Vridspjäll
Our education at Halmstad University was completed with a degree project. Our task was to improve an already existing pneumatic damper to Nederman in Helsingborg.
Overall we have made necessary calculations to make the design of the existing damper smaller. When these calculations were done, we moved on with an analysis of the existing damper in order to figure out what improvements could be made on each part of the damper.
The result of this project is a smaller and a more supple design of a pneumatic damper. To this we have also created complete drawings, calculated material expenses; we have also created an assembly of a pneumatic damper in Catia v5..
Utveckling och utförande av frekvensstudie vid Rapid Granulator AB
The object of this examination project is to produce a method of work sampling at Rapid Granulator AB. The aim is to perform the method at the company and evaluate if it is executable. The study is delimited to the basic construction of the 45-series in the assembly hall.Preparations to produce the method of the work sampling resulted in definitions of activities, a form and a product tree. Several days were spent studying the assembling to learn and understand the entirety.The work sampling result showed a large amount of no value adding time that was used in the assembling. Some of the activities could be reduced and we observed some problems during the assembly process.
Analys och produktionsförbättring på monteringslinan Vensafe
This study is preformed at Westbaltic Components placed in Töcksfors Sweden. Themain target in this study is to make one of the company?s assembly lines better andmore effective. The assembly line constructs vending machines for different stores allover Europe.It will contain tobacco, snuff, cigarettes and shaving blades and many more similarproducts.The first step in our study is to locate the daily problems and find out a good way toreduce them and make them disappear. A good way to do this job easier was toconstruct a visualizing board.
Sammanställning och produktion av ritningsunderlag till båt
Hanterbara båtar is a new company who builds alumina boats customized for people in wheelchairs. Due to the fact that the company only built two boats yet, the production documentation is not complete. The drawing that does exist is not in an exact standard which makes production planning harder.The purpose of this work has been to make the production of the boat easier and simplify further development and modification. Product development in the form of optimizing details is also one of the main purpose of this work.This is all done by making a 3D-assembly of all the existing drawings. After this is done new drawings will be made and added to the main assembly.
Design av flödesorienterad montagecell : Utvärdering av layout och materialförsörjning vid Emhart Glass AB
Emhart Glass is the world?s leading manufacturer of equipment, controls and components to the glass container industry. The goal of this project has been to identify improvements and propose cost saving solutions when moving one of Emhart Glass work cells in Sundsvall. The changes shall result in improved work environment and increased product quality. The method contains value stream mapping, concept selection and P-FMEA and complies with Emhart Glass goal to become a more Lean focused business.
Byte av kontaktdonsgränssnitt för Scania bromssystem
This master thesis was carried out at Scania in Södertälje, Sweden. It investigates the possibility of changing a connector interface that is used when there is a need for splicing the wheel speed sensor and thereby determine the consequences.The problems that exist with the current connector interface occur during assembly, as more time is required to complete a connection in a reliable manner. A complete connection requires joining the male and female connector, insert the connection into a protective retainer and then strap a cable tie on each end of the retainer. This process makes it more time consuming and it requires 20-30 seconds to complete the connection. Solving this problem would save time and enable easier assembly, therefore resulting in economical benefits.This thesis was accomplished through discussions with different sections at Scania, studying available documentations, observations during assembly, writing a requirement specification and contacting suppliers.The aforementioned methods resulted in four connector suggestions, the DT and DTMH connector from Deutsch, MCON connector from TE connectivity and MLK connector from Kostal, each of them compliant with the set demands of the surrounding environment.
FEM?modeller för expansionsanalys av piplines
REINERTSEN AS performs expansion and buckling analyses of pipelines using ANSYS, afinite element modelling and analysis tool. In an expansion analysis the pipeline is modelledwith thin?walled pipe elements called PIPE20 which allows plastic deformation. However, ina recent analysis the results retrieved from the PIPE20 element were incorrect for strainsabout 1 percent. One main issue was that the PIPE20 element overestimated the strains.The purpose with this Master Thesis was to become familiar with the theories and analysismethods used in pipeline design.
Ergonomisk utvärdering och förbättring av monteringsstation
The purpose of this study was to examine and evaluate an assembly station at Kalmar Industries in respect to ergonomics. The study was to result in an improved assembly station with lower risk of work- related injuries. It was the study group?s expectation that the measures taken at the assembly station can function as guidance and an inspiration for other ergonomic improvements at the company. Several goals related to the purpose were established as guidance for the study.The mechanic?s work situation was mapped through a series of methods.
