Sök:

Sökresultat:

3339 Uppsatser om District Heating Production - Sida 6 av 223

Samband mellan lågt tryck i dricksvattenledningar och magbesvär - En utredning av hur lågt tryck på dricksvattenledningsnätet vid lagning av läckor påverkar sjukligheten hos Göteborg Vattens abonnenter.

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Ljudisolering i prefabricerade betongstommar. En fältmätning av luft- och stegljudsisolering.

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Utredning av solenergi för drivning av sorptiv kylprocess för inomhusluften på Stockholmsarenan

Cooling down the indoor air can be done in several ways. One way is desiccantcooling which will be used at the Stockholm Arena. This method is used in airhandling units that use temperature changes and moisture fluctuations in the air. Oneof the steps is to add heat during the cooling process in order to reduce the relativehumidity of the exhaust air. The air passes thru an adsorptions rotor which thenabsorbs moisture from the supply air.

Biogasanvändning vid Käppalaförbundets Reningsverk: ? en värdering av miljöeffekter

This thesis calculates and compares the values of improved environmental quality due to future possible investment alternatives in biogas production facilities at Käppalaförbundets Reningsverk (Käppala Sewage Treatment Works) in an attempt to determine which alternative yields the highest such value. Käppala faces three investment alternatives for the usage of biogas. The alternatives are production of vehicle fuel, district heating and thirdly, heat and power production. Estimates of the value of environmental change are calculated for each of the three investment alternatives, and these estimates are then compared. The environmental change in question is the change in discharge levels of carbon dioxide (CO2), nitrogen oxides (NOx), sulphur dioxide (SO2) and particle matter.

Frånluftsvärmepumpens möjligheter i flerbostadshus

If a building is heated by a heat pump, it is of high importance that the heat pump has a high coefficient of performance. An exhaust air heat pump extracts heat from the building?s exhaust air. The air has a relatively high and constant temperature all year around, leading to a high seasonal coefficient of performance. This thesis examines whether it is profitable to complement an exhaust ventilation system with an exhaust air heat pump in an apartment block that already has geothermal heat pump, district heating, oil- or biofuel heated system.

Jämförelse av solhybrider

Research in solar energy is taking big steps in both solar heating and solar electricity. It´s not only the technologies alone, but also the combination of both solar electricity and solar heating which is what is called a solar hybrid. The idea of a solar hybrid is that a solar cells efficiency decrease with increased temperature and can with help from a solar collector be cooled and the heat can be utilized. This thesis report compares heat production and electricity production with respect of, in first hand, a solar hybrids geometry in the cooler. The theory chapter describes solar heating and how different solar cell technologies work and their environmental impact at the production and how compatible these technologies are for the solar hybrid.

 Solenergi En del i ett långsiktigt, hållbart byggande

The sun is essential to life on earth and no matter where you are, there is a constant need ofenergy. Nearly 800 000 years ago man learned for the first time to use fire in a controlled way.Since then, fire has given us the opportunity to inhabit places despite a cold climate. In Swedenthe resident sector accounts for a major part of the total consumption of energy. In a time whenenvironmental issues and greenhouse effects are increasing, we also see a future of rising energyprices. With this perspective, we have in this bachelor thesis in the Building Environment at theRoyal Institute of Technology, KTH, in Stockholm decided to focus on the renewable energysource, solar energy.The energy from solar radiation is a free resource and does not have any negative effects uponthe environment.

Utvärdering av ett större bergvärmesystem i en flerbostadsfastighet som har konverterats från fjärrvärme

This master thesis is an in-depth study of an existing heating system at a household cooperative in Uppsala that has been converted from district heating to a bedrock heat pump system. The study focuses on an economical system optimisation of the building?s complete heating system. The aim was to determine how well a heat pump system in large buildings actually work, find out possible ways to optimize the existing system and point out important system parameters for new heat pump installations in larger buildings.The project points out a possible energy cost reduction of 45 % without investment and further cost reductions with equipment investments. A reduction by 30 % is possible by improvements in the regulation system and 15 % is possible by maintaining the brine system.

