Sök:

Montering av isolering på vattentank


One of today problem at IVT industries would be assembly of insulation on water cisterns. The element of assembly insulation on the cistern gets too elevated; hence one has to climb onto the stand the cistern is assembly on. This will increase the risk of work related injuries when there is a risk of falling down. It?s also rather strenuous on shoulders due to work with your arms high above your head. Further, it?s very difficult to get the insulation in place, this force us to compress the roof of the insulation with the sides of the insulation, which is very strenuous on the body. The purpose of this degree project has been to develop a work method with improved work position and improved workflow through the premises.This paper is divided into: Problem review, theoretic solutions, evaluation of solutions and design of tools. Each proposal to each solution is motivated with pros and cons. Then the best-fitted solution for IVT industries is presented.After examination of different solutions, I?ve concluded the best solution is to have separated assembly station for insulation that is preceded by assembly of cistern to it?s under part. Through the use of a personnel lifter assembly of insulation can be done without climbing on assembly stand. The body gets an improved work position because you no longer need to work with your arms up high. This is the solution that I?m recommending to IVT industries AB. Through elevating the assembly stations and move both test stations and refill of coolant to the right wall, an increased flow through the premises will be achieved.

Författare

Liselott Granath

Lärosäte och institution

Linköpings universitet/Institutionen för konstruktions- och produktionsteknik

Nivå:

"Kandidatuppsats". Självständigt arbete (examensarbete ) om minst 15 högskolepoäng utfört för att erhålla kandidatexamen.

Läs mer..