Modellering och design av elmotor för mutterdragare
This thesis was carried out at Atlas Copco Tools and Assembly Systems. The purpose hasbeen to develop a design tool to be used for development of new electric motors for AtlasCopcos electric nutrunners. The focus of the thesis has been to increase productivity bydecreasing the power losses in an electric tool. The productivity is defined as themaximum number of tightenings a nutrunner can perform without becoming too hot.Before starting the development of this design tool an existing Matlab script, whichcalculates the losses in a slotless electric motor, has been studied and modified torepresent the real losses in a better way. The modification has been made by performingpractical studies of different losses and then adjusting existing parameters in the Matlabscript.Because design changes in one part of a mechatronic system can lead to a decrease inperformance of another part the choice of parameters that can be changed has been madeso that other parts of the system is affected as little as possible.A study of the existing tools efficiency during an entire tightening has been made toincrease the understanding of when and where the different losses appear and to comparethe modified Matlab script with the measured values.The design tool was formed so that it executes the Matlab script, that calculates thelosses, for a number of different design options and stores the alternative which producesthe least losses.
Ställtidsreduktion i montering av kopplingar
VBG Produkter AB is a process-orientated company that develops, manufactures and markets trailer couplings with belonging coupling equipment, protection equipment against skidding and stands for wagon-bridge for heavy vehicles. The company feels that their set-up time in production for couplings is not at an acceptable level. Due to high demands of customer oriented production the intermediate stock level of included products within the assembly of couplings has gradually increased which has resulted in high inventory holding costs. VBG Produkter applies Kanban in their production, therefore it is important to produce exactly the necessary amount and avoid overproduction. The objective of this project is to suggest appropriate solutions so that VBG Produkter is able to reduce their set-up time in assembly of couplings, by identifying internal and external set-up time for the chosen process bushing cell.
Utrustning för automatmontering av ackumulator
This report deals with an exam report written by Olle Hjalmarsson and Thomas Likar, students at Högskolan i Halmstad. The project was carried out for Haldex Traction AB in Landskrona whose business consist of manufacturing automatic all wheel drive systems (AWD-system). These systems consist of a plate clutch which activates all four wheels of a 4-wheel driven vehicle. An important component in these clutches is the accumulator which basically consists of a piston under the load of a spring which creates an oil pressure with the help of an electric motor used for actuating the clutch.At Haldex difficulties has been experienced regarding the assembly of the accumulator parts due to the small tolerances between the piston and the hole of the accumulator in the cast aluminium housing. Attempts have been made to assemble the parts in existing robot cells.
INFÄSTNING AV LED-ARMATUR
The thesis was performed at the lighting company Zpecta AB. Zpecta needed to develop alternative attachment of their LED-luminaire Capella. Today Capella attaches in metal ceilings with four magnets. Zpecta got indications from their customers that there was a need for other attachments. The purpose is to determine the customer?s requirements and the interfaces that are considered for Capella.During the thesis, Capella was only on the market for testing and evaluation.The thesis was initiated to create a specification.
Konceptframtagning av inspektionspluggar till flygmotorer
This report describes the results of the project "Concept development of jet engine inspection plugs" carried out in the spring of 2008. The work was done at the department of product definition at the company Volvo Aero in Trollhättan. The objective of the work was to develop concepts for a "Volvo-unique" inspection plug. The work is part of Volvo Aero's focus on proprietary (self-developed) technologies. Inspection plugs can be found on virtually all aircraft engines and gas turbines.
Utveckling av personlyft till badkar
This thesis is performed as a summarizing project for the mechanical engineering education at School of Engineering in Jönköping. All knowledge necessary to complete this thesis was gathered from previous courses and education.This project was to develop a new product for the company TR Equipment AB in Tranås. The new product is going to be based on an already existing product, TR 1700. TR 1700 is a bathtub equipped with a height adjustable function. This product is used in retirement homes and in the care of disabled people.
?Kommer man upp på kullen och ser berget så?? : En studie om pedagogers förhållningssätt gällande flerspråkiga barn i samlingssituationer på förskolan.
This study examines working teachers? thoughts and views regarding multilingual children in assembly situations. The purpose of the study was to increase my knowledge and understanding surrounding the educators? approach when it comes to integrating multilingual children in common activities. By using semi-structured, qualitative interviews with six working educators in three different pre-schools, I examined their thoughts and approaches to working with multilingual children in assembly situations.