Framtiden för gamla Habo ullspinneri
This report presents an investigation and a new design of Habo Ullspinneris old industrial premises. It is based on the owners visions and wishes, two questionnaires and also considering of the historical value.Habo Ullspinneri was founded in 1882 by Frans August Johansson and was moved to the location it has today, near Hökån in Habo, three years later. The electricity that the machines in the industry needed was extracted from the small river that is placed under the building. In 1960 there was a fire and the result became the end of the industrial activity that had taken place in the building.There is no steady activity in the building at the moment. It is nowadays temporarily used as an agriculture museum and as a store room.
BIM-projektering i praktiken
The use of CAD, within the building industry came strongly, during the 1980?s and the 1990?s. The development has since then rapidly progressed and the using of 3D-models has in addition increased. We are now at the edge of next step of evolution. BIM, Building Information Model(ing), is here.
Upplevd trafiksäkerhet med mittbarriär
AbstractThis report intends through a case study to investigate if lightweight concrete isappropriate as main material in the outer wall of a seven storey residential building.A technical design is carried out in accordance with the definitions and requirementsfor passive houses, given by FEBY?s1 ?Demand specification for passive houses?.A literature review is also carried out for a comparison between regular bolt wall andlight weight concrete wall, with a focus on the safety of moisture.The lightweight concrete block used in the report is as a celblock produced by thecompany H+H Sweden AB.The methods used have resulted in compliance with requirements andrecommendations from authorities. Calculations of energy, noise and moisture riskassessment has been carried out.The work has resulted in the conclusion that the lightweight concrete itself is notable to isolate in the extent necessary to obtain chosen U-value of 0,1 W/m2 ° C,without getting to thick. Therefore additional insulation is needed. There are fewrelevant reference objects built with only light weight concrete.
Församlingshem, Bankeryd
This report presents a thesis project at the School of Engineering, Jo?nko?pingUniversity, where the task has been to develop a proposal for a parish communitycentre for the Swedish church?s parish community in Bankeryd.Background1 st of November in 2004 the parish in Bankeryd appointed a special commissionof inquiry called Framtidsgruppen (Future Group), to analyse the parishcommunity?s different activities during the past 5 years and analyse the futureactivities and needs for the upcoming 5-10 years. This analysis would underlie theneeds of building a new centre for the parish community.Implementation, results and conclusionThe main focal points which this report is concentrated on has been to develop abuilding that is well suited for the activities, well adjusted for disabled persons andthe building shall be appealing in an architectural point of view.Based on the information provided from the parish community, studies ofliterature, reference objects and discussions with the contact person at the parishcommunity and the instructor of this project, the programming has beendeveloped. The building?s programming has been the source for the continuedwork with floor plans and the building design..
Go Down Arts Centre : Nairobi, Kenya
The Go Down Arts Centre is a proposal for a new building to an existing organisation in Nairobi, Kenya. The proposal relates to the scale of the city by making a statement on a future urban path, and by welcoming the city in to the building. The proposal houses both activities affiliated to Go Down, such as studios and rehersal rooms, as well as opportunities for the visitor to meet and interact with the culture produced at Go Down, both in formal and informal settings. The building is closed to its surroundings, apart from a grand entrance towards the urban path. There, the city passes through the building to an inner courtyard, where the communication to all the rooms and activities takes place.
Nyutveckling av bakdörrar vid Sapa Building System AB
Sapa är en av de största tillverkarna i världen av aluminiumprofiler. Sapa Building System AB är ett dotterbolag till Sapa group och är en av de största leverantörerna i Europa på byggsystem. Några av deras produkter är bakdörrarna RD 3010 och RD 3020 för lastbilar, släp och trailers som från början var ämnade som sidodörrar. Som bakdörrar är de överdimensionerade då sidodörrar hade högre hållfasthetskrav. I dagens läge väger och kostar de mer än nödvändigt där av önskar Sapa Building System AB en nyutveckling av bakdörrarna.Målet är att omkonstruera bakdörrarna RD 3010 och RD 3020 så att de blir lättare, smidigare och billigare genom att konstruera en ny kantskoning till Sapa Building System AB:s befintliga aluminiumlämprofiler.Arbetet har resulterat i att ritningsunderlag för nya profiler har tagits fram där man valt att limma ihop dörrarnas delar istället för att nita.
Klimatskärmens funktion : En jämförande analys av projekterade nybyggnationer i Östra Salabacke, ur ett energi- samt fuktperspektiv
The design of the building envelope affects the energy consumption of a building. As the energy requirements for new buildings are becoming more demanding, the performance of the building envelope must be improved. Energy efficiency and durability are important attributes to consider.This report includes investigations of the building envelope, moisture and passive solar energy. It is based on the analysis of two different buildings with different designs. These buildings stand as reference for two of the companies who are working on a new, climate smart, residential area in Uppsala, Sweden.Studies and analyses on energy consumption and moisture transportation were made.
