Sökresultat:
2120 Uppsatser om House building - Sida 14 av 142
Digitala objekt i neutralt format
Today there are many different Cad-applications on the market for engineers. Because of big building projects it has become more and more important to work with the same application or to have access to a neutral file type to be able to transfer files between different ones.This report studies the single objects and how they react when transferring them between ADT and ArchiCAD via the neutral type IFC. We have also been looking at problems during the transfer between and if there are some connections between these problems. Afterwards we created a neutral object model of a small country house to see if the objects appeared different. The result shows no differences.But looking at the problems that appeared during the transmissions they felt small and no logical.Today it is not possible to save in a neutral type without facing small problems.
Lastkupan på stallet i Österäng - ett rekonstruktionsförfarande
Uppsats för avläggande av filosofie kandidatexamen i Kulturvård, Bygghantverk, 27 hp, 2010.
Vårdprogram för utemiljön vid Zorngården
The purpose of this essay was to develop a conservation program for the outdoor environment at the Zorn House (Zorngården) in Mora, Dalarna, situated in the upper central part of Sweden. In the conservation program the Zorn House garden?s origins and development process has been studied by historical studies of various kinds. As a result a status report also has been made and a description of the garden's values. This has resulted in an objective discussion that provides guidelines for how the garden can be developed in the future.
Utvecklingsanalys av installationssystems montering vid industriellt träbyggande : Värme, vatten, ventilation, el och avlopp
The industrialized timber housing process is capable nowadays to build multi-storeyhouses since fairly new changes in the Swedish regulations where made after theadmission of the European Union in 1994.The industrialized process moves parts of the construction process into a highlyeffective factory where 3D-volumes of the building are prefabricated beforetransportation to the building site for assemble.The assembly process is relatively effective compared to the completion of thebuilding service system and this is therefore the main focus in this thesis. This thesisattends problems with completion of the building service system, and thereforedemarcates from other aspects, such as technical and economic aspects, of thebuilding service system.The degree of completion of the flats differs from completion of the connectivepassages, for example hallways, in a way that suggests a need for further investigation.This thesis includes analysis of the possibilities to increase the prefabricatedconnective passages, to the extent of containing building service systems.An increase of the prefabrication of the building service system has a greatdevelopment potential, even though some restraining factors need to be solvedbefore implementation.This thesis was made in collaboration with two of Sweden?s leading companies on themarket of multi-storey industrialized timber housing, Moelven ByggModul AB andLindbäcks Bygg AB..
O?verla?mnandet inom byggarbetsmiljo?samordning : Riktlinjer och konsekvenser
The concept of building work environment co- ordinator is a relatively new concept that has its origin in the amendment to the Working Environment Act which came into force on 1 January 2009. The terms; building work environment co-ordinator appointed for planning and design and building work environment co-ordinator for the execution of building or civil engineering work ushered in the industry. Once these disciplines complement one another, you can achieve a smooth handover to ensure a good and healthy working environment.In this thesis, we study a company in Uppsala and their operations and handover by interviewing the relevant staff in question. The result shows that there are currently no present guidelines for how and when the handover should take place, it is up to each individual to provide themselves with the relevant information.If the handover of the work environment would occur to the extent it should it would lead to minimized proportions of unforeseen risks and events that may occur during the production phase, which ultimately leads to a better and healthier working environment..
Arboga Mekaniska Verkstad : Förslag på saneringsåtgärder gällande gjuteriet och plåtverkstaden
The industrialization in Sweden has increased the large number of areas that have been contaminated with various types of pollution. One of those sites are the property Höjen 3:24 in Arboga where ?Arboga Mekaniska Verkstad? once been. The property wants to increase the use of the old former foundry building with the adjacent ?plate-workshop? and believe there are two options for the building: That the building either should be used as a warehouse/concert hall, or rebuilt into a cultural center. An environmental evaluation has shown that the levels of heavy metals are over the Swedish environmental protection agency guidelines of less sensitive land.
Bedömning av området energi : En jämförelse mellan Miljöbyggnad, Svanen, FEBY12 och PHI
The Swedish building and property management sector are responsible for about 30 % of the total energy use. In order to take environmental consideration, different environmental assessment tools and standards are used. Miljo?byggnad, Svanen, FEBY12 and PHI are some of these. There has been increased interest to certify buildings and therefore it is of interest to evaluate the assessment of the energy field to see if relevant energy aspects are assessed.
Hållbara projekteringsverktyg : Från byggnadsinformationsmodell till simulering ? en utvärdering av Revit och Virtual Environment
This study examines the use of building modeling and energy simulations in the design process of a building. The take-off point is the notion of energy simulations being needed early and throughout the building design process, and that the lack of energy simulations may be explained by the fact that they are time consuming and therefore often too expensive. A greater interoperability between software tools used by relevant disciplines, such as the architect and the energy specialist, would create smoother workflows, which would reduce this cost and open up for more frequent and iterative energy simulation processes. The study is an assessment of the modeling tool Revit and the simulation tool Virtual Environment and whether they can create smoother workflows, and make leeway for a more frequent use of energy simulations throughout the design process. It also investigates the limitations of what can be examined by simulations in Virtual Environment. This will hopefully help clarify the future role of energy simulations in design processes. The method is a trial by error approach of testing the two software tools by building and simulating a model. The results of these tests show that the workflow is not optimal (and therefore time consuming) for frequent and iterative simulations throughout the design process, but it also reveals some great possibilities of what can be performed with these two powerful tools at hand. Further development with regards on platform independency of the building information model, including seamless exporting and importing, seems necessary to strengthen the future role of energy simulations..
