Sök:

Sökresultat:

2932 Uppsatser om Energy efficent building - Sida 61 av 196

Geotermisk fjärrvärme i Gunsta

Gunsta is situated about 10 km east of Uppsala. Today there are plans to establish 1000 new households in Gunsta before year 2030. The required energy for heating houses and water would be distributed via a district heating system, which also includes 200 existing residences. The annual required energy, according to this study, would be 16.2 GWh with a maximal peak effect of 6.9 MW. To meet this need, the study suggests a system with heat pumps to upgrade the 31?C water from a 1.8 kilometre deep borehole.

Nötköttsproduktion i Västerbotten

Beef production in Sweden has traditionally been about rearing of dairy calves to slaughter. With reduced number of dairy cows and accordingly less dairy calves for slaughter, there has been a need for new forms of beef production in Sweden. In Västerbotten there are good conditions for beef production with a high feeding level of roughage due to favourable climate. The aim of this thesis is to, through interviews with ten farmers with beef production in Västerbotten, study what and with how much they feed their animals and link the results to production level. The thesis begins with a literature review where the general feeding standards and feeding recommendations for beef cows and growing cattle are examined.

Framtagande av OEE-mall

At Volvo Cars Torslanda's paint shop there is a requirement to in a fast and effective way get an overview of the plants capacity. Therefore a capacity template was constructed as a tool for the engineers at Volvo several years ago. This template has during the years become complicated and outdated. Thus this thesis work will resort as a new capacity template, built from scratch. The new template has been built up based on requirements from Volvo and the concept of OEE (Overall Equipment Effectiveness).

Upprättande av mall för fuktsäkerhetsbeskrivning : Genom granskning av projekt ur fuktsäkerhetssynpunkt

During the 1990?s a large number of building projects were revealed where lack of moistsafety precautions during the construction process had led to extensive moisture damage. Alsoresent implemented studies have shown that the problems with moisture damages have ratherincreased than decreased during the past few years. Moist is considered to be one of the mainfactors to cause unhealth due to deficiencies in the indoor-environment and does also causeunnecessary expenses and a reduction of the confidence in the construction industry.In this Bachelor of Science thesis three projects have been reviewed to examine how moistsafetyhas been observed during the construction process. Main focus has been to identify thebuilding components that are the most exposed to moist, and to examine how they have beentaken into account during the period of design and construction.

Motorikens betydelse för inlärning

AbstractMy purpose with this study is to find out if it helps children who have diffuculties with their concentration if they get to practise their motor behaviour knowledge during their day at the school to promote their learning capacity. My purpose is also to find out how schools works with motor behaviour training. To get answers to my questions have I done interviews with four educationalists and I have also used books and internet sites. Motor behaviour is of importance to how children learn things in the school, without a well working motor children gets difficulties to sit still and to concentrate. The children may put their energy at the wrong things in the classroom, when the energy instead should be need to learning things.

Varumärkesbyggande inom småföretag: en fallstudie om hur småföretag skapar värde genom sitt företagsnamn

This thesis intended to examine how small enterprises within the retail industry work with brand building of their corporate name. More specifically it intended to examine how they do to choose corporate name and corporate logotype, and how they work to create a desired corporate image. A case-study was performed with three case-companies from different industries. The method was deductive as the empirics were brought in with starting-point in the theoretical frame of reference. The study showed that there are differences in the way small enterprises within the retail industry work with the brand-building of their corporate name.

?Vård i annans hem? - användning av arbetsmaterialet i Huddinge kommuns hemtjänst/boendestöd och personlig assistans

AbstractThe importance of good construction planning affects the final costs of the production and the timing of the project. Planning for building projects has been studied with the aim of identifying how three week planning appears in the construction industry today.A case study has been conducted in Navisworks Simulate to assess whether the software is suitable to connect the task schedule with the BIM model to create a 4D model. 4D models are used for performing 4D construction simulation to visualize the project. In order to use the benefits of the model, investment in equipment and software is required. This means higher costs for the companies.

Byggnads- och investeringskostnader : Robotmjölkning eller konventionell mjölkning?

This project is based on my fathers farm which lays outside Löberöd, twenty kilometres south of Eslöv in Skåne. While my family for some time have thought about building a new milkingstable with AMS(Automatic milking system) I decided to compare the AMS with a conventional milkingstable. We are abit concerned about how many cows we should have in the new stable. Because of that I calculated with two different number of cows. I have compared three different types of milking stables: One alternative is 180 cows milked in a double eigth hearing bone milking stable. The second alternative is 128 cows milked with two DeLaval VMS-robots. The third alternative is 171 cows milked with three DeLaval VMS-robots. One salesman from DeLaval and one salesman from A-betong helped me to get marketprices on the milkingrobots, building, ventilation and prices on all the concrete. In all the costs labour is included. The rest of the costs are calculated in a softwareprogram called K-data 03 which is a program with predicted costs. The calulations from the program showed that the price in the milkingpit system was 51 000 sek per cow.

