Sök:

Sökresultat:

9543 Uppsatser om Anatomy of building process - Sida 5 av 637

Packaging Design as a Brand-building Tool

The topic of our thesis is Packaging Design as a Brand Building Tool and we are presenting the Scandinavian perspective. We found the topic interesting because, from a theoretical point of view, we identified a scarcity in research focusing on packaging design as a brand management tool, and from a practical point of view, we found out that businesses use packaging design at different levels in their communication efforts. Thus we wanted to provide both academia and business world with a clear picture to what extent and how businesses use packaging design in their brand-building process. Therefore the aim of our thesis is to provide practitioners and academicians alike with a better understanding of how packaging design can be used to create strong brands in the FMCG sector in the Scandinavian market. To reach the stated aim first we provided a solid theoretical background of packaging, its elements and its role in the marketing mix.

INDUSTRIALISERING AV FLERBOSTADSHUS

The construction process which is used today while constructing residential buildings has for along time remained unchanged. Unfortunately the development process has gone away frombecoming industrialized and instead most of the work is done at the construction site. In thisrespect this is a worse alternative because the project outcome will be more expensive and theconstruction time will be longer. Skanska?s vision is to have a process which is more like the oneused in small residential buildings which is fully industrialized.The constructing process for residential building involves more parties and therefore it becomesmore complicated.

BIM - Förvaltarens Framtid

For nearly twenty years people have been talking about Product models, but given that the building industry is so conservative, it is hard to implement new working methods. Product models are these days known as Building Information Modeling, BIM. People often say they work with BIM but they often forget the most important part, the information. A 3D model should be linked with characteristics and information. Information that can be invaluable for the facility manager.We have a vision that in the best of worlds the facility manager would be able to "walk" into the model and see what kind of installations are inside the wall or in the roof.

Upprättande av mall för fuktsäkerhetsbeskrivning : Genom granskning av projekt ur fuktsäkerhetssynpunkt

During the 1990?s a large number of building projects were revealed where lack of moistsafety precautions during the construction process had led to extensive moisture damage. Alsoresent implemented studies have shown that the problems with moisture damages have ratherincreased than decreased during the past few years. Moist is considered to be one of the mainfactors to cause unhealth due to deficiencies in the indoor-environment and does also causeunnecessary expenses and a reduction of the confidence in the construction industry.In this Bachelor of Science thesis three projects have been reviewed to examine how moistsafetyhas been observed during the construction process. Main focus has been to identify thebuilding components that are the most exposed to moist, and to examine how they have beentaken into account during the period of design and construction.

Beslutsfattande vid anbudsgivning hos svenska byggentreprenörer

This thesis examines the tendering process from the point of view of Swedish building contractors. The purpose with the study is to chart the decision process for the contractors during the tendering process. The study is designed as a survey study. This made it possible to reach a wide base of respondents, not letting such factors as geography being an issue. The survey itself was characterised by a very high response rate compared to other similar studies. The result from this study shows that former experience from similar projects, current workload and the clients economic condition are very important factors for both whether or not the contractor will bid for a project as well as the cost estimation and tendering price. Former experience from similar projects is also an important factor for the determination of the indirect costs.

Träkolslera - en experimentell studie av blandningsförfarandet

Uppsats för avläggande av filosofie kandidatexamen iKulturvård, Bygghantverk, 22,5 hp, 2015..

Hur sker utvecklingen i Bosnien? : En studie om nationsbyggandet i Bosnien och Hercegovina ? utifra?n tre perspektiv.

Nation building is vital in post-war states to bring the people that have been at war together. To restore peace in a state, many different actors need to work together to bring stability, safety, and advancement to a new nation. There are several methods of nation building, and this thesis evolves around three of them. This is a qualitative study where three theories on nation building are used to analyze the development of nation building, and the obstacles Bosnia and Herzegovina still has to reach a national identity. Several studies are used in this thesis to show how the development has evolved in Bosnia and Herzegovina.

Energiåtervinning från gjuteriprocess till fastighet, undersökning för ökat utnyttjande av spillvärme

This diploma work on D-level is made in cooperation with Varnäsföretagen AB in Eskilstuna. The company performs contract manufactured aluminium goods. This work is a continuation on earlier diploma work in Varnäsföretagen AB. Even if the industry process consumes much energy for melting the aluminium goods, they consume a great amount of oil to warm up the building. The purpose of this work is to examine some places in the building and the process to see how much energy it is possible to recycles to the heating system and reduce the costs for heating.

Förskolor med passivhusteknik : En utredning av passiva förskolor

As a result of directives from EU, with the ambition to reach environmetal goals, The German organisation Passivhaus Institut has defined a passive house. A passive house is a building that is very energy efficient and makes a small impact on the environment. The energy from the inhabitants as well as the appliances & fixtures in the building should equal the energy that is required to heat the building. A Swedish version of the passive house definition has been defined, taking into account the climate conditions and the difference in building regulations.This thesis is a request from Skanska on how it can improve and develop an ongoing passive house project, involving an infant school. The intention of this thesis is to identify difficulties & display potential development areas for infant schools.The method of research conducted is as follows: interviews of clients, ventilation consultant, consultant for heating system and an energy calculation consultant, an inspection of the infant shcool in process, investigation of completed infant schools and a study of relevant literature.From this research it was found that it is difficult for infant schools to pass the criteria for passive houses. The conclusion of this thesis provide several guidelines on how to improve the outcome of existing projects & the steps needed to be taken for future development in this area..

