Sökresultat:
6287 Uppsatser om Design For Assembly - Sida 3 av 420
Produktionslogistik, effektiviseringav materialhantering
Atlas Copco Tools is a world leading company in tool manufacturing. The productionin Tierp works hard to improve their assembly to maintain its position. This thesis isa part of their improvement efforts to be a more Lean production.The main focus for this thesis was to identify the material flow in the kanban system,which used to supply the assembly groups, focusing on the material flow to assemblygroup 9 and the assembly group 3. Group 3's material flow within the kanban systemwas perceived to perform better than the group 9. The handling of kanban materialand their working methods in the two groups was identify those differences whichaffected the kanban system.As an alternative material supply a study were done in kiting.
Automatiserad Konstruktion av Varmkanalsystem
The thesis has been carried out in cooperation with Master Flow AB, Västervik owned by the EWEBE Group. The company produces and sells hot runner systems that are tailor made for the customers.The problem that MasterFlow AB has encountered is in the construction of complex hot runner systems in SolidWorks. With several different lengths, fronts and endcaps that builds the nozzles of the hot runner systems, is affecting the problems for MasterFlow AB. The purpose of this work is to automate the design of hot runner systems so it does not overload the CAD-system SolidWorks.To gain an understanding of the problem, there have been several studies and observations at the company, where the focus has been on how the work is done with the design of hot runner systems. By using help from the corporate management, enough information has been collected to find a solution to these problems.The implementation of design automation has been based on a flowchart that was created.
Produktionsutveckling av bastuaggregatsavdelning
To invent an optimized product is a complicated process. This process is only half of the work. It is equally important to develop a production system that can produce the product in an efficient and ergonomic way.After several evaluations of conceptual and detailed drawings a final idea has come to light.The idea intends, to the maximum extent, utilize the facility in a more efficient way through moving assembly lines and stations closer to the flock section and the stock for complete products. To make the production better, stations are placed in more logical places given the assignment they are supposed to accomplish. This improves the material flow radically.
Värmeväxlare med luftkonditionering för tvättstugor
The energy in laundry rooms, in form heated air, can be utilized with a heat exchanger. A concept and an early prototype of the heat exchanger have already been developed to show that the theory works. This report describes the continued development and construction of the product.A field study was made in order to investigate the environmental usage and establish the product design. The most common washing machine was used as a calculation model, and calculations were also made to estimate the amount of energy in the air. A previous analysis of the existing prototype is also presented in this report, to show the products potential capacity.
Simuleringsmodell över Ålö AB
During year 2004 Ålö AB made significant change in their production process. The production of front loaders is nowadays highly automated with short operation times. To be able to control their process in a better way Ålö recently decided that they needed a tool for simulation of their production and to shift patterns. This final thesis started with a pilot study in Ålö?s factory in Brännland.
Knista kyrkog?rd: ett rekonstruktionsf?rslag f?r den v?stra kyrkog?rden
This study focuses on a reconstruction proposal of a small part of a rural churchyard that has
lost a big part of its history, in form of its conformation and plant material. The chosen part of
the cemetery was established in 1938, and this proposal is an interpretation of the architect?s
original plan, the workers wishes and my own observations and experiences of the place. In this
proposal I have tried to balance the plants composition to create an environment that can benefit
the biological diversity, that fits the locations habitat and today?s maintenance.
Materialförsörjning från förråd till montering : Verktyg vid val av förråd för komponenter
To create a profitable and competitive business an important factor today is a well-functioning logistics. Through effective internal material flows effective logistics can be achieved. Unnecessary handling and movement of materials is a waste which affects the internal material flow. These wastes should be identified and eliminated as much as possible to improve the internal materials handling and through that achieve a more efficient business. At Fagerhults Belysning AB, where professional lighting systems are developed, manufactured and marketed, a new inventory has been built and changes in the assembly has been made during the past year.
Analys av monteringslinan för luftbehandlingsaggregat (EC)
The purpose of the work is to analyze and balance an assembly line at Fläkt Woods in Jönköping. The work is going to answer the questions about today?s throughput time, how much waste that occurs, number of staff at the assembly line, how the supply of material works and possible improvements that can be made at the work stations. The work is also going to give a proposal of improve-ments that can be made.The methods used to get the result include observations and measurements, con-versations with technicians and operators and also data from Fläkt Woods? data-base.Large variations in throughput time are measured during the measure period, from 3 hours up to 5 hours and 35 minutes.
Parametriserad 3D-modell av cyklon : Parametrisering av en 3D-modell av ett cyklonfilter i SolidWorks för snabb framtagning av nya konstruktioner till Outotec Skellefteå
This bachelor thesis project has been executed at Outotec Sweden AB in Skellefteå. Outotecs main business focus is selling mineral and metal processing technologies. A rest product from the metal process is particle-polluted gas and cyclone designs are today the most commonly used abatement device for particle control. A cyclone provides a simple design with high efficiency particle percolation by using air streams.The purpose of this work is to reduce the time it takes create new cyclone designs in Outotecs projects. An extensive construction work is needed for every new cyclone order due to new designs.
