Sökresultat:
9100 Uppsatser om Geothermal heat pump system - Sida 17 av 607
Effekter av tidiga reflektioner vid musikreproduktion
In this project the focus has been on the system for recombination at Oskarshamn 2. The recombining systems have on several occasions switched paths due to low pressure before the last ejector that?s feeding the recombiner. Of the mentioned reason, events and several measuring points have been analyzed in this report since the installation of the recombining systems.In order to prove theories and demonstrate what may be the cause of this problem, we used heat balance calculations by the program Probera. Using the program, we can demonstrate that the catalytic process does not reach the desired temperature with the amount of combustible substance.
Utredning av solenergi för drivning av sorptiv kylprocess för inomhusluften på Stockholmsarenan
Cooling down the indoor air can be done in several ways. One way is desiccantcooling which will be used at the Stockholm Arena. This method is used in airhandling units that use temperature changes and moisture fluctuations in the air. Oneof the steps is to add heat during the cooling process in order to reduce the relativehumidity of the exhaust air. The air passes thru an adsorptions rotor which thenabsorbs moisture from the supply air.
KORTSIKTIG PRODUKTIONSPLANERING I MINDRE FJÄRRVÄRMESYSTEM : En studie vid Strängnäs Energi AB
District heating covers around 80 % of the heating demand in apartment buildings and 10 % in single-family homes in Sweden. In the year 2010 the total input of energy to the Swedish district heating grids was about 70 TWh, which corresponds to 11 % of the total energy input to the whole energy system in the country. Through the combined production of heat and power the CHP-plants often reaches an efficiency of 90 % from energy in the fuel to produced heat and power. In order to keep the efficiency high it is important for the owners of the plant to have good knowledge about the plants performance at different operation points. Strängnäs Energi AB initiated this diploma work together with FVB Sverige ab in order to come up with a program for short term planning of the production of heat and power at the company´s CHP-plant.The work consists of three main parts.
DATORSTÖD FÖR ARBETE : KONSEKVENSER FÖR VAL AV AFFÄRSSYSTEM En studie av en service- och supportavdelning
This report is focusing on problems with introducing standard enterprise resource planning systems (ERP) in businesses. A study has been carried out on a service and support department at a Swedish heat metering company, SVM North Node. The study aims to help the company become a better customer in choice and customization of a new ERP system. We make a description of the department studied and the work carried out there, on the basis of learning, knowledge and cooperation. As a final point we present some ideas on how computer systems could support their work, hoping that this will result in them making adequate demands on a new ERP system..
Beräkning av pumpkapacitet samt konstruktion av pumpfundament
Ett undersöknings- och utvecklingsarbete för att lösa ett problem med att dränkbara pumpar i ett vattenavrinningssystem gick sönder med perioder på två år i genomsnitt, utfördes i samarbete med Cementa AB i Skövde. Orsak till pumpars haveri söktes och fanns vara bristande rutiner och kunskap om det underhåll pumparna krävde. För att lösa detta problem utvecklades riktlinjer för nyinköp av torruppställda pumpar för att möjliggöra kontinuerligt underhåll. Då möjligheter för placering av torruppställd pump saknades utvecklades ett pumpfundament för placering av torruppställd pump. Krav för utvecklingsarbetet togs fram i samarbete med Cementas underhållsavdelning och teoretisk dimensionering av dränkbara länspumpars dåvarande volymflödeskapacitet utfördes.
Kundorderstyrning : Möjligheter och konsekvenser för Johnson Pump
Examensarbetet har utförts på Johnson Pump AB i Örebro och behandlar tillverkningen av marina kylvattenpumpar. På den allt mer globala pumpmarknaden har konkurrensen blivit hårdare och Johnson Pump har märkt ökade krav på främst kostnadseffektivitet och leveransprecision. Samtidigt efterfrågas ett brett sortiment. I dagsläget har man dock problem med långa ledtider och höga lagernivåer, varför man på senare tid har ställt frågan om det bästa vore att kundorderstyra tillverkningen inom det marina affärsområdet. Syftet med arbetet är därför att undersöka möjligheterna att övergå till en högre grad av kundorderstyrd produktion och se vilka konsekvenser detta skulle medföra på kostnader och leveransservice.För att det ska bli möjligt för Johnson Pump att tillverka pumphus mot kundorder, måste planeringen bli tydligare och mer strukturerad.
Utvärdering av jetomrörning : En studie gällande utvärdering av omrörningssystem vid Ekeby reningsverk
Biogas is a renewable energy produced through anaerobic digestion, which means that organic matter is degraded by microorganisms under anaerobic conditions. The produced biogas can then be used for cogeneration, electricity, heat or upgraded to vehicle gas. Eskilstuna Energy & Environment AB has four digesters at Ekeby water sewage treatment plant, Eskilstuna. One of the biogas reactor (RK4) is equipped with a jet-mixing system while the remaining digester uses top-mixing. The mixing system is an important parameter to achieve optimum operating conditions for the process regarding gas production and degree of digestion.
Konstruktion och montering av ett gasspjäll för en HCCI-motor.
Denna rapport handlar om införandet av ett gasspjäll i den HCCI motor som utvecklas påKungliga Tekniska Högskolan (KTH) i Stockholm. Detta gasspjäll styr effekten ocharbetssättet i motorn. Med en gasspjäll är det möjligt att byta från gnistantändning tillHCCI-läge. Under projektet har många andra områden förbättrats, till exempel luft- ocholjepump. För att dra slutsatser är det nödvändigt att analysera några av motorns data sominsamlats under utvecklingen, såsom cylindertryck, insprutningsdata och tändläge.
