Sök:

Sökresultat:

2241 Uppsatser om Construction waste - Sida 5 av 150

Erfarenheter av några utfodringssystem till får :

The evaluation of the function of the feeding of sheep herds is suggested to involve the work effort, the fulfilment of the nutrient needs of the sheep and the feed waste. Mechanisation of the feeding can be very simple or include high degrees of mechanisation. Three different farms, representing different levels of mechanisation are presented. Descriptions and analysis of the feeding systems including mechanisation, work effort and estimations of the feed waste are made on each farm. The herd with the most advanced feed mechanisation included a rolling feed band and mix wagon. The other farms were partly or little mechanised including ad lib feeding from big bales and manual distribution of hay and concentrates. The most mechanised farm was able to feed a large herd of sheep at a low work effort and little feed waste. However, the investment in machinery has to be weighed against the improved efficiency.

Materiallogistik vid innerstadsprojekt : En fallstudie av ett innerstadsprojekt i förbättringssyfte av materialflödet

The construction industry is always looking for ways to make the work more efficient aswell as minimize the waste of money in general. At the same time the industry is showing alow awareness of logistics which has to increase in order to improve the industry in thesekind of questions. Projects located in the inner city have high demands on the logistic andthe handling of material due to the so often limited space for storages of the material. Dueto this the purpose of this report is true a case, study and analyze what kind of factors thereis to take into consideration during the materials way from the supplier to the workstationin a project located in the inner city. The data for the report was collected with the help of acase study, and in three different ways.

Trycksättning och dimensionering av brandhiss för berganläggning

This thesis deals with the design of a combinated rescue-, personal-, and firefighting elevator for a nuclear waste storage facility to be constructed by the client SKB, Svensk Kärnbränslehantering AB. SKB:s mission is to dispose of all nuclear waste from all swedish nuclear power plants. The storage facility will be built in the rock 450 m under the surface and will consist of several kilometers of tunnel where capsules containing the nuclear waste will be placed. It will also hold a central area which contains spaces necessary for the operation and construction of the facility, such as elevator hall, storage hall etc. The facility will have two ways of access: a vehicle ramp and an elevator shaft.

Finanskrisens inverkan på byggbranschen

Recently there have been a lot of talk a about the financial crisis and recession. This is understandable since the crisis, which initially was limited to the U.S. now has spread its concern globally in form of bankruptcies, less investment and lots of people have lost here jobs. The purpose of this thesis is to examine how the financial crisis have affected the construction industry relating to market and personnel, but also examine what measures the construction companies have taken. The examination was carried out by information received from the majority of construction-related websites which then was followed up with interviews in the various construction sectors.

Utveckling av substratmixen vid Mosseruds biogasanläggning : Substratkartläggning och rötningsförsök i laboratorieskala

The world?s growing need for energy together with a desire to ward off the worst consequences of global climate change has resulted in a never seen desire to invest resources in renewable energy sources. Biogas production through anaerobic digestion is one of those growing energy sources. In Sweden there are over two hundred plants that uses this biological process to break down organic substances while producing carbon dioxide and the energy-rich gas methane.This master?s thesis has focused on development of the mixture of different organic substances that is treated at a specific plant, namely Mosserud biogas plant.

Utvecklandet av en portabel solcellsmodul i miniformat lämpad för Nordiska klimatförhållanden : Teoretiska, praktiska och beräkningsmässiga analyser

The construction industry is always looking for ways to make the work more efficient aswell as minimize the waste of money in general. At the same time the industry is showing alow awareness of logistics which has to increase in order to improve the industry in thesekind of questions. Projects located in the inner city have high demands on the logistic andthe handling of material due to the so often limited space for storages of the material. Dueto this the purpose of this report is true a case, study and analyze what kind of factors thereis to take into consideration during the materials way from the supplier to the workstationin a project located in the inner city. The data for the report was collected with the help of acase study, and in three different ways.

Undersökning av avfallshanteringssystem : För ett nyexploaterat område i Ekhagen, Jönköping

Outside of many Swedish households today, you will find a typical green wastecontainer. This container has not changed since its introduction, despitecomplaints about foul-smelling and its impractical system. Even if the system usedtoday, still is the most optimal choice, there is a lot of newly developedalternatives out there.Its purpose is to get a broader perspective on how a waste management systemcan be developed into a working, land efficiently and aesthetically pleasing systemof humans and the environment in a small residential area.The authors treat the residential area of Jära, Ekhagen, in Jönköping, which ismanaged by JM AB as a problem area in regards to waste management.The issues raised by the authors are the different waste management systems usedin the corresponding areas of the world, how to apply technical andenvironmental as well as the waste management facilities from financial aspects.In the process, the methods used were literature reviews, case studies and aninterview. The case study was done through a modeling of waste managementsystems in the area Jära and an interview was conducted with the company Envacworking with vacuum systems. Studies have been made by different systems n theareas around the world.The results show that using directives and guidance will reduce the environmentalimpact done without replacing the traditional system.

