Uppkomst av materialspill vid nyproduktion av flerbostadshus

Construction waste from the housing industry includes all unnecessary consumption of building materials. The definition of construction waste is construction materials that has not been built in and becomes waste. Constructions waste can be divided into two types of contributions: operational and work site contribution. Some of the common construction materials in housing industry have such low usage level as 75 % and the rest becomes construction waste. Low usage of construction materials creates unnecessary costs and has a major environmental impact.

Informationsutbyte från BIM-modeller : Från BIM-modell till format hanterbara av förvaltning- och GIS-system

BIM has been a trend in recent years when it comes to design and construction ofnew buildings. However, there has been less talk about what happens to BIM modelsafter the construction phase.This issue has been raised at the Forsmark construction documentation department.This thesis aims to look at how the information in a BIM model can be transferred tofacility management and GIS systems and thus add value, even after the constructionphase.Questions raises how such an exchange might look like and whether it is reliable.How should a claim be brought to planners for such an exchange to work.This thesis tested some of the most common methods for this kind of exchange ofinformation from BIM models to facility management and GIS. It was formats like IFC,Fi2xml and a database connectivity that was analyzed by a computer simulation of amodel provided by Forsmark. The model consisted of an existing office building atForsmark, modeled in Autodesk Revit.The results indicate that the formats tested require a precise plotting of the models.The loss of information that came to light in the simulation could be attributed tofailure modeling in Revit. Even such things as naming of areas must be consistent.

?Bollen susade in i bortre gaveln? - En studie i rörelsekonstruktioner och produktivitet

This paper investigates the grammatical construction intransitive motionconstruction with GOAL as it is used in Swedish (Swe. intransitivrörelsekonstruktion med MÅL).I examine in which ways the construction is productive, i.e. thepossibility to use the construction with new verbs as well as withordinary motion verbs with new functions. The notion of productivity isbased on the construction?s type frequency and semantic openness(Goldberg 1995, 2006; Barðdal 2008; Bybee 2010).

Ta bort tidstjuvarna! : Om tidsbesparande effektiviseringsåtgärder inom det kommunala bostadsföretaget Gavlegårdarnas byggprojekt

AbstractThe development of the construction industry is slower compared to other industries. This implies that there must be improvements in this field. One step to increased effectiveness in construction projects is making the construction process more efficient, therefore resulting in a positive result for both the actual construction project and for the overall branch. The purpose of this study is to identify areas for improvement within the municipal housing company Gavlegårdarna completed construction project, who will then contribute to increased efficiency in their upcoming projects. The work has been performed with the help of two case studies examine construction projects "Fullriggaren" and "The three nursing homes." Opinions about what could have improved the efficiency of these construction projects further have been collected with the help of an interview study among some of the project participants involved in both projects.There have been many studies addressing the topic of how the construction process can be streamlined and similar studies that have been previously conducted.

Riskbedömning och riskhantering i samband med vägbyggen

The aim with this thesis is to investigate the risk management at the department Road construction, The National Road Administration Region Mälardalen. The aim is also to study how the risk management could be improved to better support the project leaders. Included in theses aims is to examine potential problems with the current risk management and to suggest changes. It is of utter importance to define the concept of risk, to study how risk can be measured and in which ways risk can be analyzed. In doing so, a literary study has be done and fourteen respondents has been interviewed.Risk is to be seen more as a concept than a quantity.

Felaktig Ritningshantering : Kartla?ggning av dolda kostnader kopplade till ineffektiv ritningshantering inom byggindustrin

This report, written by Ma?ns Ridze?n and Jonas Stenberg, presents the thesis carried out the spring of 2012. The authors met the first time in 2008, when they started their studies at Uppsala University. Since then they have completed various projects, both within and without the university. This study is based on a theory that was first conceived when Jonas Stenberg did his internship in the summer of 2010.

?Varför är jag här? Varför sitter jag med de här gubbarna?? : En kvalitativ studie om att vara kvinna i den mansdominerade byggbranschen

This study aims to look at female executives? view of their leadership in the male-dominated construction industry. The study is  qualitative and focuses on the respondents' subjective perceptions. We have conducted six interviews with women in different companies whose positions within each company varied. Using theories of subjectivity, emotions, impression management and organizational structures, to support the analysis conducted, this study shows that there are obstacles for women in the industry, but it also shows that it  seems to be facing a brighter future.

