Sökresultat:
2317 Uppsatser om Additional building - Sida 4 av 155
Nytt vin i gamla läglar - Kyrkorum i Svenska kyrkan; då, nu och imorgon
This is a chronological comparative study about opinions expressed in the Church of Sweden when the parishes want to change the inside of a church building. Certain concepts in the study are church, holy and holiness.Architecture plays an important role in the design of a church building. Some traditionaltheological terms that should be considered essential are Via sacra, Domus Dei, DomusEcclesiae. My focus is churches from the 19th century. Today the buildings change in a lotof ways; theologically, practically, economically etc.During the 20th century the churches have got a lot of new objects to use in the services andin the church building.
LEED i Sverige och i byggprojektet Borgarfjord 3.
This thesis provides a good introduction to the American environmental certification system LEED, Leadership in Energy and Environmental Design, and trough compar-isons between Sweden and the United States an explanation to the systems design is given. The work is closely linked to a LEED Core & Shell project in Stockholm, Swe-den, where the goal is to reach the second highest rating in LEED - Gold.This thesis gives a broad description of the LEED system and a more profound study of the energy sector, Energy and Atmosphere. Here, for example, an analysis has been made of how the energy consumption of an imaginary building designed according to the requirements of the BBR (Swedish building code) performs in comparison to the Baseline building in LEED.The existing model of Borgarfjord 3, which served as a case study in this work, has al-so been modified to investigate the energy savings that could have been achieved by adding extra insulation to the building. A description of the problems, regarding how the Swedish district heating system (DES) is treated in LEED, is given as well as the suggested modifications. This is an issue that will be pursued during the process of shaping a new, international, version of LEED due to be launched 2012..
Analys av hur byggnadens höjd påverkar energiförbrukningen i flerbostads- och kontorshus
This diploma work has been carried out in collaboration with the building contractor Sh Bygg Fastighetsutveckling AB in Uppsala with the intention to investigate how the height of a building affects various energy aspects such as transmission losses, infiltration, and the specific energy usage. Three different reference objects have been studied. The reference objects have been simulated for four different heights in the calculation program VIP-Energy.The results show that an increase in floor number can lead to both advantages and disadvantages. As the number of floors increases, transmission losses per square meter floor area decreases. However, as the height of the building increases, the reduction rate decreases.
Energikartläggning och energieffektiviseringsåtgärder i Zoologen på Göteborgs Universitet
The question of excessive global energy use needs to be solved. All energy production and usage have negative environmental impacts, which are best solved by reducing energy consumption and by using energy more efficiently. A large part of the Swedish energy use is concentrated to the building sector and to reduce the total energy consumption real efforts need to be made to make buildings more energy efficient.The aim of this study was to investigate how energy is used in one of Göteborg University?s buildings and to find measures that can be taken to improve its energy efficiency. The chosen building Zoologen, is used for research and education.The main method of the study is computer simulations of the present building and of possible energy reducing measures to be made in the future.
Kulthus från bronsåldern : En studie om stengrundshus och dess landskapskontext
This essay deals with a cultic building which focuses on the stone feature during the Bronze Age in Sweden and Denmark. I will discuss about the meaning of the stone feature and it also deals with the surrounding next to the building in order to see a bigger perspective. It consists of five excavations which this essay is based upon. The five excavations are Sandergård in Denmark, Broby and Hågahagen in Uppland, Tofta and Koarum in Skåne..
BIM - Förvaltarens Framtid
For nearly twenty years people have been talking about Product models, but given that the building industry is so conservative, it is hard to implement new working methods. Product models are these days known as Building Information Modeling, BIM. People often say they work with BIM but they often forget the most important part, the information. A 3D model should be linked with characteristics and information. Information that can be invaluable for the facility manager.We have a vision that in the best of worlds the facility manager would be able to "walk" into the model and see what kind of installations are inside the wall or in the roof.
Brandsäkerhet i ett småhus
This essay includes the planning and designing of a house as well as writing a rapport about howto increase fire safety in small buildings.More than 6000 homes burn in Sweden every year (Brandskyddsföreningen, 2012c). Thedevastation and the costs are usually very high. This report examines possible measures to reduceboth personal injuries and economic losses resulting from house fires in small buildings.Swedishbuilding regulationsplay a major role when it comes to constructional fire safety. However therequirements inSwedish building regulations are very low for small buildings and this is anargument for raising the requirements.The report shows and describes possible methods to build safer with regards to fire in terms ofmaterials and different building structures. Major focus has been on fire cells but other solutionsare also examined and described.
Duo - ny skola på Hälsingehöjden
A variety of demands have to be considered in the design of a new opera house in Galärvarvet. All possible viewpoints are important to be aware of, as is the need for the new building to be a contrast to the already existing opera house in Stockholm. The restricted site also makes a multitude of demands on the building's design.By rationalizing the layout and structure and also by making the footprint smaller, the complex building of over 30 000 square meters can be fitted and blended into the existing physical context. Unlike the existing opera house in Stockholm, the new opera house shows the rationality and the advanced technology that lies behind the scenes and becomes the character of the entire building. Through the dynamic façade, the new opera can convey any character it so desires, just like scenes do through different settings.
