Sök:

Sökresultat:

3339 Uppsatser om District Heating Production - Sida 5 av 223

Primärenergianvändning av passivhus i Sverige : Med fokus på Kvarteret Trettondagen

The building sector accounted for around a fourth of the total energy usage in Sweden in year 2010 (Energimyndigheten, 2012). Therefore it has become very interesting to achieve a lower energy usage in residential buildings. One way to achieve that is to build so called passive houses. By being very well insulated and have low leakage through the walls, they can reduce the energy usage for heating with a substantial amount. The first passive house was built during the 90?s in Germany; and in Sweden the first passive house was built in Gothenburg 2001.

Modellering och verifikation av hjulupphängning för ett ultralätt elfordon

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Hunnebergs Gård ? en förstudie av möjliga verksamheter

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Lågtempererad fjärrvärme i Umeå

People in today?s society are becoming more and more aware of how important it is to use energy as efficiently as possible. This is clearly noticeable by an increase in home produced heat with e.g. solar panels or heat pumps heating systems. These changing customer demands forces district heating technology to be redesigned, which is why there is an ongoing research regarding the next generation of district heating - low temperature district heating (LTDH).

Effektivisering av Byggprocess för PEAB AB Skövde ? Med Fokus pa Fönsterprocessen.

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Företags informationsförmedling i en bostadsköpprocess

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Utformning av förfrågningsunderlag vid totalentreprenader

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Fysikalisk modell av människans spinalkanal för demonstration av skademekaniken vid whiplash-skada, del 2

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Skiftarbetets potential i byggbranschen

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Återvinning av industriell restvärme som värdeskapande process : En fallstudie på SSAB EMEA i Borlänge

The industrial sector accounts for a large share of greenhouse gas emissions. To reduce its negative impact on the environment is crucial in the quest for a sustainable future. In discussions of the industrial sector's impact on the environment guidelines have been highlighted as a tool to assist the industries in their efforts to change the relationship between the consumption of energy and production. This by improving energy efficiency and a shift to the best available technology. During the past 30 years the steel industry has reduced its energy consumption per ton of steel produced by 50 percent.

Varför blev det inte som planerat? En studie över platschefers prognosarbete i anläggningsprojekt

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Produktionskostnader för flerbostadshus En jämförelse mellan JMs projekt i Region Väst och Region Öst

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Hälsomässiga risker på vattenledningsnätet - En studie över samband mellan trycknedsatt ledningsnät och förhöjd risk för sjukdom i tre svenska kommuner

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Analys och beräkning av emissionsfaktorer för växthusgaser

An increased awareness about the global warming has created a demand for more information on how the climate is affected by different activities.This master thesis was initiated by Tricorona, a Swedish company that offers its customers analysis and calculation of their climate impact. Tricorona also supplies climate neutralisation with CERs, in accordance with the Kyoto protocol and controlled by the UN. This work demands updated emission factors for greenhouse gases. An emission factor gives information about the greenhouse gasintensity of a service or a product [kg CO2-eq./ functional unit].The purpose of this thesis is to examine how electricity, district heating, hotels, taxis, food and materials affect the climate and how emission factors for these areas can be calculated.This was done by reviewing and comparing different studies and by interviewing experts. The information was evaluated and recommendations on calculations and emission factors were made.The consumption of energy is the main source of greenhouse gas emissions for district heating, electricity, hotels, taxis and materials.

Energieffektivisering av ventilationssystemet i konsthallen Sandgrund Lars Lerin

Uppsala County has ambitious environmental aims for the planned residential area inÖstra Sala backe. In this thesis different energy sources have been evaluated todetermine which system that would be most favorable given currently availableinformation about the project. Planned energy usage has been divided into tap waterheating, space heating and power. Three base case scenarios were made with districtheating, small scale bio fuel and heat pump. Solar power and solar heating were thensimulated and the production from the two could individually be deducted from theenergy need in the base cases, constituting 9 different scenarios.

<- Föregående sida 5 Nästa sida ->