Sök:

Sökresultat:

1973 Uppsatser om Building simulation - Sida 4 av 132

Renovering av flerbostadshus - en studie om energieffektivisering och lönsamhet

In today?s society a large focus is put on energy systems and how our energy systems are built up. In order to make sure that we in the future still can enjoy the living standards that we are used to today, Sweden and EU have made a number of decisions on making our energy system more energy efficient and consequently reduce the usage of energy resources. By 2020 the European Union should have reduced its energy consumption by 20 % compared to 1990?s level, and by 2050, 50%.


Green Building : Ett företags energieffektiviseringsarbete i ett byggprojekt samt de krav som ställs för att få byggnaden Green Building klassad.

The examination has been performed at Bjerking AB, which is an architectural and engineering company. Bjerking AB has the ambition to be a member of Green Building.The Green Building program developed in year 2005 by The European Commission, the program is an environmental system with the aim to improving energy efficiency within the sectors of non-residential buildings. The minimum requirements to participate the program are following: in new-built buildings the calculated energy consumption must be 25 % lower than the requirements in the BBR (Building regulations) and in refurbishment the reduction must be 25 % lower than before the optimization.The aim of this study has been to examine and review the company Bjerking AB's energy efficiency work in the project of building the school/kindergarten S:ta Maria Alsike, where the goal is to get this building Green Building classed. A description of requirements to become a member of the Green Building has also accomplished in the thesis.The methods performed in this study are literature review, searches on the Internet, studies on the project database for facts/values, calculation of energy consumption and interviews of members of the Green Building. The following issues have been dealt with in the report;-          Did the building in the project manage the requirement to achieve an   energy consumption that is 25% lower than the requirements in BBR?-          What technical measures/system was selected in the building?-          What kind of cooperation was the project based on?-          What is required for consultancy companies and real estate owners to become members of the Green Building?The study of the project and calculation of estimated energy consumption in the building, give the result 47 kWh/m2, year.

Planering och val av metod i byggprojekt

This report describes the construction process and the aspects that should be taken into consideration. It includes models of decision and how these can be used in practice. Planning of a building project is very important for a successful execution. This will be the foundation of problems that will occur during the production. In the planning process people with different positions, search for the best suitable building methods.

En fordonsförares upplevelse av accelerationer som grund för en effektiv simuleringsmodell

Saab Aerosystems has a long tradition and a lot of competence in the field of flight simulation. Their ambition to broaden the market horizon has led to a discussion about also selling vehicle simulation solutions, both for military and civilian use.The aim of this thesis is to investigate the driver?s experiences of the accelerations he or she is exposed to whilst driving in rough terrain. The results may be used as a basis for future decisions and can act as a platform for the construction of an effective simulation model.To investigate the driver?s exposure of acceleration, some kind of dynamic simulation is needed.

Simulation driven design : An iterative approach for mechanical engineerswith focus on modal analysis

This thesis of 15 hp has been implemented at Halmstad University, incollaboration with Saab Dynamics in Linköping. Saab Dynamics is a companyoperating in the defence industry where competition is tough. This necessitatesnew ways to increase efficiency in the company, which is the basis for this thesis.Saab Dynamics wants to introduce simulation driven design. Since SaabDynamics engineers have little experience of simulation, required a usermethodology with clear guidelines. Due to lack of time, they chose to assign thetask to students, which resulted in this thesis.The aim of the thesis is to develop a methodology in mechanical design, wherethe designer uses the FE analysis early in the design process to develop thestructures' mechanical properties.

Informationsstyrning av en försörjningskedja i ett icke tillverkande företag.

In this report listed buildings, according to the Swedish Heritage Conservation Act, have been studied with a focus on cases where economical compensation has been given to the owner of the building and cases where the listing of the building has been appealed by the owner. In order for a building to become listed it needs to be particularly valuable from a cultural and historical standpoint. The listed buildings are protected through a list of regulations that determines which parts of the building can or cannot be changed, what methods and materials should be used for changes and repairs, and how the building should be maintained. These regulations should as far as possible be formulated in agreement with the owner, but a building can become listed against the owners will. To decrease the damage this causes the owner he can in some cases have the right to economical compensation. There is also a possibility for the owner to appeal the listing of the building.

Underlag för en kommande rivning av J-huset på Akademiska sjukhuset i Uppsala : Generell planeringshjälp vid utförande av rivning

This report is about planning a demolition. The purpose of this report is that it should become a base for a demolition of house J at the Academic hospital in Uppsala, and also to make general help for planning a demolition. This report also contains a part about how a change in the work environment affects general people. The work started with studies of literature and design of the general part of the report and then continued with a practical study of house J. From the experience of the first two parts of the report a general help for planning a demolition was shaped.

