Sök:

Sökresultat:

914 Uppsatser om Hydro plant turbine - Sida 4 av 61

Småskalig vattenkraft vid Olofsfors bruksmuseum : Med faunapassage

In Sweden there are 1894 small-scale hydropower plants in operation, which together generate 4.3 TWh of electricity per year according to Swedish hydropower compound (SVKF, 2011). This corresponds to the annual consumption of about 860,000 Swedish households (based on an annual consumption of 5000 kWh). In the mid-1950s there were around 4000 small-scale hydropower plants in operation in Sweden before cheap fossil fuels and uranium competed with them, in the current situation only 1,894 of these are in use. If slumbering small hydropower plants once again would be taken into use and some new ones are built, we would be able to extract about 7 TWh of renewable electricity from these annually in Sweden, representing about 1.4 million households.The thesis intends to calculate and construct a hydroelectric power plant at the existing dam in Olofsfors and give suggestions on how the power station should run during the time that fish migration is greatest in Leduån.The turbine and generator to the station in Leduån at Olofsfors is designed by the height of the fall and the water flow through the dam. The turbine selected for the station is a CK-1000RM turbine with a 4-pole 250 kW generator from Cargo & power turbine Sweden AB, which is expected to deliver 1.2 GWh per year.

Uljabuouda vindkraftpark turbinmodellering och stabilitetsanalys

This master thesis has been performed at Solvina in Gothenburg for Skellefteå Kraftand Vattenfall Eldistribution. The aim of it is to investigate the consequences of theinstallation of a wind power plant on the mountain Uljabuouda in the vicinity ofArjeplog. Especially the impacts on voltage and transient stability are examined.Furthermore, the amount of extra strain on the voltage regulation equipment and theneeds for increased regulation capabilities are looked into.The wind power plant is planned to be built by Skellefteå Kraft and connected to a130 kV grid owned by Vattenfall Eldistribution. The work comprehends the followingmain parts:- Theoretical studies aimed at wind turbines and power system stability issues.- Modelling of the type of wind turbines assumed to be built on Uljabuouda.- Simulations of different operation cases and analysis of the simulation results.The results from the simulations show that, as far as voltage stability and extraworkload on tap-changers are concerned, the wind power plant does not, in anysignificant manner, worsen the present conditions. The problem of overloading theline between Arvidsjaur and Vargfors is also minor.

"Fallbacks" - betydelsen av vandringstid för Atlantlax (Salmo salar L.) som faller nedströms vandringshinder

In Lake Vänern, Sweden, there is an endemic population of Atlantic salmon (Salmo salar L.) that lives its entire life in fresh water. The salmon is hindered from migrating to its natural spawning sites in the northern part of the River Klarälven by nine hydro-electric power plants. None of the hydro-electric power plants have fishways so that salmon migrating upstream or downstream may pass. In the current situation, the upward migrating salmon are caught in a fish trap at the most downstream located power plant in Forshaga. From there, the salmon are driven in a truck, past eight power plants and released a few kilometers upstream of the eighth power plant at Edsforsen.

What goes up must come down - Modelling economic consequences of wind turbine decommissioning

At the time being there is limited experience within turbine decommissioning in Sweden and the economic effects are unknown. Despite this, there are expectations that revenues generated by sales of materials will cover decommissioning costs. The model developed identifies thirteen parameters that vary between different types of turbines and that affect the economic consequences of decommissioning. The three most important parameters are turbine location, tower material, and the scope of decommissioning. Trends in the wind energy industry show that these three factors are developing in a manner that increases decommissioning costs dramatically.

Utökning av mätområdet för turbinverkningsgraden på avgasturbo

The Goal with this Master of Science thesis is to expand the possible turbine efficiencymeasurements on an exhaust turbocharger. It was done as a part of the CICERO competencecentre. To feed the turbine with air a special flow rig has been used. Instead of loading theturbine by just restricting the compressor flow a docking system for an electrical dynamometer isdesigned to use the dynamometer as an additional loading source. By using an electricaldynamometer as loading device for the turbine, measurements are not depending on compressorperformance.A large part of the work consists in designing accessories for the dynamometer.

Investeringar i småskalig vattenkraft vid befintliga dammar : - En studie av teknik-, ekonomi- och miljöfrågor

In this thesis a method for evaluating investments in small scale hydro power is presented. An analysis of the future position that small scale hydro production will have on the Nordic electricity market is also carried out. This is done by an inventory of technology and economic and environmental aspects. The inventory is also a guide as to how the project should be implemented.Hydrolyzer is the name of the Excel tool developed to evaluate investments. The tool requests input data from the user and then evaluates the investment and generates a sensitivity analysis.

Identifiering av parametrar för tillståndsbedömning av en vattenkraftstation

The report begins with a general inventory of possible technical faults in a hydropower plant and of possible fault indicating measurements. Then an investigation is made concerning a few different faults. Based on this investigation a choice on seal box condition and water leakage is made as problem for a more thorough examination, in which it is concluded that the turbine water leakage is larger when the turbine is put into operation. The examination ultimately results in a computer alarm for faults related to the seal box. Finally a few things are mentioned about flow measurement and pressure measurement in relation to the project as a whole..

Dynamisk modellering av kärnreaktor

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

Kvalitetsarbete i samband med byggande av betongkonstruktioner

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

Momentfördelning i pelardäck av armerad betong

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

En bakgrund till skadorna på Slussens bärande konstruktioner

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

Diskret ickelinjär analys av geometriskt föränderliga linsystem

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

Energikartläggning i Sundbybergs stad

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

Övervakning och detektering av sprickor i betong med en elektriskt ledande färg

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

Analys av beställarkrav vid upphandling av entreprenader

The purpose of this thesis has been to develop a tool for modelling and simulating the nuclear plant Ringhals 3. The model should be used to improve the knowledge on the dynamics of the plant. Ringhals 3 is being upgraded to produce more power and a tool for analyzing the new operating conditions is needed.The work in this thesis has consisted of improving and developing an existing model of Ringhals 3 made with the modelling tool Dymola. The model has been validated by comparing the results of a simulated house load transient with data from the actual plant. Validation shows good agreement with data from the real plant.

<- Föregående sida 4 Nästa sida ->