Sök:

Sökresultat:

1973 Uppsatser om Building simulation - Sida 11 av 132

????Att lösa reglertekniska problem med Modelica

Modelica is a multi-domain and equation-based modeling language. Modelica is based on object-oriented principles and non-causal modeling. The language is constructed to facilitate reuse and decompose models. The models and the modellibrary can modified to design a new nonlinear components.Object-oriented modeling is an excellent way to analyze and study large complex heterogeneous physical systems. The object-oriented modeling approach build on reusing and decomposition of models and non-causal modeling.Modeling physical systems often leads to a DAE system with index 2 or 3.

Studie av en medeltida husgrund : en analys av bronsfynd från husgrund 6, Västergarn, Gotland

This essay is an analysis of the objects made of bronze found in an excavation Västergarn parish, Gotland, in 2010, conducted by the University of Gotland. The studied material presented in this essay comes from contexts inside, as well as nearby the foundation of a medieval building which purpose is still not certain. The first purpose of this study is to present the bronze-objects found inside and nearby the foundation of house 6, and to see if there are any datable objects. There is also a discussion whether there has been any bronze-crafting in the area. The second purpose is to make a contextual analysis to see if there are any differences between the material found outside and inside of the building, and what conclusions can be made regarding the function and use of the building.

Tillgänglighet i femtiotalshus : En fallstudie i tillgänglighetsbrister med åtgärdsförslag

This is a report about accessibility. For this project the accessibility of a building in the city of Halmstad was evaluated. It´s a three storey building with five apartments on each floor divided by two stairwells. These five apartments have since been divided into three different types of apartments. Each type of apartment has been assessed separately.

Kvarteret Domherren: Urban Building : Bostad, kontor, butik & mötesplats

Projektet går ut på att radikalt öppna upp kvarteret. Öppna upp husets bottenplan till allmänheten, skapa en större offentlig plats, en mötesplats, samt tillföra butiker och studentbostäder. Dessutom skall husen kommunicera denna nya tillgänglighet..

Cykeltidsoptimering av sjuaxligt robotsystem

This master thesis studies how much the cycle time, i.e. the time it takes for an industrial robot to perform a given task, can be reduced if an extra degree of freedom (DOF) is added to the robot system. The extra DOF consists of a linear track, which is supposed to be used in an optimal way. The problem has been studied using simulations in the robot simulation tool RobotStudio. To be able to run an optimization in Matlab, with the RobotStudio simulation cycle time as the object function, communication between Matlab and RobotStudio has been set up with an interface written in Visual Basic.

Kartläggning av order- och leveransprocessen för höghastighetsseparatorer hos Alfa Laval Tumba AB

The project description is to draw an extension or annex to the existing Nationalmuseum building from 1866.The annex is designed to complement Nationalmusems activities and contain internal and public functions. Artentering the building must not be crossed by public visitors. Art and staff must be able to seamlessly move betweenthe extension and the main building. The new building includes a public study room for scholars working withthe collection of art on paper, workshops, conservation studios, art spaces and warehouses. Additionally, theannex is designed to host a large number of office spaces.With the renovation of Nationalmuseum they intend to open up the today built in south atrium.

BIM för Hållbart Byggande

The purpose of this study is to facilitate sustainable building by the use of BIM. The goal is to determine which aspects of sustainable building, which can be analyzed mainly with BIM tools, but also other aids.The study is based on literature studies and interviews. The literature review examines aspects important for sustainable building by studying environmental certification systems applicable in Sweden, as well as the BIM tools available on the market to analyze these aspects. The literature also includes the concepts of BIM and sustainability in order to provide a clearer view of its meaning. The interviews have brought the study's overall understanding of the industry and guidance on the subject.The results are presented in a table, where the aspects relevant to sustainable building are listed.

Påbyggnad av våningsplan medlättkonstruktion : En jämförelse av stommaterialen trä ochtunnplåt

The purpose of this thesis is to examinethe possibilities for adding a floor to anexisting building using the two materialswood and sheet metal profiles as the loadbearing structure. An apartment buildingfrom the 60s has been used as referencehouse. Two different suggestions for thedesign are presented in the rapport. Oneof them has been analyzed with wood andsheet metal as the load bearing structure.Using the old constructional calculationsand blueprints of the existing buildings,the load bearing capacity has beencalculated. In the calculation programFEM-Design the building has been testedwith the loads that an extra floor wouldgive.

Grönområde kontra bebyggelse : grönområdenas förändring i Älta, Nacka kommun

This essay shows how natural areas in Älta, a part of Nacka municipality southeast from Stockholm, been changed quantitatively and qualitative as a result of the increased housing construction in the area. Three issues are discussed. Namely: how has Ältas green areas been changed in sizes and quality in line with the settlement's expansion, what is the reason or the reasons to building of different types of accommodations, what has been and is the operators in connection with building of the different types of accommodations?The essay shows that the green areas has been decreased with over 2 km from 1901 to 2000 and in addition to these areas of approximately 1,1km been converted to a planned green structure. Älta has during the years gone through four eras of building types an era of small family houses ? an era of building one million houses on a national scale ? an era of terrace houses ? an era of sporadic building of different housing types (one family houses, pair houses, terrace houses and small blocks of flats).

