Sökresultat:
4842 Uppsatser om Building project - Sida 1 av 323
Slusseneländet
Stockholm is constantly growing and changing. Despite this, for various reasons, it is difficult to execute large Building projects. With starting-point in decision making theories we have tried to investigate these difficulties. More specifically we have chosen to study why it has not been possible to rebuilt Slussen in Stockholm. To help us structure our study we have based our research on another large comparable Building project, the Globen City project.
Green Building : Ett företags energieffektiviseringsarbete i ett byggprojekt samt de krav som ställs för att få byggnaden Green Building klassad.
The examination has been performed at Bjerking AB, which is an architectural and engineering company. Bjerking AB has the ambition to be a member of Green Building.The Green Building program developed in year 2005 by The European Commission, the program is an environmental system with the aim to improving energy efficiency within the sectors of non-residential buildings. The minimum requirements to participate the program are following: in new-built buildings the calculated energy consumption must be 25 % lower than the requirements in the BBR (Building regulations) and in refurbishment the reduction must be 25 % lower than before the optimization.The aim of this study has been to examine and review the company Bjerking AB's energy efficiency work in the project of building the school/kindergarten S:ta Maria Alsike, where the goal is to get this building Green Building classed. A description of requirements to become a member of the Green Building has also accomplished in the thesis.The methods performed in this study are literature review, searches on the Internet, studies on the project database for facts/values, calculation of energy consumption and interviews of members of the Green Building. The following issues have been dealt with in the report;- Did the building in the project manage the requirement to achieve an energy consumption that is 25% lower than the requirements in BBR?- What technical measures/system was selected in the building?- What kind of cooperation was the project based on?- What is required for consultancy companies and real estate owners to become members of the Green Building?The study of the project and calculation of estimated energy consumption in the building, give the result 47 kWh/m2, year.
Viking Future Centre : Vision om en identitetsbyggnad i Göteborg
This thesis project is a vision of an identity building in Gothenburg, situated on the pier called Bananpiren. The purpose of the project is to create interest and stimulate discussions around the place and the building.In order to gain inspiration of what such a place can contain and express, a number of similar projects have been analysed, for example the Sydney Opera and the Yokohama International Port Terminal.A number of suggestions was then created and analysed, all of which are presented in chronological order in order to show the rejections and the developed designs that resulted in the final formation to proceed with.The result was finalised in a number of presentation images of the project that can be used by Cullbergs Arkitektkontor AB when presenting the project..
Högt hus i Chongqing/Kina - ett bostadsprojekt
This is a project showing a proposal on how a high-rise building gains qualities similar to middle rise houses of 7-9 stories. The closed, isolated and often anonymous life in the high building opens up through gardens. The resident meet the outdoor environment on the balcony, or has direct access to a garden.Instead of moving in a closed core, the resident will meet the climate and outdoor conditions as soon as he or she leaves the apartment.The project consists of two parts, where the first is presenting a building proposal, the second is expanding the knowledge through background research. The topics are history concerning the skyscraper and the skyscraper globally, closing up with the situation in China..
Metodval i projekteringsfasen : Bostadshus Ljusbojen 1
This major project in Building Engineering has its focus on inquiring into what methods has been used in the planning process of the residential buildingLjusbojen 1. This project has been conducted in cooperation with Kadesjös Ingenjörsbyrå AB, an engineering contractor firm which also acts as the property developer. Initially several different general methods for planning residential buildings have been presented. After the methods from the process of building Ljusbojen 1 has been analyzed compared to the general methods presented in part 1. This shows what the determining factors are during the planning process; factors such as cost, quality, time management, know-how and environmental issues.
Industriell produktion av loggia - en studie om loggiarum som alternativ till inglasad balkong
AbstractIntense competition in the building industry has forced building companies to develop highly efficient and optimised building solutions. This project, with a loggia that works both as an extended living room and a glazed balcony offers a highly economic viable alternative to standard balconies. This alternative is likely to attract build master since the area of the loggia will be part of the apartment area, i.e. included in the area for rent..
Planering och val av metod i byggprojekt
This report describes the construction process and the aspects that should be taken into consideration. It includes models of decision and how these can be used in practice. Planning of a Building project is very important for a successful execution. This will be the foundation of problems that will occur during the production. In the planning process people with different positions, search for the best suitable building methods.
Församlingshem, Bankeryd
This report presents a thesis project at the School of Engineering, Jo?nko?pingUniversity, where the task has been to develop a proposal for a parish communitycentre for the Swedish church?s parish community in Bankeryd.Background1 st of November in 2004 the parish in Bankeryd appointed a special commissionof inquiry called Framtidsgruppen (Future Group), to analyse the parishcommunity?s different activities during the past 5 years and analyse the futureactivities and needs for the upcoming 5-10 years. This analysis would underlie theneeds of building a new centre for the parish community.Implementation, results and conclusionThe main focal points which this report is concentrated on has been to develop abuilding that is well suited for the activities, well adjusted for disabled persons andthe building shall be appealing in an architectural point of view.Based on the information provided from the parish community, studies ofliterature, reference objects and discussions with the contact person at the parishcommunity and the instructor of this project, the programming has beendeveloped. The building?s programming has been the source for the continuedwork with floor plans and the building design..
