Sök:

Sökresultat:

3495 Uppsatser om Employment and Lean production - Sida 61 av 233

Körplaner hos Solna Pressgjuteri : En undersökning av bristerna i användandet av ERP-systemet

This thesis investigates lacks in today?s use of the ERP-system Mapaz Affärssystem inthe production planning at Solna Pressgjuteri, and possible improvements. Today thedates calculated by the program to plan the orders are inaccurate and the ordersequence is not optimal, and therefore continuous manual corrections are needed.The approach was to study the program Mapaz to understand how it works, andidentify available parameters for input and output in the different tools offered in theprogram. By studying old lists of planned orders and relevant parameters in Mapaz forindividual orders, production groups, products and operations, the connectionbetween input and output parameters could be understood.Participating in planning meetings and discussions with the company behind theERP-system identified the current usage, desideratum and possibilities with theavailable tools. These were then matched to describe the reasons to the insufficientplanning and form possible actions for improvement.The work has showed poor understanding for the ERP-system and its functions, assome tools intended to assist the planning were not used, and some even usedincorrectly.

"Rabarbers" - Processen med texten

The essay is an analysis of the theatrical and dramatic aspects to a playtext. Based on the production and manuscript Rhubarb by Maria Blom.With the essay I intend to answer the following questions: What happens to the manuscript Rhubarb during the transformation from being a dramatic text to becoming a theatrical text? What are the similarities and differences between reading a manuscript and watching the performance of a play?The essay is based on literature, two interviews with Maria Blom and the manuscript to Rhubarb by Maria Blom. Besides two versions of the script I also had the opportunity to watch videotaped material from the original production. And I compared the original cast of Rhubarb with twoamateurproductions of the play..

Alternativ till obedövad kastrering av smågrisar : - Ur ett ekonomiskt och djurhälsomässigt perspektiv

This degree project aims to evaluate alternative methods to the unanaesthetized castration of piglets. Castration of piglets is performed to prevent the development of boar taint. Boar taint can cause great financial losses for the pig manufacturer. Unanaesthetized castration of piglets is not regarded to be satisfactory from an animal welfare perspective and the procedure will for that reason be outlawed in the near future.Several alternative methods are used in countries all over the world with promising result. The purpose of this study is to evaluate if this methods could be applied in Swedish pig production.A literature study has been combined with interviews; field studies, questionnaires and a small study on male pig production.To be applicable to and applied in Swedish pig production the alternative method must be financially accepted by the manufacturers but also accepted from an animal welfare perspective.Castration is the only way to guarantee a meat free of boar taint.

Framtidslayout för Hållarefabriken, SKF Göteborg

Examensarbetet genomfördes under hösten 2005 på Hållarefabriken, SKF Sverige AB, i Göteborg. Projektgruppen bestod av två civilingenjörsstudenter från instutitionerna Arbetsvetenskap och Industriell Ekonomi och Samhällsvetenskap, vid Luleå Tekniska Universitet. Arbetet ?Framtidslayout för Hållarefabriken, SKF Göteborg? handlar om att ta fram en layout för Hållarefabriken som visar hur fabriken kan se ut om 10 år. Hållarefabriken tillverkar hållare, som är en komponent i ett rullager.

Förbättring av nybesöksprocessen för kortare patientväntetider

Den svenska sjukvården kommer under de kommande decennierna att ställas inför stora utmaningar. Patientbelastningen väntas öka till följd av en åldrande befolkning som till största del utgörs av den stora generationen av 40-talister. Situationen kommer att kunna bli synnerligen allvarlig då många av Sveriges sjukhus och mottagningar redan idag har långa patientköer som i många fall inte klarar av att leva upp till vårdgarantin på maximalt 90 dagars väntan från inkommen remiss till genomfört läkarbesök.De senaste åren har emellertid ett trendbrott kunnat skönjas. Många sjukhus har startat omfattande förbättringsprogram med målsättningen att nå högre effektivitet och kvalitet i verksamheten, däribland Skånes universitetssjukhus i Lund och Capio S:t Görans sjukhus i Stockholm. Förbättringsprogrammen har visat mycket goda resultat såsom kortare patient-köer, kortare väntetider, högre kvalitet i vårdresultaten samt större patientnöjdhet.

Effektivisering av destruktionsprocess : En förstudie om hur Fresenius Kabi kan effektivisera befintlig destruktionsprocess

This thesis is a feasibility study into how Fresenius Kabi may rationalize their destruction process in regards to cost, recycling, and work environment. The two main objectives are to identify scrap flows and the possibility to improve or replace the equipment that is now carrying out the physical scrapping. The flow has been visualized by a flow chart of the material and communication. A chart of the problem established to visualize where improvements are necessary. Based on the problems proposals are presented on how to improve the flow thru the plant.During analyze of the physical scrapping equipment it was also necessary to take a deeper look at how they are carrying out there work today, how does the procedure look like, working environment and where are the weaknesses.

Fick algblomningen i Östersjön 2005 några ekonomiska effekter? : Fallet turistnäringen på Gotland

Algal bloom is a naturally occurring phenomenon and occurs in all waters around the world but in recent years, algal bloom in the Baltic Sea has become more massive and more widely spread. When an algal bloom negative effects on the seawater quality, it may have an impact on tourism in the Baltic Sea. The aim of this thesis is to study, through a survey based on a production function approach, whether an environmental change as algal blooms, influenced the Gotland tourist accommodation industry and their "production of attractive overnight? in the summer of 2005. The results show that algal blooms did not have a great impact on companies ?production of attractive accommodations".