Att förebygga och undvika fuktskador i byggnader

Efforts to achieve a moisture proof construction process have proved to be considerably complicated, despite the knowledge and awareness that now exists within the moisture field. Materials, documents, templates and checklists are designed to be accessed but are not used anyway. This may be because such effort has not been prioritized and properly requirements have not existed from the commissioner of a building.This report illustrates how the commissioner of a building project can achieve a moisture proof building process by increasing knowledge, moisture proof planning, and implementation of security moisture routines. Proposals are given on how the commissioner of a building project can work to consistently bring a moisture proof building process in all stages. The difficulty with regular moisture proof efforts, the authors believe is mainly due to the following points:      Many different design solutions.      Lack of experience feedback.      Lack of communication.      Financial incentives.      Attitudes.The interviews in the report have conducted with the help of a qualitative analysis, while the survey has been done using a quantitative analytical method.

Robotiserad produktionsanpassad magnetmontering för vågkraftverk

This thesis work includes studies and simulation how magnetization of the translator in a linear generator for wave power can be automated. The translator is the moving component in the generator that is "dressed" with permanent magnets. The translator is magnetized with rectangle-shaped permanent magnets that are today's strongest permanent magnet type of neodymium-iron-boron (NdFeB).Eight equivalent metal sheets are mounted around the translator. The plates have milled tracks where 106 permanent magnets per sheet are mounted. Today the assembling of the magnets is done by hand, which is a very tedious and time-consuming work.  This project presents investigations about the automation of the translator magnetization theoretically and simulation results are preformed in ABB's robot simulation software RobotStudio. Even robot-held tool was designed that enables the robot to be able to magnetize the translator in a simple manner.  The investment cost is roughly 1.5 million SEK. With an economic life-time of five years, the investment costs are estimated to 24000 SEK / month.  According to the calculations, this project is very motivated to implement, as it provides savings up to 17 000 SEK per translator which is 10.2 million SEK assuming that the robot cell is operating at full speed the whole year.According to this thesis work the result is a 4x9 meter cell with two industrial robots of the type ABB IRB6650S.The cycle time to magnetize one translator was calculated to about 10 hours.This prototype of project can possibly be implemented in a full-scale production line and performed according to the calculations and simulations presented in the report. Further work is suggested to improve the tool.Lyssna .

Posthuset blir hotell En studie av Centralposthuset i Göteborg och dess omvandling

This essay in Art History treats the former Central Post Office in Gothenburg, Sweden, and its recent transformation into a luxury hotel. The magnificent original building in neo-classical style, inaugurated in 1925, has been supplemented by a twelve stories high tower in postmodern style containing hotel rooms and suites, creating a complex architecture. The approach of this essay is that of ?lived architecture?, that is, how people experience and act in relation to the building. It is argued that the history of the building is rewritten in the marketing of the hotel and the management?s concept of creating a comfortable ?mini-world?for its guests.

ADS och Matlab för optimering av pre-distortion av effektförstärkare

This master?s thesis deals with integrating simulations using Agilents Electronic Design Automation tool ADS with customized Matlab scripts, for solving complex analog and digital radio architectures. In particular, it addresses predistortion, realized in the digital domain, of power amplifiers, modeled in the analog domain. The former is implemented in Matlab while the latter is implemented in ADS. Two versions of integrating the two systems have been tested: 1) Iterative approach on sample basis and 2) Scheduled batch solution by matrix inversion.

Modell och analysverktyg för beräkningav frekvensförlopp

The power system modelled in this thesis work has been developed for simulationwhen e.g. the production in some part of the power system is changed. The powersystem has been modelled according to the swing mass of the system, the frequencydependency of the load and the turbine governor. The model determines the systemfrequency, the period of regulation and the power exchange between the differentsubsystems in the Nordic synchronized system.In this model the system frequency is assumed to be the same in all different parts ofthe power system and the voltage conditions in the power system are neglected. Forthat reason power swings does not occur between different subsystems in the powersystem, which usually occur as a result of the swinging connection between thetransmissions line.

Undersökning av förskolan Temmelburken certifierad enligt Miljöbyggnad : Termiskt klimat, energianvändning och höjning av certifieringsnivån

WSP building physics in Stockholm has certified the preschool Temmelburken in Bromma with the system of certification Miljöbyggnad. The rating of the building became BRONZE. In this thesis the preschool has been investigated with respect to the three areas: thermal climate, use of energy and improving of the level of certification. The thermal climate at the preschool has been investigated by a questionnaire survey and by measurements in order to do comparisons between the results from the two investigations as well as with the results of the simulations that WSP has done at the certification of the preschool. The differences between the results from the simulations and the questionnaire survey for winter as well as from the measurement performed with a comfort meter the 19th of March are concidered to be reasonably small since they give rise to the same rating according to Miljöbyggnad.   Operational data for the use of energy for the preschool have been obtained in order to do comparisons with simulations performed by WSP and Svenska Besiktningar AB. The comparison shows that the simulated values for the specific use of energy are lower than what the real specific use of energy would be for the preschool, since just the operational data for the heat energy is higher than the simulated values. At the investigation of the possibility of improving the level of certification it was found that the rating of the preschool can be raised from BRONZE to SILVER by improving the ratings of the ?thermal climate summer? and the ?daylight?.

<- Föregående sida 11 Nästa sida ->