Sök:

Sökresultat:

914 Uppsatser om Hydro plant turbine - Sida 6 av 61

Kväveomsättning i gräsmark med olika artantal och artsammansättningar :

This study was carried out at the Swedish University of Agricultural Sciences, Dept. of Agricultural Research for Northern Sweden. The aim of the study was to determine how plant species richness and diversity influence the nitrogen pools and nitrogen fluxes in the soil. Plant and soil samples from a biodiversity experiment in grasslands were used. Thirty plots with 12 grassland plant species (legumes, grasses, and non-legume herbs), combined from 1-12 species were investigated.

Inventering av processvattenbalans : fastställande av fjärrvärmedistributionens läckage inom Vattenfall Värme Uppsala AB

Heat is distributed to the district heating customers through pipes with water as a heat carrier. The district heating system is complex. To decide what is leakages from the district heating net versus what is the water consumption of the plant, is difficult. Therefore, the purpose of this master thesis is to establish a model where the district heating net?s leakages but also the water consumption of the plant can be followed daily. The project is performed at Vattenfall´s district heating power plant in Uppsala. Information is gathered through discussions, drawings of the plant and guided tours of the plant.

Småskalig biobränsleeldad kraftvärmeproduktion : teknik och investeringsutrymme

To achieve the requirements to decrease emissions of greenhouse gases by 20 % by 2020, Swedenneeds to increase its use of bioenergy. In doing so it seems natural that those who already haveaccess to large amounts of biofuels in the form of by-products such as straw, wood chips anddigestible materials take advantage of these assets locally. By combining production of heat withpower production at the farm it may be possible to not only reduce the direct use of fossil fuel forheating but also reduce energy costs.The purpose was to simulate different cases of using a small scale biofueled combined heat andpower plant for farm-based systems. A MatLab-model was developed and used to draw conclusionsabout the costs for production of heat and electricity with different conversion technologies.The model uses climate data to simulate the variations in heat energy demand on a day-to-day basis.The given heat demand is the base of the simulation and from this the possible electric output iscalculated. This study has focused on the impact of the following properties: electric-, heat- andtotal efficiency, fuel, fuel price and specific fuel requirements.

GIS för fastighetsrättsliga frågor inom energibranschen

The purpose with the work is to study Fortums activities with hydro power plants, dams and reservoirs mainly in a premise jurisdictional perspective and to show how GIS would be a helpful tool for the future.A great deal of the information that the Generation Hydro-division at Fortum are managing have a spatial element. That means that it is possible to spatially join this information to a geographical polygon, line or point. This information is today gathered from several different sources, such as files, paper maps and digital data of several kinds. A Geographic Information System (GIS), as and aid besides the ordinary tools should be an effective support in the everyday work with questions of a premise jurisdictional nature.The goal of this work is to account for how to organize, present and analyse geographic information. We will show how to link from the map to traditional tools such as calculation- and register programs.

Utveckling av fastigheten Hydro : Framtagning av förslagshandlingar

Sölvesborg är en stad under expansion, dit lockas folk av en lantlig idyll nära havet. Sölvesborgs kommun har som mål att öka invånarantalet från 16 000 till 20 000 fram till år 2020. Kommunen äger fastigheten Hydro vilken är centralt belägen i Sölvesborg i anslutning till tågstationen. Idag används fastigheten Hydro till en parkeringsyta och kommunen vill att fastigheten ska planeras om för att bli en ny central knytpunkt i Sölvesborg som binder ihop tågstationen och förlänger centrumstråket. Detta examensarbete leder till färdiga förslagshandlingar för fastigheten.

Vattennivåreglering i Avesta Lillfors : På uppdrag av Fortum Generation AB

I denna rapport utreds olika metoder för att kunna reglera vattennivån i vattenkraftverket Avesta Lillfors i Dalarna. Två kraftverk ligger endast 900 m uppströms och detta gör att svarstiderna blir korta och regleringen blir lätt nervös. Att använda sig av vattennivåreglering i ett kraftverk för-enklar dess styrning då anpassning till inflödet sker automatiskt.En flödestabell har tagits fram genom mätningar i turbinen, med hjälp av Winter-Kennedy-metoden. Denna tabell används för att kunna fram-koppla regulatorn och därmed dämpa stora variationer i inflödet. Dessu-tom har en modell av älven skapats och testats med en återkopplad PID-regulator.

Forsmark 3 ?Ett Framtida Biobränslekraftverk?

Recent turmoil surrounding nuclear power as an energy source, especially since the accidentat Fukushima, has largely contributed to the debate of whether or not nuclear power should beused as an energy source. This study has examined the economic feasibility of replacingForsmark?s 3rd nuclear reactor with a bio fueled power plant, and find out how this could bedone.The power generation that has to be replaced is equal to 1170 MWe. To replace this, 6 largescaleCFB-boilers, each providing over 200 MWe, were necessary. In addition to this, eachboiler required their respective turbine sets, comprising one high-pressure-, and one lowpressureturbine with intermediate reheating capacities.Based on this, a rankine-cycle was modeled using the software EES, to be able to calculatethe total heat required in the power plant.