Metodval i projekteringsfasen : Bostadshus Ljusbojen 1
This major project in Building Engineering has its focus on inquiring into what methods has been used in the planning process of the residential buildingLjusbojen 1. This project has been conducted in cooperation with Kadesjös Ingenjörsbyrå AB, an engineering contractor firm which also acts as the property developer. Initially several different general methods for planning residential buildings have been presented. After the methods from the process of building Ljusbojen 1 has been analyzed compared to the general methods presented in part 1. This shows what the determining factors are during the planning process; factors such as cost, quality, time management, know-how and environmental issues.
Bakom fasaden: Haninge kulturhus - en organisationsteoretisk studie med fokus på den fysiska strukturen
This master thesis aims to describe and examine Haninge cultural centre, inaugurated in 2002. We study the centre from an organization theory point of view, with focus on the buildings physical appearance. The question we want to answer is to what extent, and if, Haninge cultural centre fulfills the underlying vision, formulated by the municipality of Haninge. Is the centre the symbol of a new era of Haninge and a vivid democracy as it was meant to be? Is there a congruency between the image the building creates and the vision that was formulated by the municipality? We also seek out to see how the cultural centre relates to an older tradition of cultural centres.
Pedagogiskt arbete på Bror Hjorths Hus : invandrargrupper samt skolklasser.
The house of one of the most prominent Swedish artists of the 20th century, Bror Hjorth (1894-1968), was turned into an artists-museum and opened to the public in 1978. It has since the start held pedagogical activities and during the years developed its own pedagogical approach.I have studied the museums pedagogical work from two perspectives; visiting groups of immigrants and visiting groups of schoolchildren, in search of answers to the questions; can art be used as a way to integrate immigrants into the swedish society, and can artmuseums be a resource for schools?This essay contains my observations, conclusions and theories as well as general facts about Bror Hjorths House..
Utredning av fastighetsel i ett äldre och ett ombyggt flerbostadshus i Gävle
The residential and service sector in Sweden accounts for approximately 38% of the total energy usage and Sweden has an aim to reduce the total energy use by 20% by 2020 compared to 2008, which means residential sector will have to improve energy efficiency. As part of that a law was instituted by the Swedish parliament that all properties must have an Energy Performance Certificate (EPC) to thereby give the property owners a greater insight into energy use in their buildings and propose recommendations for energy-efficiency measures. On the EPC, a value on the building's energy performance in terms of energy use in kWh / m2 per year is declared, of which electricity is a share of it. Instructions on what to include in the amount facility electricity for running the facilities is regulated by the authority for building, Boverket while SVEBY has made an interpretation of the regulations in their report "Brukarindata bostäder" where they have a table on what should be included in the amount and what not to include.This report is a study of two similar apartment buildings, where one of the buildings recently underwent renovation, to see if the declared amount of energy for electricity, in the EPC, is consistent with the measured value, and whether there has been any reduction in facility electricity in the renovated building after the renovation.The result shows that the measured value of the building electricity was 2.6 kWh / m2 per year, 28,8 %, lower than the declared value in the building that have not undergone a renovation. Calculation of values from previous years (2011) by the same percentage of facility electricity as in the results of the measurements, 56.7%, it becomes clear that the declared value for facility electricity in the EPC of the renovated building do not correspond with reality and that there has been an increase in use of facility electricity after the renovation..
Cykelgatan
Mitt arbete innefattar en "Urban building" med bostadsrätter och kontor där utgångspunkten har varit cykeln då jag ansett den vara det mest stadsmässiga elementet. Placeringen för byggnaden är Hornsbruksgatan på Södermalm där det med projektet blir till 130 nya bostäder och 1200 kvm kontor som är väl anpassade för cykling såväl som cyklister..
Byggnationsskillnader i Sverige, Finland och Tyskland
This paper is written as an examination paper at the University of Jönköping. The subject is chosen by Peab Sweden in Jönköping with whom further cooperation has been hold. The aim is to compare building methods and building materials in Sweden, Finland and Germany for further inspiration for Peab?s own market.BackgroundThe development of the construction industry develops new materials and methods to the market which has been forced by shorter construction times and the environment aspect. To pursue the development, further knowledge exchange should exist between the countries.
Utformning & placering av vädringskanaler i ett passivhus, drivet av naturliga krafter
A passive house in Norra Djurgårdsstaden drawn by Tengbom Arkitekter is going to be built. A shaft for airing is needed for a few apartments in the house.The airing shaft is designed for a few two room apartments in the house, which are not able to achieve satisfactory airing, as their outer walls are facing a single direction. The other apartments on the same floor are corner apartments. These apartments do not have the same difficulty with airing since they have their outer walls in different directions, with different pressures at the facades. The airflow in the airing shaft is supposed to be driven only by natural forces, by the sun. The purpose of natural driven forces is to achieve low energy consumption for the house.In this thesis, a design of the shaft for airing has been developed.Initially an open shaft for all apartments was analyzed.