Sökresultat:
1973 Uppsatser om Building simulation - Sida 10 av 132
Effektiv partiformning : analys och tillämpning på Uppåkra Mekaniska AB
This paper is the result of a case study conducted at Uppåkra Mekaniska AB during the spring of 2006. The task that was presented by Uppåkra was to develop a basis for a decision for the planning activities at the company, so that in the future they can create lot-sizes which are based upon a total cost perspective. Total cost in regards to lot-sizing is defined as the sum of the administrative reordering costs and warehousing cost per stock keeping unit.To collect data a series of interviews and observations were conducted. This data was then used during the lot-sizing simulation and analysis. The 15 units that the simulation was conducted on were grouped into three item classes depending how many different machine setups they required during the production process.
Arboga Mekaniska Verkstad : Förslag på saneringsåtgärder gällande gjuteriet och plåtverkstaden
The industrialization in Sweden has increased the large number of areas that have been contaminated with various types of pollution. One of those sites are the property Höjen 3:24 in Arboga where ?Arboga Mekaniska Verkstad? once been. The property wants to increase the use of the old former foundry building with the adjacent ?plate-workshop? and believe there are two options for the building: That the building either should be used as a warehouse/concert hall, or rebuilt into a cultural center. An environmental evaluation has shown that the levels of heavy metals are over the Swedish environmental protection agency guidelines of less sensitive land.
Bedömning av loggbok : Bedömning av loggbok med en uppgiftsspecifik matris
The purpose of my independent work was to develop and test a task-specific assessment matrix to the students writing logs that occurs in connection with their APL (workplace-based learning). The matrix is based on upper secondary school subject plan House building from The Swedish National Agency for Education and the four courses House building process, House building 1, House building 2 and House building 3 - conversion. Due to the matrix structure, I used the example matrix of Malmö University. The task-specific assessment must both serve as a guide for students in the implementation of the log writing, and in the evaluation of the assessment work. Both students and teachers then get a common assessment tool for evaluation.
Lönsam energieffektivisering : Ett samarbete mellan ÅF och kund
This thesis project has focused on studying ÅF?s business concept Energy Collaboration, which is their way of selling energy efficiency services. Thereforeongoing projects have been analyzed. The purpose was to determine achieved energy efficiency, costs and profitability for the studied projects. It was concluded that the Energy Collaboration is a good way of selling energy efficiency services, since the customer takes no risk and energy savings of about 15-25 % can be achieved with simple measures.
Metodval i projekteringsfasen : Bostadshus Ljusbojen 1
This major project in Building Engineering has its focus on inquiring into what methods has been used in the planning process of the residential buildingLjusbojen 1. This project has been conducted in cooperation with Kadesjös Ingenjörsbyrå AB, an engineering contractor firm which also acts as the property developer. Initially several different general methods for planning residential buildings have been presented. After the methods from the process of building Ljusbojen 1 has been analyzed compared to the general methods presented in part 1. This shows what the determining factors are during the planning process; factors such as cost, quality, time management, know-how and environmental issues.
Bakom fasaden: Haninge kulturhus - en organisationsteoretisk studie med fokus på den fysiska strukturen
This master thesis aims to describe and examine Haninge cultural centre, inaugurated in 2002. We study the centre from an organization theory point of view, with focus on the buildings physical appearance. The question we want to answer is to what extent, and if, Haninge cultural centre fulfills the underlying vision, formulated by the municipality of Haninge. Is the centre the symbol of a new era of Haninge and a vivid democracy as it was meant to be? Is there a congruency between the image the building creates and the vision that was formulated by the municipality? We also seek out to see how the cultural centre relates to an older tradition of cultural centres.
Energihushållning och varsamhet för äldre byggnader : Chefsbostaden i Strömsholm, ett timmerhus från 1900-talets början
This report is the result of a degree project in building engineering, at an advanced level. The project evaluated a building from a technical and historical point of view, and focused on its energy consumption, particularly the energy used for heating. The building in question was a small apartment building in Strömsholm, Sweden. It was made in 1902, from vertical logs, a not so common form of the traditional log house. The goal of the project was to evaluate if the energy consumption could be reduced in accordance with building preservation regulations, that is without damaging any of the building?s cultural or historical values.The building was surveyed with the help of archive and literature studies, interviews and inspections.