Samarbete i byggprocessen : entreprenörens förväntningar på byggherren

Everywhere you look in today?s society many kinds of people are constantly interacting with each other. Especially in large groups of people working together, the phenomenon is even greater. In the construction industry there are many kinds of parts that need to come together in order to get sustainable and successful results. Therefore the relationship between the contractor and the construction client must be at its best.

Miljö- och samhällsekonomisk analys av behandling av biologiskt avfall

Biogas is a renewable fuel that can be extracted from anaerobic digestion of many differentsubstrates, for example biological household waste. An alternative handling of the waste is tomix it with other wastes and incinerate it in a combined heat and power (CHP) plant. Thisstudy uses life cycle assessment to investigate which type of waste handling that is betterfrom an environmental point of view, anaerobic digestion with biogas production orincineration. The results are based on a case study of a biogas production plant owned by thecompany Ragn-Sells in Vänersborg. The alternative is incineration at a CHP plant inGothenburg.

Skillnader i vatten- och avloppshantering inom EU : En jämförelse mellan Slovakien och Sverige

The management of water resources and waste water varies between the countries of the EU. For many years, a large part of the water in Europe has been contaminated by, among other things, insufficiently treated waste water and emissions from agriculture. The EU Water Framework Directive 2000/60/EC and the Urban Waste Water Directive 91/271/EEC are intended to harmonize fresh-water management and waste water management within the whole EU, aiming at safeguarding drinking water of good quality and a high quality of all water within the EU today and in the future. There are however some problems concerning the waste-water directive. One problem is the huge investment needed in Slovakia to fulfil the demands of the waste-water directive for waste-water management in larger communities (with more than 2000 inhabitants).

Kravspecificering av avgaspannor

This report describes the work of developing a specification of requirements for Waste Heat Recovery Units. The main part of the paper describes how the work with the specification of requirements has been performed. One specific question to be answered is:What are the customer?s demands in case of properties for the Waste Heat Recovery Units and how is that information collected as an order documentation to suit the business area Oil & Gas?The report begins with a description of the assignment and continues with the aim and background. A theoretical part describes the different areas and methods that have been important during the process.

Kloridutlakning från flygaska : möjligheten till en lokal hantering

In Sweden, there are limits to how much leachable substances waste must contain in order to be deposited as hazardous waste. Fly ash from waste incineration often end up over the limit, mainly due to the chloride content. Fly ash is therefore often deposited abroad. The purpose of this study was to investigate the possibility to handle fly ash locally. To clarify how the law is applied, environmental reports and permit documents from ten waste sites with permission to deposit fly ash were studied.

Kompostering av köksavfall och användning av kompost i köksträdgård i Chazuta, Peru : jordförbättring och/eller lösning på ett avfallsproblem?

All over the world the waste from human society is causing problems. In developing countries, large cities are polluted through huge amounts of wastes and people are forced to live very close to open deposits. Lima, capital of Peru, is no exception. The countryside in Peru has also a great challenge to face concerning the waste issue. Children and adults suffer from infectious diseases and contamination of the nature occurs as well. One solution to handle organic waste is to compost, which means a controlled decomposition of organic waste under aerobic conditions at certain temperatures.

Byggdamm : Vad krävs för att minimera spridningen på ROT-projekt under produktionsskedet

Dust that arises during the construction process is called ?construction dust?.People who are exposed for construction dust for a long period of time are atrisk to develop several forms of lung problems, allergies and cancer. Todayconstruction dust is a huge problem during the production in Skanska´srenovation projects. Every day workers are exposed of the unhealthyconstruction dust and it can cause lung problems and diseases after 10-30years. This is a problem that must be taken into account to obtain a betterworking environment on Skanska´s building sites.Skanska Sweden AB has given two students the task to investigate possibleproblems about the spreading of construction dust.

Reducering av kassationer på Cloetta Fazer AB

This master?s thesis was performed during the fall of 2006 at Cloetta Fazer AB in Ljungsbro. Cloetta Fazer is the market leader in Scandinavia of manufacturing confectionary and chocolates. The purpose of the project has been to identify causes that impact the quantity of waste in production as well as a cost/benefit analysis of the solutions that can reduce the problem of production waste.The work includes four production lines that are individually designed depending on what kind of product that are produced on the line. By using qualitative and quantitative methods such as focus groups, interviews and observations data has been collected.

<- Föregående sida 5 Nästa sida ->