Effekter av nya PBL : En studie av processen från handläggning av bygglovsansökan till slutbesked

It has now passed two years since the new site- and construction law, PBL, went into force. It replaced the previous PBL applicable since 1987, and it involves relatively large changes in many different areas of the construction sector. The ambitions of the new law are for instance to simplify and clarify the legal text, increase efficiency in the permitting processes and improve the quality of construction. To achieve this, a variety of changes was made. Some of the most important are: inserted deadline in the processing of building applications, extended assessment of building applications, revised rules about controlplan and quality manager, a certificate is required to start and end the project, an additional meeting is inserted and the Construction management of the municipalities will have to do a mandatory visit at the work scene.

Produktivitetsstudie Brobyggnad

The development of productivity in the construction industry has long been at a steady state compared to the manufacturing industry. Studies have shown that, amongst other things, waste on construction sites can reach up to one third of the total production cost. This has been observed from different aspects, and change is forthcoming.This thesis aims to provide a foundation for an increased productivity at production sites of building bridges. It is primarily based on a field study at Skanska, at a bridge construction site near Grängesberg. Via continuous interviews with the whole production crew, construction workers and management, information on interference and possibilities of improvement at the work site has been documented.

Effektivisering av logistiklösningar : En jämförelse av nya och gamla logistiksystem vid ROT-projekt

A persistent problem in the construction industry is its low margins of profit. It is often difficult to earn money due to low efficiency and high costs. Logistics on the construction site answers for a large amount of these costs and it is therefore of interest to find new, more efficient logistic solutions. The purpose of this thesis is to compare two different logistic systems and further to evaluate which one that is the most efficient and profitable. A comparison is made between the traditional logistic systems used for years and a new logistic system developed by an industry association called BEAst.

Finanskrisens inverkan på byggbranschen

Recently there have been a lot of talk a about the financial crisis and recession. This is understandable since the crisis, which initially was limited to the U.S. now has spread its concern globally in form of bankruptcies, less investment and lots of people have lost here jobs. The purpose of this thesis is to examine how the financial crisis have affected the construction industry relating to market and personnel, but also examine what measures the construction companies have taken. The examination was carried out by information received from the majority of construction-related websites which then was followed up with interviews in the various construction sectors.

Samarbete i byggprocessen : entreprenörens förväntningar på byggherren

Everywhere you look in today?s society many kinds of people are constantly interacting with each other. Especially in large groups of people working together, the phenomenon is even greater. In the construction industry there are many kinds of parts that need to come together in order to get sustainable and successful results. Therefore the relationship between the contractor and the construction client must be at its best.

Kvalitetssäkring:En analys av egenkontroll

A degree thesis about quality control and assurance in construction. Made in cooperation with Wästbygg. An analysis was made of the self-monitoring control that is conducted during the construction. The data was collected from interviews from personnel employed by Wäsbygg as either work-leader, project-manager or quality- and environmental-coordinator. During the study there was also a review of the literature in the subject.

High Orbit Ion Cannon : Går det att skydda sig?

The development of productivity in the construction industry has long been at a steady state compared to the manufacturing industry. Studies have shown that, amongst other things, waste on construction sites can reach up to one third of the total production cost. This has been observed from different aspects, and change is forthcoming.This thesis aims to provide a foundation for an increased productivity at production sites of building bridges. It is primarily based on a field study at Skanska, at a bridge construction site near Grängesberg. Via continuous interviews with the whole production crew, construction workers and management, information on interference and possibilities of improvement at the work site has been documented.

Bygg- och rivningsavfall utifrån ett miljöperspektiv : Med fokus på EU:s avfallsmål och en hållbar avfallshantering

The purpose of this report was to identify the current waste management of non-hazardous construction and demolition waste in a few Swedish construction companies, based on the different steps in the waste hierarchy with a focus on waste prevention, reuse and recycle. Additionally, the purpose was to attempt identifying opportunities, obstacles and as well as to propose possible solutions from an environmental perspective. The method used was a qualitative study using interviews conducted through emails and phone with employees occupying positions that could answer this reports questions. The results of this report indicates that waste management of construction and demolition waste has improved, and less waste goes into landfills. The concern is that the overall amount of waste being produced is not decreasing, thus calling for actions preventing the production of waste.