Sökresultat:
4540 Uppsatser om High-voltage connector - Sida 8 av 303
Modellera i 3D med Tekla Structures. Ett konstruktionsprogram anpassat för BIM
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Förslag till vägbro vid Hössnamotet - ? Konceptframtagning och kontrollberäkning av bro över väg 40
Göteborg Energi AB är ett bolag med höga ambitioner att säkerställa ett stabilt distributionsnät för sina kunder. Med ett säkerställande följer åtgärder i form av beräkningar för komponenter som transformatorer av olika märkeffekt, hög- och lågspänningssäkringar och andra kritiska skyddsanordningar som t.ex. reläskydd. Vid ett flertal tillfällen under de senaste åren har det uppmärksammats en problematik där ett fel i lågspänningsnätet har löst ut anslutande transformator. Felet har grundat sig en svag selektivitet mellan transformatorsäkring och lågspänningssäkring.
Design och implementation av konfigurationsverktyg för funktionsblock
Abstract In high voltage substations there is an increasing demand for computerized equipment, and automation of operation and supervision. The future primary equipment will provide the possibility to collect more information and to provide better control for improved effectiveness. Since ABB has got a large customer target, each product must be custom made to fulfil the customers (often from different countries) demands. Later these products will be configured by engineers who may not be familiar with the tools used at ABB. This is a very expensive and time consuming.
Yttäckande nivåkontroll vid byggnation av vägar - en analys av mätutrustning
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Utveckling av leverantörsutvärderingar i stora byggföretag -En fallstudie hos PEAB
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Mätningar och undersökning av elkvaliteten i elnätet på reningsverket GRYAAB, i Göteborg
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Anpassade energisystemlösningar för passivhus - med hänsyn till byggnadens värmekapacitet
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Miljöanpassade tjänsteresor. En kvalitativ studie av privata aktörers resepolicy
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Arsenikförorenad mark efter träimpregnering : fastläggning, spridning och efterbehandling
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Effektivisering av kvävereduktionen i en konstruerad våtmark avsedd att behandla avloppsvatten
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Utformning av utskovskanaler och nedströmsslänter : En jämförelse av energidissipation vid överströmning av fyllnadsdammar
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Utvärdering av Raman- och IR-spektroskopi, differentiell svepkalorimetri och dielektrisk spektroskopi för materialstudier på choklad
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Spänningsstyrd underfrekvenslastfrånkoppling i elektriska kraftsystem
This report is a Master?s Thesis performed by Andreas Adolfsson and David Jacobsson atChalmers University of Technology. The purpose of this master?s thesis is to evaluate anew method for load-shedding, the voltage controlled underfrequency load-sheddingdeveloped by ABB. This report presents a comparison between conventionalunderfrequency load-shedding and this new method for load-shedding.
Statuskontroll av Paradisskolans elektriska belastning
In this thesis is studied the electrical load of Paradisskolan with respect to power quality and energy consumption. The school's owner Trollhättans Tomt AB is also interested to know if they can reduce their costs by changing to smaller meter fuses. A recurring ground fault that?s been recorded from powerpanel A1A has been investigated. The school's equipped with an electrical bonding system, harmonic filters for the third harmonic currents, TN-S system from feeding transformer and groundfault monitoring.
Åsktransienter och överspänningar : En spänningsfylld simulering av elkraftsystemet vid Forsmark 3
A power system will inevitably be subjected to transient overvoltages, most often produced by switching operations and lightning strikes. These transient overvoltages may harm sensitive equipment without sufficient protection, but it is not an easy task to predict what transients may occur or how they affect the system. A fault occurred in a low voltage system at Forsmark 2012 and overvoltages from lightning were concluded as the probable cause. The three aims with this thesis are to develop and test a model of the power system at Forsmark 3, analyse the transient behaviour of the system when subjected to lightning surges and identify critical parameters, and lastly to provide a tool for investigating the protection of the system. The modelling and simulations were performed in the freely available simulation program LT Spice.