Sökresultat:
124 Uppsatser om Bearing - Sida 1 av 9
Utvärdering av en ny typ av lagerinbyggnad för traktionsmotorer
The thesis evaluates a new kind of Bearing arrangement in a traction motor that ABB hasdeveloped. Since the arrangement is designed in a new and innovative way it needs to beevaluated to see if it is safe to use. In today?s traction motors, Bearings with a big internalclearance (C4-clearance) are used. The basic idea of the new arrangement is to reduce the fitsbetween the Bearing and shaft/house.
Tid- och kostnadsanalys av innerväggar
In our thesis we will compare interior walls, both Bearing and non-Bearing. All of thewalls analyzed are currently used in production by Skanska Construction, who is alsoour employer/supervisor for the project. The different wall types will be comparedfocusing mainly on time, cost and workability. All of these walls aside from the nonBearingwall are constructed using concrete, either prefabricated or cast on site..
Ett flervariabelt feldetekteringssystem för övervakning av bärlagertemperaturen i vattenkraftturbiner
The purpose of this thesis work was to develop an automatic fault detection system for surveillance of Bearing temperature in hydropower turbines. The parameters used except the Bearing temperature were cooling water temperature and cooling water flow. A simple static model based on data sampled every minute was developed to estimate the Bearing temperature. Then a detector for detection of change in Bearing temperature based on the CUSUM-algorithm was designed. Since the amount of data was very small the developed model was too uncertain to be used in a working system.The designed fault detection system showed to work well for the available data.
Spetsbärförmåga hos betongpålar slagna i friktionsjord
The purpose of this study was to build a database for point-Bearing piles in dense noncohesive soil, predominantly moraine. Further, the database was analysed and areas with difficult geotechnical conditions was identified.The database includes for point-Bearing piles driven to refusal in moraine. Piles with mainly shaft friction have been excluded. Only concrete piles have been included. Geographically the database covers almost all geotechnical conditions of Sweden.
Påbyggnad av våningsplan medlättkonstruktion : En jämförelse av stommaterialen trä ochtunnplåt
The purpose of this thesis is to examinethe possibilities for adding a floor to anexisting building using the two materialswood and sheet metal profiles as the loadBearing structure. An apartment buildingfrom the 60s has been used as referencehouse. Two different suggestions for thedesign are presented in the rapport. Oneof them has been analyzed with wood andsheet metal as the load Bearing structure.Using the old constructional calculationsand blueprints of the existing buildings,the load Bearing capacity has beencalculated. In the calculation programFEM-Design the building has been testedwith the loads that an extra floor wouldgive.
Mineraliseringar utmed REE-linjen i sydvästra Bergslagen
This paper briefly summarizes Bergslagen as a bedrock province in order to give background to the genesis and presence of REE-Bearing minerals (short for Rare Earth Elements) in the region. These mineralizations mainly occur along the REE-line, a line aproximately a hundred kilometers in length between Norberg in the north and Nora in the south with a width of a few kilometers. Situated in the southwest of Bergslagen it is currently one of only a few places in Sweden where REE-Bearing iron oxide mineralizations are potentially economically viable for mining. Ore microscopy has been conducted in order to characterize an ore sample from Myrbacksfältet, one of few sulphide rich iron oxide mineralizations within the REE-line. Additionally, an electron microscope analysis of a sample from Stålklockan, a suspected REE-Bearing mineralization also within the REE-line was confirmed by EDS (short for Energy Dispersive Spectrum) analysis.
Analys av lageregenskaper utifrån mätningar i testrigg
Vertical hydropower units has a rotating mass of up to 1000 tons. For the generator and turbine to work well the rotating system is required to be centered in relation to the surrounding structure. This is achieved by means of radial Bearings. The dynamic characteristics of these Bearings have a strong impact on the overall rotational dynamics of the total system and thus influence the vibrations in the unit. At Vattenfall Research & Development in Älvkarleby ongoing research is taking place on how the Bearing parameters should be represented in the rotor dynamic calculations.
Smörjning Av Lager
The work thesis was performed at Assalub a company which is situated in Åtvidaberg. The company works with developing, manufacturing and marketing equipment for handling of lubricants for light and heavier industry. The work thesis it is based on a inquiry Assalub got from MacGregor which is a company within cargo solution, from port to offshore system.For unloading grain and other material from the ship cargo it is used combined inlet feeder and screw conveyor, there the inlet feeder is drilling down through the cargo and feed the screw conveyer with material to further destination. At the bottom of the screw conveyer and the inlet feeder there is a Bearing that keep the parts together. However the lubrication of the Bearing must be made manually.