Energiinventering av Soldathemmet

This examination paper is an energy-inventory of Soldathemmet at the regement in Halmstad, in colaboration with Fortifikationsverket in Halmstad. The building is first an foremost for the soldiers, where they can go for a cup of coffee or watch TV. There is also a museum and a drivers school in the building. Calculations have been done with two computerprograms; VIP+ and ISOVER Energy. The results were well matched with the statistics that were provided by Fortifikationsverket.

Emballage för väggelement i trä : Paketering, hantering, lager och transport

As a company it is required to work with strategies to minimize costs such as packaging and logistic costs. The increased market of industrial produced wooden buildings results that the time and the cost which the packaging of prefabricated building elements consume, is experienced to be in greater need of development than before and demands a better solution. The aim with this dissertation was to discover how the development of the handling of the packaging can improve the packaging process. The goal was to present improvement proposals for a simplified and thereby a more efficient production in time and cost perspective.The packaging process which includes packaging, handling, storage and transport were studied. Interviews were made with participants from the market for manufacturers of wooden houses and a case study was made at the company A-hus.

Simulering av värmebehov för kombinerad kontors- och laboratoriebyggnad utan traditionellt värmesystem

In this Thesis the possibilities of designing a larger building that is very energy efficient in the sense that it would not need a conventional heating system are discussed. Solar radiation transmitted through the windows, internal heat from occupants, lamps and electric appliances inside the building and heat recovered from the ventilation system then have to be sufficient for the heating of the building. This study is of general interest since the property company, Akademiska Hus, plans to use this study as a first step in determining if this technique could be used in the future and thus be worth further investments. A building without a conventional heating system of the size investigated in this project has not yet been built.The energy needed for the heating of the building was simulated using VIP+.The conclusions from the study are that it is possible to build large buildings without any conventional heating system. This could be achieved in many different ways, for example by lowering the inside temperature or by using better windows and heat recovery system with higher efficiency.

Nytt vin i gamla läglar - Kyrkorum i Svenska kyrkan; då, nu och imorgon

This is a chronological comparative study about opinions expressed in the Church of Sweden when the parishes want to change the inside of a church building. Certain concepts in the study are church, holy and holiness.Architecture plays an important role in the design of a church building. Some traditionaltheological terms that should be considered essential are Via sacra, Domus Dei, DomusEcclesiae. My focus is churches from the 19th century. Today the buildings change in a lotof ways; theologically, practically, economically etc.During the 20th century the churches have got a lot of new objects to use in the services andin the church building.

Förbättring av U-värde i träkonstruktion för fönster med Aerogel

When constructing a building, a number of aspects must be harmonized in order for it to fulfill requirements ? a building must fulfill requirements such a load-bearing, conservation of energy and a good indoor environment by means of, among other things, moisture proofing .Moisture problems in buildings can affect health negatively. As we are increasingly staying in indoors, demands on a good indoor environment are higher.This work starts with examining moisture problems in slab-on-ground solutions, and then links the various scenarios to moisture problems in a concrete slab of a real building. The building with moisture problems is located in Årby by in Borlänge and moisture damage was found in the slab at an apartment adjoining wall.By reviewing literature written within the field of moisture problem, making hand calculations and modeling in the program Comsol Multiphysics, judgments are made to find explanations as to why the rise of moisture occurred in the building in Årby by.Generally, the following guidelines may be used to reduce the risk of moisture problems in slab-on-ground constructions:Drying of construction moisture before laying the floor material.Using draining layer beneath the slab, to prevent capillary suction.Using insulation under the slab, partly for comfort and to establish the temperature difference between the ground and the concrete slab.Avoid direct contact between the wood and concrete, due to degradation and fouling smells that normally occurs.If necessary, use additional vapor barrier.In addition to the above, there are various methods for moisture-proof and moisture-monitoring by design or by the method ByggaF suited for the entire construction process various events..

Analys av hur byggnadens höjd påverkar energiförbrukningen i flerbostads- och kontorshus

This diploma work has been carried out in collaboration with the building contractor Sh Bygg Fastighetsutveckling AB in Uppsala with the intention to investigate how the height of a building affects various energy aspects such as transmission losses, infiltration, and the specific energy usage. Three different reference objects have been studied. The reference objects have been simulated for four different heights in the calculation program VIP-Energy.The results show that an increase in floor number can lead to both advantages and disadvantages. As the number of floors increases, transmission losses per square meter floor area decreases. However, as the height of the building increases, the reduction rate decreases.

<- Föregående sida 5 Nästa sida ->