Beräkningar av marknadsrisker: teori samt metoder i utvalda
program

Det här examensarbetet förklarar i olika stor utsträckning några av de vanligaste riskmåtten för marknadsrisker. Störst fokus får Value at Risk och de tre vanligaste metoderna att beräkna detta: Historisk simulation, Varians-Kovariansmetoden och Monte Carlo-simulation. Utvalda riskmått och funktioner har dessutom undersökts och förklarats för tre olika mjukvarupaket designade för att beräkna risk. Skillnader i programmen har lyfts fram, dissikerats och diskuterats..

Valet påverkar utseendet : Värdering av förvaltningsfastigheter till anskaffningsvärde eller verkligt värde?

AbstractMaster thesis of one year in Business Administration, Swedish Business School at Örebro university,Marketing, HT 2011.Authors: Grunér, Linus and Malm, Ludwig Tutor:Pia Lindell Title:Brand building and creating relationships ? A study of a small business in the B2B market Keywords:Brand building, business relationships, SME, B2B. Problem:How does a small business in the B2B market work with brand building and creating relationships? What critical factors can be identified regarding the process of relationship-building and brand building within the context of a small business in the B2B market? Research objective:The purpose of this study is to use existing research to create understanding for how a company in the B2B market is working with relationship-building and brand building. The study also aims to identify any critical factors concerning the process of relationship-building and brand building.

Hur enkel- & dubbelportsturbin i kombination med två olika avgassamlare påverkar gasväxlingsprestanda på en Scania V8

The exhaust arrangement on a Scania V8 consists of one manifold at each bank connected to a twin entry turbine (8-2-2). A study in GT-Power has shown improved performance and reduced cylinder to cylinder variations using two manifolds at each bank in combination with a single entry turbine (8-4-1). This thesis work analyses the difference in performance shown in simulation and verify it by engine test.The initial work was focused on simulation in GT-Power. Investigating how exhaust manifold volume and pulses effects the turbine efficiency and the mean effective pressure during the gas exchange. To verify GT-Power simulations four engine tests with different exhaust arrangement have been made.The results from GT-Power simulation indicate that a larger exhaust volume improve the turbine efficiency.

Granskning av Solibri Model Checker - En Svenskanpassning : Ja?mfo?relse av tva? egenkontrollsystem

The building industry are currently going through a huge alteration. The introduction of BIM (Building Information Modeling). Which also implements a lot of new ways of solving problems that building modeling can cause. This report is written for Uppsala University in cooperation with Temagruppen in Uppsala. However, it contains a comparison between two different systems that checks building models.

Modellering av Panna 5 Mälarenergi AB : utveckling av en beräkningsmodell med simuleringsverktyget IPSEpro

Heat and power stations are often in need of optimizations. A simulation model is a tool for findingways to optimize the plant. The scope of this diploma work is to develop a simulation model ofBoiler 5 at Mälarenergi AB. Boiler 5 is a circulated fluidized bed boiler that was taken into service inyear 2001. Among the included parts in the boiler are cyclone, convection part andINTREX-chambers.

Byggnadsminnesförklaring - skyddsbestämmelser, ersättning och överklagande

In this report listed buildings, according to the Swedish Heritage Conservation Act, have been studied with a focus on cases where economical compensation has been given to the owner of the building and cases where the listing of the building has been appealed by the owner. In order for a building to become listed it needs to be particularly valuable from a cultural and historical standpoint. The listed buildings are protected through a list of regulations that determines which parts of the building can or cannot be changed, what methods and materials should be used for changes and repairs, and how the building should be maintained. These regulations should as far as possible be formulated in agreement with the owner, but a building can become listed against the owners will. To decrease the damage this causes the owner he can in some cases have the right to economical compensation. There is also a possibility for the owner to appeal the listing of the building.

Jämförelse av olika reglersystem för undervisningsändamål

Examensarbetet syftar till att jämföra nya alternativ till olika system för användning i laborationer i reglerteknikkurser för olika studentkategorier. Det skall utredas vilket av ett antal alternativ till mjukvaruplattformar som är bäst lämpat att användas vid reglerteknikundervisningen i ITN:s reglerlaboratorium vid Linköpings universitet. Tidigare laborationer i berörda kurser skall även modifieras så att dessa kan genomföras i de nya systemen.Examensarbetet resulterade i en rad modifierade laborationer och system att tillämpa i dessa. De nya systemen medför att all reglering sköts direkt från en dator istället för tidigare variant med externa apparater som programmeras. På så sätt kan större fokus läggas på regleringen i sig och inte de system som tillämpas för att utföra den..

<- Föregående sida 4 Nästa sida ->