Företagsstudie om värmeöverföring : Beskrivning av värmeflöden hos en lagerbyggnad
The study took place at a food corporation in Växjö, Sweden. It describes a building that contains four tanks in which glucose syrup is stored. The purpose of the study was to calculate the amount of heat that leaves the building and the amount of heat that is supplied by the installed heating equipment. Before the calculations could be implemented, all the systems that supply the building with heat had to be examined. With a small amount of information from earlier studies, the work to gather all the data necessary for the calculations began.
Energi- och kostnadseffektiva klimatskal : För lager-, industri- och kontorsbyggnader
A study to optimize insulation thickness for stock-, industrial- and office-buildings for external walls and roof in an economical perspective has been conducted on behalf of DynaMate. DynaMate?s role is to maintain all Scania?s buildings. Analysis has also included other parts of the building envelope, such as windows, exterior doors and industrial doors. In this thesis, three different types of exterior wall constructions has been investigated, these are a sandwich design consisting of sheet metal and a another one consisting of concrete, as well as a wall of concrete with a coating of plasters.
Prefabricerat trähusbyggande med moduler : För- och nackdelar samt förslag på vidareutveckling
The construction industry can contribute to a healthier sustainable community. A development that is going on right now is by using more prefabricated volume- and plan elements on the construction sites. Building with this method not only provides a benefit to the environment, but also reduces production rates by taking up to 80 percent less time to build. By building in this way it will be easier to recycle and keep all the material that otherwise would go to waste. Also by building inside a protected environment, the material retains its good quality.This report will take forward proposals on further development of prefabricated volume element of wood, by first presenting this construction methods advantages and disadvantages..
Mer hyresrätter åt folket! En studie om Hallands hyresbostadsmarknad. : - Att skapa lönsamhet för hyresrätter
A variety of demands have to be considered in the design of a new opera house in Galärvarvet. All possible viewpoints are important to be aware of, as is the need for the new building to be a contrast to the already existing opera house in Stockholm. The restricted site also makes a multitude of demands on the building's design.By rationalizing the layout and structure and also by making the footprint smaller, the complex building of over 30 000 square meters can be fitted and blended into the existing physical context. Unlike the existing opera house in Stockholm, the new opera house shows the rationality and the advanced technology that lies behind the scenes and becomes the character of the entire building. Through the dynamic façade, the new opera can convey any character it so desires, just like scenes do through different settings.
Byggnadsminnesförklaring : ett långsiktig hållbart skydd?
There are currently 2160 buildings in Sweden that are protected by law with the designation as a cultural heritage building, which is the strongest protection that can be obtained for a building of cultural historic significance. The purpose of this thesis is to research how strong and sustainable the protection of such a designation is and how you can motivate a revocation. Furthermore, this thesis aims to give an overall insight into all cases where there has been a revocation.To achieve the protection of a designation as a cultural heritage building, the object has to be of outstanding interest on account of its cultural historic value. In the first part, this thesis gives a short historic background of the cultural heritage law and its terms, like outstanding interest and cultural historic value. The County Administrative Board's documents about revocation are the main source for this research.There have been 24 cases of revocation and the frequency of such cases has increased in the past ten years.
Energiåtgång under tillverkning och produktion av byggnadskomponenter
This diploma work addresses the question of how much energy is spent whenmanufacturing the components of a building as well as of how much energy is used inthe production of a building. The object of the studies is BioCentrum at the SwedishUniversity of Agricultural Sciences in Ultuna just outside the city of Uppsala. The aimof the work was to investigate how much energy was consumed when manufacturingand production in relation to the management, how many years the production wasrepresented. It was also a study in how mature the construction industry is to answerhow much energy was consumed in manufacturing.In order to get these answers a question form was developed and sent to thesuppliers to BioCentrum. In this form they were to respond to the quantity suppliedto BioCentrum and the amount of energy was spent when manufacturing thecomponents.
Metoder för lastprioritering i fjärrvärmecentraler
A problem in the field of district heating is the oil burners needed to provide power when a peak load occurs. One possible way of reducing the needed amount of oil is to reduce the power demand for space heating in the district-heating substations when the need for district heating water exceeds a certain limit. This can be done by use of a locally working controller function.In this Thesis the options concerning load priority are evaluated. To evaluate the potential for using controller functions concerning peak load priority an experiment was brought out in a chosen district-heating substation. The impact on the indoor thermal comfort during a heat reduction was also taken into account.
Energi och klimatanalys O-huset på Campus i Halmstad
AbstractThe indoor environment affects the human performance. Noise pollution, poor lightning and coloring are some of the factors that affect our work performance. The human is also affected by the air change and temperature, these factors are in most buildings possible to adjust and through this make economic savings. To find out about the indoor environment in the O-building a questionnaire was handed out, measurements/surveys and an interview was also made. 108 questionnaires where handed out to employees and students.