Ronningsgift
This thesis examines the sheep shed called Ronningsgift, and its historical functions and geographical
location. The study aims to make a comprehensive gathering of the existing knowledge and to shed
light on new theories about the history of Ronningsgift. This is done through desk research including
literature and archive search, as well as an investigation and description of the construction and
materials, and an interview. Further, I got the opportunity to take part of the results of two C14
samples from Ronningsgift.
The literature and archive search shows that the most common theory of the historical function is as a
guest house (g?ststuga/h?gstuga) or more traditionally called, Malst?ue/Malsteuvu.
Utvärdering och åtgärdsförslag av energianvändning i kontorsbyggnad
AbstractEmbla 5 is an office building which has done a large improvement. The clients of this building has made an order of WSP and the student Anders Kempe to calculate the use of energy for the building, and after that result proposing further measures which can decrease the energy use of Embla 5.The ground for this report is when calculation of the present energy use of the building is stated. To make that information of a number of parameters such as envelope, the heating system and ventilation has been located and set in to the simulation program IDA ICE which calculate the energy use.To improve the energy use further this project has been concentrated to change the system of ventilation. Today the ventilation system is of the kind CAV (constant air volume) and the air flow is dimensioned for after recommendations from BBR and Arbetsmiljöverket in the office spaces. Consider that Embla 5 is an office building where the people only staying for 8-10 hours/day so was the ide to see how much energy saving if the air flow is reduced the time people not being in the building.
Skola i Annedal
This project concerns a new lower and mid level compulsory school in the currently developing area of Annedal, northwest of central Stockholm. According to the given program, the school should hold 500 pupils and 100 pre-school children. As an addition to the given program, my suggustion holds a sports hall and a public library.In my project, my ambition has been to investigate how to create an inspiring and exiting place for kids to inhabit and, at the same time, create an activated, central place in a developing suburb. The latter has resulted in the two program-related additions, which purposes is to extend the hours during which the area is activated and to create additional incitements for visiting the building. Both additions are chosen based on lack of service in the area. Architectually, I've been inspired by the medieval castle which has been used as an inspirational resource for the parts of the school holding classrooms.
Att bygga ett bibliotek : En studie av funktion och rörelse i tre nyinrättade biblioteksbyggnader - Kungliga tekniska högskolans bibliotek, Sambiblioteket i Härnösand och Vitterhetsakademiens bibliotek
A large part of research about libraries and library buildings in Sweden has been focused on how the building looks not how it functions with the library. The aim with this master?s thesis is to study how a library building is functioning and how its users are experiencing it. This is studied in three libraries, Kungliga tekniska högskolans bibliotek, Sambiblioteket in Härnösand and Vitterhetsakademiens bibliotek. With the questions of how they were planed, what did the libraries want from the new building and which of these demands were realized.
Leveranslogistik på byggarbetsplatsen
Problem: How do delivery logistics work in practice at the building site?
Where are the big problems? How to make building logistics more
effective? Do the site management and the haulers agree about
questions concerning both parties? What is possible to gain by
using better logistics? Is it possible to gain time with better
logistics and by that reducing the costs?
Purpose and aim: The purpose is to discover if there are any disagreements between
the site management and the haulers. If disagreements occur they
will be examined and probable measures based on the problems
will be suggested. Another intention is to bring key ratios
concerning time spent for deliveries forward. One aim is to update
a similar report made in 1972.
Bosnien en studie av OHR statsbyggande
This essay examines the international communitys intervention in Bosnia. The purpuse i to give the reader a deaper understanding of the problems appeared in re-building the bosnianstate. Office of the higher representive (OHR), was to become the koordinator of therecontruction of the institutions and governance. The theory used fore the examination isstate-building, whith an alingnment of state-building trough the international community.The second part of the essay examine the ideas of the High representive (HR) trough threedifferent dimensions. The idea-analysies search to present the core of ideas of OHR, nationalparties and the reconstuction of media.
Utfackningsvägg av lättbetongblock i passivhus
AbstractThis report intends through a case study to investigate if lightweight concrete isappropriate as main material in the outer wall of a seven storey residential building.A technical design is carried out in accordance with the definitions and requirementsfor passive houses, given by FEBY?s1 ?Demand specification for passive houses?.A literature review is also carried out for a comparison between regular bolt wall andlight weight concrete wall, with a focus on the safety of moisture.The lightweight concrete block used in the report is as a celblock produced by thecompany H+H Sweden AB.The methods used have resulted in compliance with requirements andrecommendations from authorities. Calculations of energy, noise and moisture riskassessment has been carried out.The work has resulted in the conclusion that the lightweight concrete itself is notable to isolate in the extent necessary to obtain chosen U-value of 0,1 W/m2 ° C,without getting to thick. Therefore additional insulation is needed. There are fewrelevant reference objects built with only light weight concrete.