BIM i planeringsarbetet : Effective planning by using BIM

AbstractThe importance of good construction planning affects the final costs of the production and the timing of the project. Planning for building projects has been studied with the aim of identifying how three week planning appears in the construction industry today.A case study has been conducted in Navisworks Simulate to assess whether the software is suitable to connect the task schedule with the BIM model to create a 4D model. 4D models are used for performing 4D construction simulation to visualize the project. In order to use the benefits of the model, investment in equipment and software is required. This means higher costs for the companies.

Passivhus ? lönsamhet och komfort

In this essay, we have compared a conventional house to a passive house. The housesshared the same local conditions; they have the same living area and the same layout. Thedifferences between the houses were the different construction solutions for the roof, theouter walls, the floor and the heating system. Both the houses qualify the standards fromBBR and the passive house also lives up to FEBY?s special conditions.The purpose with the essay was to examine if it really is profitable to build small hoses aspassive houses.

Metoder för lastprioritering i fjärrvärmecentraler

A problem in the field of district heating is the oil burners needed to provide power when a peak load occurs. One possible way of reducing the needed amount of oil is to reduce the power demand for space heating in the district-heating substations when the need for district heating water exceeds a certain limit. This can be done by use of a locally working controller function.In this Thesis the options concerning load priority are evaluated. To evaluate the potential for using controller functions concerning peak load priority an experiment was brought out in a chosen district-heating substation. The impact on the indoor thermal comfort during a heat reduction was also taken into account.

Kartläggning och analys av tjänsteprocessen i IKEA-varuhus ur kundens perspektiv

This thesis has been done in collaboration with Peab Stockholm Building 3, which is a region within the Peab Sverige AB. The report is based on a survey and studies of Peab business management systems and production literature. For general information gathering has literature from well-known sources collected in libraries and through the Internet. It shows through the work that Peab has routines for experience feedback in the construction process, but that these procedures work in a small scale and the practical work experience feedback does not work at all. This is also something the construction industry in general also perceived as problematic. The questions in the report are of a wide scale and concerns construction errors cost, how the employees perceive that the company takes advantage of the skills and the mental stress in production line. The goal is to find how Peab Stockholm Building 3 will work on the experience feedback to allow for better productivity. In conclusion, the report author tries to demonstrate what can lead to increased productivity and improved work experience..

Urban Building vid Hornsbruksgatan

Mitt mål var att skapa västra söders identitet och samlingsplats, vilken helt saknas idag. Utmaningen var också att transformera Hornsbruksgatan från en baksida till en tillgänglig plats. Högalidsparken förlängs ner till gatunivå - Hornsbruksgatan blir en blandning av park/ torg genom ett specifikt grönt plattsystem. Nya stråk och ramper binder ihop nuvarande gatu- och parknivån. Bebyggelsen är småskalig och nätt, ändå är programmet större än förslagit proram.

Småskalig elproduktion i Arvika

Arvika Fjärrvärme AB, a district heating company from Arvika, today cover 74 % of their total energy production with biofuel wich runs a 16 MW bioler giving process water at saturated liquid state.In recent years Vaporel AB has introduced a new tecnique that gives an external generation of steam after boilers. The concept is built on an adiabatic pressure drop of the saturated liquid in a so called Flashbox which makes a small part of the liquid to evaporate. The generated steam is lead into a turbine where electricity is in a conventional manner.The purpose with this rapport was to do a basic study for the specific system at Arvika where it?s possible to see the potential production of electricity that follows an installation of a flasbox.The final goal was to introduce an economic analysis of a flashox installation at given conditions.To reach our goals we have created a model in Excel where we used the given conditions at Arvika Fjärrvärme to do our calculations. The model has been tested at three different states, of process water returning to potboiler, to be able to decide the optimal operation for the system at present.The studies have resulted in a pressure of the processwater at 14,5 bar (at) and a pressuredrop to 9,5 bar (at) in the flashbox.

Energieffektivisering på Vista

Sweden has distinct seasons with cold winter and temperatures down to minus 25 ?C andpleasant summers with temperatures above 20 ?C. During spring and autumn there could becomechallenges with precipitation. The diverse climate in Sweden affects many homeowners. For thepeople living in leisure boats and permanent housing boats the seasonal changes are clearlyimpacting their economy and the indoor climate.

<- Föregående sida 61 Nästa sida ->