Hantering av digitalt designmaterial i kollaborativ miljö
A case study of professional interaction designers' usage of design materials was conducted. Five interviews were performed in order to gain insight in the systems used by designers, how these work, how they collaborate within them, and what they think of recent research about them. Design studios allow collaboration for several users at once. Digital material (mockups, pictures, etc.) are commonly used, but needs to be made analog, e.g. printed, to be usable in the design studio environment.
Produktionsoptimering av elektromagnetiska omrörare - "ORD 43P" och "EM Stabilizer"
Examensarbetet inom produktutveckling ? konstruktion utfördes under perioden februari till juni 2013 och omfattar 15 högskolepoäng (C-nivå), och är den slutliga kursen inom högskoleingenjörsprogrammet Innovation och produktdesign.Examensarbetet behandlade problematiken kring produktionsanpassning och kostnadsoptimering av två stycken elektromagnetiska omrörare vid företaget ABB, Process Automation, Metallurgy i Västerås. Efter kontakt med handledaren från ABB, Jan-Erik Eriksson, påbörjades projektarbetet med att tillverkningsanpassa konstruktionen av produkterna ORD 43P och EM Stabilizer.För att åstadkomma kostnadsoptimerad och produktionsanpassad konstruktion tillämpade författarna följande produktutvecklingsverktyg: Design for Cost, Design for Manufacture och Design For Assembly. För att kontrollera att konstruktionen blev optimal, men också att den inte brister under belastning använde examensarbetarna det datorbaserade hållfasthetsverktyget finita elementmetoden i CAD-programmet SolidWorks.Val av komponenter baserades på komponenternas pris per kilo.För att välja det optimala materialet, det vill säga högsta hållfasthet till lägsta pris använde författarna materialdatabasprogrammet CES EduPack. De utvalda materialen från programmet kunde inte författarna påfinna som standard på marknaden, varför författarna ändrade strategi till att jämföra och välja material utifrån marknadsundersökning av standardmaterial hos leverantörer. ORD 43Ps komponenter optimerades konstruktionsmässigt gentemot befintliga komponenter och härvstag och isolerplattor kostnadsreducerades markant.
Design management i produktutvecklingsföretag : Samarbetet mellan en design manager och en designkonsult
Design management är ett arbetssätt som har börjat tillämpas av allt fler företag de senaste åren, men det kan fortfarande vara svårt att förstå betydelsen av design management. I uppsatsen undersöks det vilken betydelse en design managers kompetens och position har för samarbetet mellan det designköpande företaget och en designkonsult under ett designinköp. Genom ett flertal intervjuer, utifrån både design managers och designkonsulters perspektiv, undersöks det hur samarbetet fungerar mellan dessa parter. En analys av intervjumaterial med hjälp av en teoretisk referensram bestående av design management-teori, design som en integrerad process och beslutsrollsteori har lett fram till ett antal slutsatser om design management. Några av slutsatserna är att design management, enligt teorierna, som arbetssätt inte är så vanligt och att det finns en viss samarbetsbrist enligt de intervjuade designkonsulterna, som i viss mån underlättas om design managern har kunskap om vad design innebär..
Prefabricerade Passivhus
European Union has made a new decision that all new built houses by 2020 shallbe near-zero energy houses. Boverket?s definition of near-zero energy housesintends buildings with good energy performance in which a proportion of theamount of energy that must be added to the building is made of renewable energy.Passive House is a set of requirements from FEBY designed to build energyefficient buildings. This is achieved by reducing loss of heat through the buildingenvelope and to take advantage of the passive heat from solar radiation,installation and heat sources like people living in the house.This project has been made with help of Anebyhus and one of their model houseshave been examined from the report?s issues, including Anebyhus?s energyperformance, requirements for the manufacturing and assembly, how theenvelope must be improved to fulfill the requirements for the Passive House andwhat energy calculation programs are available on the market.The report aims to provide solutions for energy efficient houses that are adaptedfor production of house building.Two visits to Anebyhus has been done to study their manufacture and assemblyof building elements.
Effektivisering och produktivitetsökning i produktionsflödet av Hammarhäftare på Isaberg Rapid AB
AbstractThe market?s demand to purchase more cost effective products is continuously increasing. The producers are forced to become more efficient and flexible with resources to produce high quality products at a low cost in order to maintain or increase market shares. With this in mind Isaberg Rapid AB is requesting a project to increase efficiency in the assembly cell of hammertackers. The company has found in Kaizen-events that there is a potential of efficiency improvements in the assembly group that has not been achieved.The objective with this paper is to identify the major factors that influence the efficiency in the assembly cell for hammertackers.
Designprincipers applicerbarhet på domänen streamad-TV
In our study, we investigated how the streamed TV domain relates to existing design principles for web design. Further, we have investigated whether there are specific characteristics of the domain that the design principles do not cover. In the survey we have studied two sites which are representative of the streamed TV domain. Finally, we discuss how applicable the design principles are for the domain and the specific characteristics that would require new or further developed design principles..