Energihushållning och varsamhet för äldre byggnader : Chefsbostaden i Strömsholm, ett timmerhus från 1900-talets början
This report is the result of a degree project in building engineering, at an advanced level. The project evaluated a building from a technical and historical point of view, and focused on its energy consumption, particularly the energy used for heating. The building in question was a small apartment building in Strömsholm, Sweden. It was made in 1902, from vertical logs, a not so common form of the traditional log house. The goal of the project was to evaluate if the energy consumption could be reduced in accordance with building preservation regulations, that is without damaging any of the building?s cultural or historical values.The building was surveyed with the help of archive and literature studies, interviews and inspections.
Tillvaratagande och återanvändning av träbyggnadsmaterial : tjänstedesign för återbruk inom byggsektorn
The purpose of this Bachelor degree project is to design different types of services that can increase the amount of re-used timber within the building sector and by that means improve their environmental efforts. By examining how the sectors environmental work concerning recycling and re-using timber as a building material is getting on at present, conclusions have been drawn about what further could be done for improvement.The project has shown that there is a scarcity of information and statistics within the sector, but that there are efforts in progress to change this. Questionnaires have been sent to a number of companies working with demolition and utilizing re-usable materials in order to find out what kind of problems there are within the trade. Unfortunately the survey gave insufficient result due to the low reply frequency.It is obvious that active environmental work within the building sector is important and the knowledge acquired while working with the project has led to the design of three suggestions for services regarded as being of interest for improving the negative environmental impact caused by the sector:Suggestion 1 ? Sale of construction parts prior to the demolition of a buildingSuggestion 2 ? Re-utilization circulation when manufacturing buildingsSuggestion 3 ? Education in relation to the purchase of houses The positive and negative qualities of the suggestions have been examined with SWOT-analysis and further adaptions and the results have been interpreted.
BIM Building Information Model : Hinder & Drivkraft
The construction industry is a costly business such in respect of capital for most construction defects which then require rework, tear down and rebuild again. This study is meaningful awareness of tools that can reduce this best through communication and information sharing between the parties. The construction industry is known as temporary projects organizations, where the construction project consists of several actors who have to communicate and share information between them to avoid mistakes later in the build time. These actors are bounded together thus for the duration of the project, then broken when the project has reached its end. The challenge here is for these actors to apply a tool that can help and simplify communications, information sharing, and perhaps the most important aspect is to create a routine for the association and the shattering of these actors. To implement such behavior using a tool such as BIM in the industry whose size perhaps is indescribable may be a very hard task. BIM (Building Information Model) could be seen as the solution to this problem because it acts as a portal where the actors involved must sign in and communicate, share information, and eventually create a behavior, a routine for this association and division of the actors following the end of the project. The technology could help the involved from the beginning of the project, already in the model stage, break down and prevent any construction barriers when the building has been placed in the works.
BIM för Hållbart Byggande
The purpose of this study is to facilitate sustainable building by the use of BIM. The goal is to determine which aspects of sustainable building, which can be analyzed mainly with BIM tools, but also other aids.The study is based on literature studies and interviews. The literature review examines aspects important for sustainable building by studying environmental certification systems applicable in Sweden, as well as the BIM tools available on the market to analyze these aspects. The literature also includes the concepts of BIM and sustainability in order to provide a clearer view of its meaning. The interviews have brought the study's overall understanding of the industry and guidance on the subject.The results are presented in a table, where the aspects relevant to sustainable building are listed.
Prefabrikation - En studie av byggmetodens lönsamhet
This Bachelor?s thesis consists of two parts; one with prefabrication (prefab) in focus and thesecond part includes detail design of a house project. These parts are linked together by designingsome parts of the house project as prefabricated.The focus section investigates how prefabrication can act time-, costs- and environmentallyeffective to a Building project. This is investigated by combining literary sources with sourcesbased on reality in the shape of interviews. The result of the investigation is that prefabcould acteffectively on previously mentioned factors,if this way of building is used in a proper way.The detail design of the house started in a residential area with a new local plan in Huddinge,named Sjöängen II.
Granskning av Solibri Model Checker - En Svenskanpassning : Ja?mfo?relse av tva? egenkontrollsystem
The building industry are currently going through a huge alteration. The introduction of BIM (Building Information Modeling). Which also implements a lot of new ways of solving problems that building modeling can cause. This report is written for Uppsala University in cooperation with Temagruppen in Uppsala. However, it contains a comparison between two different systems that checks building models.
Assistansrobot "Slangaren"
This project is a step towards automatic firefighting. The goal is to decrease the number of personal injuries by replacing the human firefighter with robots or similar technical tools. Especially in very hostile environments due to risk of explosions or building collapse. A robot is easy to replace and can be maneuvered from a safe distance. The idea of the project comes from the company Drones Networking which aims for developing a totally autonomous firefighting system.