Geografisk prioritering av CTI-utrustad virkestransportkapacitet
Previous studies of central tire inflation (CTI) in truck transport of roundwood have shown potential benefits to include more even wood flow and reduced road damage. The greatest benefits are found to be during periods of low Bearing capacity such as spring thaw. No previous studies have examined geographical variations in the potential benefit of CTI-equipped trucks. The aim of the study was to develop and use a simple method for geographically prioritizing the use of CTI-equipped trucks within a forest company´s sector of activity.The host company for the study was Holmen Skog. The area studied consisted of Holmen Skog?s entire sector of activity extending from the province of Västerbotten to the province of Småland.
Längdmätning i engreppsskördare
Detta examensarbete har gjorts på uppdrag av SP Maskiner AB och berör längdmätningsenheten på skördaraggregatet SP451LF. Pulsgivaren i den befintliga längdmätningen anses inte nå en acceptabel livslängd och därför skall ett sensorlager prövas som ersättare.Uppdraget består i att söka ett lämpligt sensorlager, dimensionera en komplett mäthjulslagring samt att ta fram ett konstruktionsförslag till prototyp på längdmätning.Arbetet begränsas av att den omkonstruerade längdmätningen skall passa på SP451LF aggregatet. Det betyder att längdmätningens infästning mot aggregatet inte får förändras och dess yttermått måste hållas inom de gränser som aggregatets chassi tillåter..
Tillämpning av nya beräkningsmetoder för branddimensionering av träkonstruktioner - analyser och jämförelser
To build high-rise buildings made of timber has for long been limited by national laws, due to the lack of knowledge in engineering solutions. Frame structures made of wood has for a long time been associated with major fire hazards and consequently lower safety and this connection is still being made today. The increased environmental awareness in recent years has contributed to the exploitation of indigenous building materials, including wood from our own Swedish forests and has become increasingly common. Increased knowledge about how structures behave in fire and how they can be protected in order to achieve safe timber structures has resulted in a growing interest in these structures in the construction industry. Research in the area is constantly updated and new laws allow any number of storeys in wooden buildings in Sweden as long as the performance requirements are fulfilled.The main part of this work has involved calculations of the fire resistance and load Bearing capacity of floor and wall constructions.
Utvärdering av den bärande tegel- och betongstommen i en byggnad från år 1916
This Master thesis is about a postal- and telegraphic building in Eskilstuna, Sweden. The construction methods for the specific building and buildings in general from the same time are described. The purpose of the report is to describe the loads acting on the building and how it has been built and why it has been rebuilt during the years. After this, possibilities of reconstruction and adaptation for today?s demands can be evaluated.
Bättre åtkomst till avverkningstrakter med anpassat marktryck från avverkningsmaskinerna
The global climate-change means increasing mean-temperature and higher precipitation in Sweden, which leads to shorter periods of frozen ground in the forest. At the same time the harvesting machines are getting bigger and more powerful. The forest industry aim at an even wood flow, and the ground damage has to be as low as possible. The two biggest causes for ground-damage is the Bearing capacity of the forest ground and the ground-pressure of the harvesting machines. The aim of this study was to find out some rules for the machine choice considering ground pressure, when harvesting on ground with low Bearing capacity.A field study, using a Valmet 890.3 forwarder, was carried out where different ground pressures and their effect on the ground were tested on two different types of ground.Additionally, an inventory of damaged harvesting grounds was made.
Konstruktion av efterbehandlare
The purpose of this report is to examine various roof structures that can operate in a warehouse with large spans. The building that is examined in the report is currently under construction, and the roof construction has already been selected. The selected roof system will therefore be compared with some other structures and materials that have been possible. The report will evaluate three different frame materials, two insulating barriers and two overlaying materials. Another important part in major construction projects is the roof safety.
Bärförmågetillväxt i pålad friktionsjord
Piled friction soil show a set-up which is increasing with the time after installation. The cost could be reduced if the set-up had been taken into account when designing but in Sweden it is very unusual to do that. Previous studies showed that set-up can vary between 25 % and 75 % during the first 90 days after pile installation. This showed that the effect of the phenomenon is difficult to predict. A study involving five projects have been carried out by specifying certain parameters like pile type, method for pile installation and test method for measure the Bearing capacity in friction soils located in Sweden.