Fjärrvärmesystem

This is a report written for an examination project C-level, on the subject of energy. The examination project is a product of the FVB Sweden AB (district heating bureau). It started with a meeting with Stefan Jonsson FVB Sweden AB, were he explained the content of the project, and from this a presentation of the problem was made. The problem that needed to be solved was how they could control the valves in the system to provide heating to everyone in the system. The valves are often oversized so the pump in the heating plant would have to be enormous to be able to provide enough flow to be sufficient, if everyone in the system had there valves fully opened. I came up with two solutions to the problem, one was a wireless network that could keep track of the valves and the other solution was an extra sensor that was placed on the radiator.

Milk production in dairy cows and goats : a case study in the Nyando district inSouth-Western Kenya

Water is an essential factor for both people and animals, and access to water is therefore of great importance. The water access also largely determines the availability of food for people and feed for animals. The aim of this study was to survey the affect of water access on milk production from dairy animals. The study included nineteen farm visits that were made in the Nyando district in Kenya between February and Mars 2011. Farm visits included interviews with questions about for example number of dairy animals, milk production, water access, feed and water routines.

Energimässig jämföelse med investeringskalkyl av två förskolor

This thesis includes an energy survey of the Herrgården pre-school, which has a modern heating- and ventilation system, and a comparison with Östers pre-school which has an older system. An energy survey of Östers pre-school has already been done by a group of three students and all the calculations and values have been collected from that survey. As of today, both pre-schools are heated thru district heating. It will be much easier to make smart and feasible energy-saving-measures by first conducting the energy survey.Herrgården pre-school in Gävle houses 81 children, therteen teachers, one cleaner and one cook. It was finished in the middle of 2009 and the staff has been very pleased with the in-door climate.

Turbinkretspump system - Kraftvärmeverket i Borås

The Rya power plant in Borås produces district heating, district cooling and electricity. The plant is owned by Borås Energi och Miljö AB and is run by Dalkia Facility Management AB.In order to get the best heat exchange from the district hot water a pair of twin pumps and a turbine circuit pump are used as return pumps. Turbine circuit pumps are used to increase the pressure through the heat exchangers at the power plant. The pumps are in use when the flow is over 2 000 m3 h-1 and during the summer when re-cooling is used to improve the effectivens of the heat boilers.Since the pumps, that are parallel connected, rotating at a fixed rate per minute, the pressure is regulated with regulating valves. This report shows that during the 4,300 hours that the pumps where in use, energy corresponding to 590 MWh was wasted.

Förbättrad tillgång till referensmaterial vid röntgentolkning

This thesis includes an energy survey of the Herrgården pre-school, which has a modern heating- and ventilation system, and a comparison with Östers pre-school which has an older system. An energy survey of Östers pre-school has already been done by a group of three students and all the calculations and values have been collected from that survey. As of today, both pre-schools are heated thru district heating. It will be much easier to make smart and feasible energy-saving-measures by first conducting the energy survey.Herrgården pre-school in Gävle houses 81 children, therteen teachers, one cleaner and one cook. It was finished in the middle of 2009 and the staff has been very pleased with the in-door climate.

Robot-Assisterad Gradningscell med Force Control

This thesis includes an energy survey of the Herrgården pre-school, which has a modern heating- and ventilation system, and a comparison with Östers pre-school which has an older system. An energy survey of Östers pre-school has already been done by a group of three students and all the calculations and values have been collected from that survey. As of today, both pre-schools are heated thru district heating. It will be much easier to make smart and feasible energy-saving-measures by first conducting the energy survey.Herrgården pre-school in Gävle houses 81 children, therteen teachers, one cleaner and one cook. It was finished in the middle of 2009 and the staff has been very pleased with the in-door climate.

Utvärdering av magnetiska alternativ till optisk scanning

This thesis includes an energy survey of the Herrgården pre-school, which has a modern heating- and ventilation system, and a comparison with Östers pre-school which has an older system. An energy survey of Östers pre-school has already been done by a group of three students and all the calculations and values have been collected from that survey. As of today, both pre-schools are heated thru district heating. It will be much easier to make smart and feasible energy-saving-measures by first conducting the energy survey.Herrgården pre-school in Gävle houses 81 children, therteen teachers, one cleaner and one cook. It was finished in the middle of 2009 and the staff has been very pleased with the in-door climate.

<- Föregående sida 6 Nästa sida ->