growing place in society and to ensure that companies meet public expectations and do their part in working towards a sustainable development, environmental management system is said to be an effective tool (Almgren & Brorson, 2009).This case study has examined a company's environmental management system in order to find strengths and weaknesses within the ISO 14001 system. The work was carried out using interviews, document reviews and analyzes in which the three main concepts control the report ; "daily work", "audit" and "environmental aspects".The results shows that the daily work looks different depending on where you are; in the production or at the office. The audit examined all documents related to the environmental management system and the study showed that the biggest strengths was the commitment and waste handling while areas such as environmental goals and management review needed improvement. As a result of the deficiencies identified, suggestions for improvements was proposed. The investigation of the routine of the environmental aspects showed an incomplete routine where the red wire from identification to evaluation was missing.

<- Föregående sida 29 Nästa sida ->