Effektiviteten i markanvisningsprocessen

En undersökning av samtliga markanvisningar i Stockholm 2004-2008


The lack of housing in the Swedish metropolitan areas is today a well-known fact. This isespecially true for the region in and around Stockholm. Due to the large amount ofmunicipality-owned land within Stockholm municipality the area for many new housingprojects are acquired through land allocation. How much time this process of land allocationconsumes for a typical project is today not really known. Equally unknown is the exactoutcome of the process, i.e. the number of units constructed. A study that answers thesequestions is therefore interesting for many of the stakeholders involved in the industry.This Master of Science thesis is intended to answer the question of how effective the processof land allocation is. This is done through finding answers to three core questions: how manyapartments that really are constructed, how good the municipality is at estimating the numberof units that is possible to construct and the time consumed by the process. A study of all landallocations from the years 2004 through 2008 has been done in order to find answers to thesequestions.The study has been done through acquiring data about all the land allocation projects from themunicipality and then investigating what happened with these in the end. This was compiledand analyzed for every year in the study in order to give a clear picture about how the typicalprocess looked like and what the outcome was. Both the process in total and its different stepswas examined in order to see if any of the parts of the process is more time-consuming. Thenumber of constructed units has been compiled in a similar manner and the differencebetween the estimated number and the outcome has been calculated.The result from the study indicates that approximately half of the allocated apartments havebeen constructed up to this point. The estimates of the municipality also deviated with asmuch as about 28 percent from the outcome. The study furthermore shows that it takes aboutfive years for a project to start construction when counting from the day of the land allocation.

Författare

Jonas Gran

Lärosäte och institution

KTH/Fastigheter och byggande

Nivå:

"Masteruppsats". Självständigt arbete (examensarbete) om 30 högskolepoäng (med vissa undantag) utfört för att erhålla masterexamen.

Läs mer..