Utredning av fastighetsel i ett äldre och ett ombyggt flerbostadshus i Gävle
The residential and service sector in Sweden accounts for approximately 38% of the total energy usage and Sweden has an aim to reduce the total energy use by 20% by 2020 compared to 2008, which means residential sector will have to improve energy efficiency. As part of that a law was instituted by the Swedish parliament that all properties must have an Energy Performance Certificate (EPC) to thereby give the property owners a greater insight into energy use in their buildings and propose recommendations for energy-efficiency measures. On the EPC, a value on the building's energy performance in terms of energy use in kWh / m2 per year is declared, of which electricity is a share of it. Instructions on what to include in the amount facility electricity for running the facilities is regulated by the authority for building, Boverket while SVEBY has made an interpretation of the regulations in their report "Brukarindata bostäder" where they have a table on what should be included in the amount and what not to include.This report is a study of two similar apartment buildings, where one of the buildings recently underwent renovation, to see if the declared amount of energy for electricity, in the EPC, is consistent with the measured value, and whether there has been any reduction in facility electricity in the renovated building after the renovation.The result shows that the measured value of the building electricity was 2.6 kWh / m2 per year, 28,8 %, lower than the declared value in the building that have not undergone a renovation. Calculation of values from previous years (2011) by the same percentage of facility electricity as in the results of the measurements, 56.7%, it becomes clear that the declared value for facility electricity in the EPC of the renovated building do not correspond with reality and that there has been an increase in use of facility electricity after the renovation..
Cykelgatan
Mitt arbete innefattar en "Urban building" med bostadsrätter och kontor där utgångspunkten har varit cykeln då jag ansett den vara det mest stadsmässiga elementet. Placeringen för byggnaden är Hornsbruksgatan på Södermalm där det med projektet blir till 130 nya bostäder och 1200 kvm kontor som är väl anpassade för cykling såväl som cyklister..
Byggnationsskillnader i Sverige, Finland och Tyskland
This paper is written as an examination paper at the University of Jönköping. The subject is chosen by Peab Sweden in Jönköping with whom further cooperation has been hold. The aim is to compare building methods and building materials in Sweden, Finland and Germany for further inspiration for Peab?s own market.BackgroundThe development of the construction industry develops new materials and methods to the market which has been forced by shorter construction times and the environment aspect. To pursue the development, further knowledge exchange should exist between the countries.
Solel till Akademiska sjukhuset : möjlig genererad effekt och solcellers estetiska konsekvenser
Today many buildings and it´s nearby surroundings are designed to achieve some kind of environmental goal.The issue concerning energy consumption is currently at focus and it is relevant that we start increase the share of renewable energy. Solar energy is an infinite resource and should therefore be considered when selecting an energy supplier. Uppsala University hospital is facing major restructuring when parts of the existing buildings will be refurbished and a large new building will be constructed. White Architects have developed a study concerning the new building and for some of the existing buildings on the hospital campus. Uppsala County requires tough energy measures and wants the new building to be classified as an eco-building in Whites following work. The classifications will involve high energy source requirements. This work has been conducted to see if solar power can be envisaged as a supplementary energy source for the University hospital and also to investigate the aesthetic impact of solar cells on the new building.
Optimering av OTEC-system
Ocean Thermal Energy Conversion, OTEC, is a sustainable energy conversion technology that is not yet commercialized. OTEC is a technology that utilizes the temperature difference in oceans between the warm surface water and the cold water at 1 000 m depth to run a Rankine Cycle. This technology can produce electricity and provide synergies like fresh water, air conditioning and aquaculture. A simulation program for three alternative OTEC systems has been created in order to decide which OTEC system is most profitable; closed, open or hybrid system. In this simulation a production cost analysis is performed in order to investigate and decide which one of the three systems that has the lowest production cost. The production cost analysis also analyzes if the profitability is affected by the size of the facility. After these analyzes, the most profitable of the three different OTEC-systems is expanded by an installation of solar collectors in order to see if the thermal efficiency is improved. The result shows that the most profitable system varies with the size of the facility.
Konstruktion av kolfiberarmerad motorcykelram
The project description is to draw an extension or annex to the existing Nationalmuseum building from 1866.The annex is designed to complement Nationalmusems activities and contain internal and public functions. Artentering the building must not be crossed by public visitors. Art and staff must be able to seamlessly move betweenthe extension and the main building. The new building includes a public study room for scholars working withthe collection of art on paper, workshops, conservation studios, art spaces and warehouses. Additionally, theannex is designed to host a large number of office spaces.With the renovation of Nationalmuseum they intend to open up the today built in south atrium.
Hur arkiverar Sveriges byggföretag? : Ett försök att finna arkiveringspraxis i en för kulturarvet viktig företagsbransch
What traces of their actions are the Building Corporations in Sweden leaving in their archives and are they followingsome archival policies? This thesis is trying to answer that question. For that reason 25 archives fromSwedish Building Corporations have been investigated concerning their size, contents and age. Furthermore apoll performed by the Swedish National Archives in cooperation with the Swedish Employers? Confederationhas been analyzed.
SJ:s hantering av fordonsfel- analys ur ett helhetsperspektiv
The project description is to draw an extension or annex to the existing Nationalmuseum building from 1866.The annex is designed to complement Nationalmusems activities and contain internal and public functions. Artentering the building must not be crossed by public visitors. Art and staff must be able to seamlessly move betweenthe extension and the main building. The new building includes a public study room for scholars working withthe collection of art on paper, workshops, conservation studios, art spaces and warehouses. Additionally, theannex is designed to host a large number of office spaces.With the renovation of Nationalmuseum they intend to open up the today built in south atrium.