Mekaniskt snytbaggeskydd

Insecticides will be removed from Swedish forestry, at present insecticides are used to treat our seedlings to avoid them from being attacked by pine weevils. With the forthcoming ban on insecticides alternative protective measures will have to be tested. Holmen Forest Ltd has aimed to find an alternative and have developed a mechanic pine weevils protection accessory as well as a new concept on planting pipes. Studies have been conducted on the behalf of Holmen Forest Ltd to see how planting with the newly developed mechanical protectors and plant pipe stands up against the conventional methods used today. The study was conducted over a three week period. Three factors were compared regarding planting quality including i) pressure around the plant, ii) the depth the plant ended up in, iii) plant angle. Mechanical plant pipes were used in the study, and where tested like a one-handed and a two-handed pipe. The study concludes that further development is needed for the mechanic plant protector to live up to the speed and quality of conventional methods.

Studie i att ersätta kärnkraftsreaktor med biobränslealternativ

This report contains a study of replacing nuclear power with biofuel. The nuclear plant, OKG north of Oskarshamn in Sweden has been chosen and an extensive literature study about the nuclear plant has been implemented. The main aspect of this report is the availability of biofuels and whether it would be economically sustainable. Sweden?s most common biofuels are examined with regard to scope of use and potential.

Självgående fordon hos Sandvik do Brasil

At the plant of Sandvik do Brasil in São Paulo there is a need for improving the transport of inserts between the plant building and the stock building. The idea is to install a system with an Automated Guided Vehicle (AGV) to take care of this transportation. The purpose of this report is to present which demands there are on the system and to find the best solution according to the demands.To conclude this work a study was made of the plant and the AGV technology was examined. Several providers of AGV solutions were contacted to get information about prices and detailed solutions.The conclusion was that the most suitable system for this application is a small unit load vehicle using inductive wire as guiding system..

Alternativ till fortsatt elektrisk generering i Olidan

In this thesis a possible cost effective runner change of some of the units in the hydroelectric power station Olidan is investigated. The possibility to drive a unit at the same efficiency point through a change of the turbine shaft speed and the rate of discharge is tested. Furthermore the theories behind model testing, determination of efficiency increase from model to prototype and efficiency measurements shall be discussed and analyzed with Olidan as a starting point.A predicted curve has been built on information from model tests and field measurements on the existing runners and runner data from the test of the new model. The predicted curve shows the difference in efficiency between an existing runner and a modern one. It is the difference in efficiency that is used in the calculations that are to show whether changing to a pair of new runners will be cost effective or not.

Solenergi på Nya Karolinska Solna

In today?s society climate change has grown to one of the largest global issues. To reduce emissions of greenhouse gases, large changes of the energy system are required. An increasingly popular solution is investments in local production of renewable energy resources like wind, solar or geothermal power. The following report examines the possibility for implementing a solar power plant on the new hospital Nya Karolinska Solna. Two different technologies for extraction of solar energy has been studied, solar thermal collectors  to meet the need of heating and solar cells to satisfy the need for electricity linked to operating the hospital building.

Förstudie för kvalitetssäkringav glidande förband vid Hissmoforsvattenkraftsstation : -Specifikt för aggregat G6 och G7

Jämtkraft AB which is a power production company in Sweden has bought two newhydro power units to their station in Hissmofors. The two new generators are using aconcept with sliding stator feet to handle the thermal expansion.The concept with sliding stator feet on hydro electric generators has not beenworking satisfactory on many hydro power stations in Sweden and has caused a lot ofcosts due to long downtimes.The new station in Hissmofors is very important for Jämtkraft AB, and therefore theywant to know how to make sure that the sliding stator feet are working as theyshould. According to theories and a simplified model of the generator the stator feetdisplacement should be around 1 -1,6 mm.The generators are delivered with a surveillance system that will measure thedisplacement of the sliding stator feet. The signal from the system isn?t accessible forJämtkraft AB but it will alarm when the sliding stator feet are malfunctioning.To secure the function of the sliding feet a logger for the surveillance system or adifferent measurement system must be used; if both systems are used Jämtkraft cansecure the function of the surveillance system..

Bygglovsbefriad vindkraft till småhuset : -Ur ett tekniskt och ekonomiskt perspektiv

In connection with the property crises in many countries, caused by the financial crises, people are now more aware of the risks involved in poor property-investments. The unusually cold winters along with extreme prices of electricity in Sweden in recent years has also contributed to increased interest in energy-efficient buildings.The process of developing a modern family home in Kiruna, Sweden is presented the first part of this paper. The house has been designed to withstand very high stresses from snow, low energy consumption as well as a high standard of living comfort. Aspects of the house covered here involves everything from construction, heating and ventilation to sanitation. Each of these areas is presented based on their underlying, scientific methods or theories.

Fjärrvärme - ny lokalisering av kraftvärme i Enköping

The municipality of Enköping is presently working out a new layout plan for the town of Enköping and new residences are planned in the harbour area. Because of these plans, the municipal energy company ENA Energi may have to move its location from the harbour to another part of the city.The aim of this degree project is to investigate the possibility of building a new CHP plant in another area of Enköping. The future demand on district heating and infrastructure at the new location have been projected. A new CHP plant has been dimensioned and economic analyses concerning the project have been made.Results show that the future demand of district heating in Enköping will differ a little from the present needs. In 2030, the district heating production is expected to be c.

<- Föregående sida 6 Nästa sida ->