Smörjning Av Lager
The work thesis was performed at Assalub a company which is situated in Åtvidaberg. The company works with developing, manufacturing and marketing equipment for handling of lubricants for light and heavier industry. The work thesis it is based on a inquiry Assalub got from MacGregor which is a company within cargo solution, from port to offshore system.For unloading grain and other material from the ship cargo it is used combined inlet feeder and screw conveyor, there the inlet feeder is drilling down through the cargo and feed the screw conveyer with material to further destination. At the bottom of the screw conveyer and the inlet feeder there is a bearing that keep the parts together. However the lubrication of the bearing must be made manually.
Sekundärnät för lågtempererad fjärrvärme
Lower energy use in buildings is a result of increasingly stringent energy requirements across Europe. When conventional district heating technology is used in areas with low energy consumption heatlosses do not fall even though the amount of energy delivered is reduced. This reduces income for thedistrict heating company. To maintain their economic viability the district heating companies? majorchallenge is to implement new solutions that minimize heat loss.
Produktutveckling och prestandatest av ett vattenvärmedrivet torkskåp : Jämförelse mellan tre utvecklade versioner av ett vattenvärmedrivet torkskåp
AbstractElectricity consumption is a globally increasing problem caused by the high share of electricity produced in coal power plants. These contribute to high carbon emissions when only about 1/3 of the heat generate electricity and the remaining 2/3 of the heat cools off. Combined heat and power plants (CHP) have high efficiency because they use the residual heat for domestic heating. The CHP plant often use fuels from renewable resources, giving them a lower carbon footprint, but are also depending on the heat demand. If electric powered products such as drying cabinets convert to heat powered products more environmentally friendly electricity will be produced by CHP plants, which can supplant electricity, produced from coal power plants and reduce carbon emissions.
Det självförsörjande passivhuset
The housing sector uses 40 % of the energy in Sweden and half of the electricity usage. Theuse of energy is the main reason to the increasing rate of carbon dioxide in the atmosphere.This is the main motive but also a wish of higher safety, that is a higher rate of selfsufficientenergy production in Sweden, we want to decrease the need of using fossil fuel. Now whenthe energy price rise, the interest in energy issues increase and more people discuss thepossibility of reducing the usage of fossil fuel. A change to renewable energy such as sun,wind and water is the only solution where we can get a sustainable development.One way to contribute to a better use of energy is to build in the principle of passive house.The house is being built with a thick and tight insulation. If you use a heat-exchanger withhigh degree of efficiency and a final heating battery on the ventilation system, the heat fromlamps, devices and the ones living in the house should be enough to fulfil the criteria ofliving.
Delta X : Utveckling av värmeväxlare
Stockholms vattenskärning AB in Kungsängen has through the acquisition of a company begun to design and produce aircraft heaters whose origin is early 1970s which follows a high inefficiency in terms of energy consumption and size.The aircraft heater, which is sold worldwide, serves its purpose for customer satisfaction and has done so ever since it was developed in the 70s.Stockholms vattenskärning AB is now investigating the possibility in making the aircraft heaters more efficient, both in terms of energy consumption but also on a more efficient design with the belief that it would lead them to an edge in the market. The aircraft heater consists of several main components whose function altogether is to keep passenger aircrafts warm while they are on the ground.This project has been limited to the further development of the heat exchanger package which accounts for the conversion of the hot medium to the fresh air being carried in to the aircraft cabin. Work has been divided into different phases in order to create a better understanding of the project range and to make it easier to divide the various elements in the time available, 10 weeks. These phases are literature review, situation analysis, concept generation, CAD, concept comparison and writing reports.After the initial literature review was made, a fundamental theory was written which is essential in understanding the remaining parts of the project.With the theoretical part as support, measurements and calculations were made on the current heat exchange package in a situation analysis to ensure its operation and efficiency.In the concept generation phase, the collected facts from the literature review was used as the basis for creating a matrix. The purpose of the matrix was to indicate the two most suitable types of heat exchangers to develop four new concepts out of.In the CAD phase the four concepts was drawn up and then described with text and images.The last phase is the concept comparison where a concept selection matrix is used to function as a decision basis for further production at Stockholms vattenskärning AB. The four concepts have been developed based on the current heat exchanger and is gradually changed into a design of a cross-flow heat exchanger constructed out of stainless sections. The purpose of this is to have gradual upgrading of the heat exchanger as an option, in order not to saturate the market..
Dose-related selection of Pradofloxacin resistant Escherichia coli
The study evaluated the Mutant Prevention Concentration (MPC) of Pradofloxacin on three Escherichia coli (E.coli) strains, 2 wildtypes and one first-step gyrA resistant mutant. We also measured the value of AUC (Under the Concentration)/MPC that prevents growth of resistant mutants. It is of importance to reach a concentration above MPC that prevent E.coli from developing resistance against the antibiotic.We used an in vitro kinetic model where we added bacteria? and antibiotic. The culture flask was attached to a pump with an adjustable pump-speed.
Solvärme till Östersunds Rehabcentrums terapibad : Förstudie av förutsättningar för, - och lönsamhet med, solfångare för att värma terapibadet
This report treats whether it is viable to invest in solar heating to heat the therapy pool at Östersunds Rehabcentrum. The rehab center is owned by the county council of Jämtland and is located on Solliden in Östersund city. The solar heating where supposed to be a complement to the district heating that was heating the pool in the current situation. Later, it however showed that this was not the case. The pool is currently being heated by a radiator circuit that is being heated by the district heating.