Biogaspotential vid samrötningav mikroalger och blandslam från Västerås kommunala reningsverk

Because of the increasing trends in energy consumption and increased environmental awareness, greater focus has been placed on improvement and development of renewable energy sources. An already proven and accepted method is biogas production from anaerobic digestion at municipal wastewater treatment plants.In the waste water treatment process solid material and dissolved pollutants are separated from the water, forming a sludge. The sludge is separated from the process and stabilized during anaerobic digestion or aerobic aeration. Most often, mesophilic anaerobic digestion is used. Because of degradation by microorganisms, biogas with a high content of methane is formed during the digestion.

Svenskt Sigills kvalitetssäkring av spannmål :

Today there is a limited demand for quality certified cereal in Sweden. The demand can in the future increase and become a requirement for the entire market. Since the first of January 2005, grain producers in Sweden are food producers and traceability is important for the food industry. It is possible for grain producers to certify the productions under the certification IP SIGILL. The purpose of this essay is to explore why some grain producers continue to be certified while other producers end the IP SIGILL certification.

MILJÖCERTIFIERINGSSYSTEMET MILJÖBYGGNAD I PRODUKTIONEN : En fördjupning inom området ?Material?

The environmental assessment system Miljöbyggnad is a Swedish system initiated by Bygga-Bo-Dialogen to assess buildings with regards to three main areas; ?Energy?, ?Indoor climate? and ?Materials?. A building can obtain three different classifications depending on how well it manages to meet the demands. GOLD is the highest classification and is followed by SILVER and BRONZE. The majority of the measures needed to comply with the demands are done during the design phase.

Småhusproduktion : Utvecklingsmöjligheter hos JM AB

The Swedish building contractor JMRegion Öst would like to to investigatethe possibilities of developing andstreamlining the production of singlefamilyhouses. JM are producing singlefamilyhouses with prefabricated framesat a rate of about two houses per week.During construction, the different tasksare performed by JM?s own productionstaff but also by varioussubcontractors.When examining the schedules of recentlyproduced projects, it appears that allthe houses are more or less completedeight weeks before the customer moves into the house. During those eight weeksseveral operations are conducted such asinspections, installation of appliancesand cleaning procedures. The inspectionperiod constitutes between 25 and 35% ofthe complete construction period.By conducting interviews, it has beendiscovered that this final phase is anessential security buffer for delays anderrors that often occur.

Lean inom offentliga myndigheter.

Systemutveckling har länge kantats av problem och oförmåga att möta nya problem och krav som uppstår under processen från ide till färdig produkt. För att möta de problem som de traditionella systemutvecklingsprojekten innebar så arbetade Ken Beck et. Al. (2001) fram det agila manifestet, det agila manifestet beskriver de kärnvärden som systemutvecklingsprojekt bör arbeta utefter, detta för att öka flexibiliteten och minska problemen med långa ledtider.SCRUM är en agil systemutvecklingsmetod som togs fram av Jeff Sutherland och Ken Schwaber, detta efter att de båda hade sett behovet utav en metod som klarade att möta snabba förändringar och att kunna möta problem under processens gång.För att undersöka hur hantering av problem i agila systemutvecklingsprojekt fungerar i praktiken har en fallstudie genomförts på ATS väst hos CGI.En stor del av problematiken i systemutveckling är distansen mellan de inblandade parterna, något som påverkar arbetsmetodiken. Detta resulterar i en mer omfattande dokumentation än vad den agila arbetsformen förespråkar och minskar även den personliga kommunikationen.

The Way We Produce : Möjliga kvalitetsförbättringar på Atlas Copco

The purpose of this master?s thesis was to find problems that occur in the production line at Atlas Copco Rocktec Division, in order to decrease the costs of defect in quality. When the problems were distinguished, the authors ought to choose the problem with the highest improvement potential. One request from the constituent at Atlas Copco Rocktec Division was to connect the improvement to the document The Way We Produce. The document provides information and values about Atlas Copco and consists of 10 principles to be able to reach their vision.

EKONOMISTYRNING I EN MOTORVERKSTAD: En analys av centralt ställda krav ur ett operationellt perspektiv

The purpose of this thesis is to analyze the design and function of an engine production management?s control system and its intended function, and to contrast it with the present management control systems in use on an operational level. Interviews conducted with employees from all levels of the engine production are the main source of this study?s empirical foundation. Information has also been gathered from relevant written material such as annual reports, internal documents etc.

Statusbedömning av asynkronmotorer

Induction motors, often referred to as the workhorse of the industry, play an important role in production today. Therefore, it's important to diagnose any faulty induction motor prior to failure to avoid costly and time consuming production stops.This thesis compares methods for diagnosing induction motors in operation, MCSA, Park's vector approach and the standard method used by Swedish industries today. By simulating broken rotor bars and short-circuit in one of the windings, each method is tested and the results are compared using matlab.The results need further verification due to uncertainties of the condition of the test motor, even though the experiment gives a hint of the different advantages of each method. A combination of the methods should be able to tell if the motor needs further examination..

<- Föregående sida 61 Nästa sida ->