145 Uppsatser om Assembly - Sida 1 av 10

Montering av isolering på vattentank

One of today problem at IVT industries would be Assembly of insulation on water cisterns. The element of Assembly insulation on the cistern gets too elevated; hence one has to climb onto the stand the cistern is Assembly on. This will increase the risk of work related injuries when there is a risk of falling down. It?s also rather strenuous on shoulders due to work with your arms high above your head.

Effektivisering av arbetsplats : Effektivisering av monteringsplats vid Wigells AB

The work presented in this report is written at IEIs department on Linköping Institute of Technology. The report aims to increase the Assembly efficiency at Wigells AB. The report shall be used as a guide for the implementation of changes at other workstations in the company. Together with Träcentrum in Nässjö, Wigells AB has identified the needs of this study and contacted IEI at Linköping Institute of Technology.In order to implement an efficient Assembly line at the company, studies on lean production have been made. This theory has been studied and together with our own views and findings at the company we have analyzed the Assembly area.Wigells is a small company that manufactures wood furniture.

Optimering av monteringsavdelningen förfjädergunglekar : Med Lean mot kundorderstyrd montering

If Sweden want to be able to compete internationally with its production capacity,it is important to work actively with production development and production ofresource-and time-efficient. This report is a bachelor thesis of 15 hp conducted atthe University of Halmstad. Using the principles of continuous improvement andLean Production, the author developed a concept for HAGS Aneby AB to changeto the customer order driven Assembly of spring toys.First of all, the theories of Lean Production, logistics and ergonomics are used tobuild and present a theoretical framework for further examination. Then, toachieve the target, the current Assembly process is analyzed to develop some firstconceptual ideas for improvement. In order to develop the best advice, theconcepts are evaluated against the company?s requirementsThe developed action plan gives recommendations on how the company shouldrestructure their Assembly process and the organization of the related departmentin order to produce spring toys in a more time efficient and lean way.

Förmontering av lyftramverk

Volvo Hauler & Loader Division in Arvika produces wheel loaders which they deliverthroughout the world. The factory which is situated in Arvika is the largest wheel loader plant in the whole world, with its 1 100 employees. The different models stretch from L60E all theway up to the brand new L350F, with a loader capacity from six tons up to a staggering 35.The Assembly of the different models are divided into three different Assembly lines, Small(L60-L90), Medium (L110-L120) and Large (L150-L220). The Assembly of Heavy (L350)has just been started with an upcoming pre series.This examination paper gives recommendations of improvements and necessary modifications to rationalize the pre-Assembly of boom units. Three different scenarios are presented in the paper.

Ergonomisk utvärdering av NAFC- linorna: Med konceptförslag och genomförda delåtgärder

This paper presents the result of a master thesis project at 30 Hp, master of industrial engineering at Luleå University of Technology. The project was performed during 20 weeks, spring 2014, in collaboration with ABB Control Products in Västerås. The aim of the project was to evaluate two half-automated Assembly lines for a new generation of contactors, the NAFC Assembly lines (New AF Conductor). The aim and purpose of the project was achieved by answering the following questions:? How are the ergonomic working conditions at the NAFC Assembly lines during spring 2014?? Which areas at NAFC Assembly lines can be improved for the work environment?? How can the ergonomic work conditions improve at the NAFC Assembly lines?Literature reviews were performed from earlier research papers and articles of the ergonomic, musculoskeletal and work environment subject, from where a number of chosen methods and tools were used to perform the ergonomic evaluation.

Montagemetoder för axel och rotor

At ABB LV Motors in Västerås the shaft is assembled into the rotor with a shrink fit. After athorough investigation of the Assembly method, several factors that make the insertion of theshaft more difficult has been discovered. Some affect the Assembly directly while others onlyhave an indirect influence. The investigation has shown that the radial play between the shaftsouter radius and the rotors inner radius might be too small which could lead to anunsuccessful Assembly. For the larger rotors, the condition is the opposite, and the rotor mightmove compared to the shaft direct after the Assembly when the rotor still is warm.

Utveckling av arbetsmetod för DFA

Scania is among the leading companies in the heavy vehicle industry. Scania also assemble engines for their trucks and buses, as well as to external marine and industrial applications. Wrongly assembled parts leads to quality problems, which makes it important to secure that the Assembly is correct. To do this Design For Assembly (DFA) is used to describe how parts should become easier to assemble. Scania?s production unit for engine Assembly has had a working method for DFA in the shape of a checklist, which is not used.

Konstruktion av mutterdragare för stora moment

This degree project was conducted in collaboration with Gremo AB located in Ätran.The aim of the project was to develop a solution to secure quality and to help assemblingthe locknut holding the vertical hinge on the harvesters and foresters from Gremo.At this time the nut is assembled manually by the aid of an overhead crane. The nut istightened differently from time to time, and there was no specified torque to which it istightened. Another present problem was the locking washer which sometimes getsdamaged during Assembly, when this happens the procedure has to be started over fromthe beginning. The current Assembly procedure is very time consuming and lengthy forthe employees.Our task was to design a machine that could tighten the nut to a specified torque with amargin of error of ± 3%. The Assembly procedure will be held simple and the timerequired at a minimum.The project started by developing several principle solutions, the one solution that bestmatched our specifications were developed to a primary solution.Today we have started manufacturing and assembling our prototype.

Utveckling och utförande av frekvensstudie vid Rapid Granulator AB

The object of this examination project is to produce a method of work sampling at Rapid Granulator AB. The aim is to perform the method at the company and evaluate if it is executable. The study is delimited to the basic construction of the 45-series in the Assembly hall.Preparations to produce the method of the work sampling resulted in definitions of activities, a form and a product tree. Several days were spent studying the assembling to learn and understand the entirety.The work sampling result showed a large amount of no value adding time that was used in the assembling. Some of the activities could be reduced and we observed some problems during the Assembly process.

Analys och produktionsförbättring på monteringslinan Vensafe

This study is preformed at Westbaltic Components placed in Töcksfors Sweden. Themain target in this study is to make one of the company?s Assembly lines better andmore effective. The Assembly line constructs vending machines for different stores allover Europe.It will contain tobacco, snuff, cigarettes and shaving blades and many more similarproducts.The first step in our study is to locate the daily problems and find out a good way toreduce them and make them disappear. A good way to do this job easier was toconstruct a visualizing board.

Kostnadsbesparingar på EM7 : Omkonstruktioner för billigare tillverkning

This thesis describes how a cost reduction project was done on the Packsize ondemand packing machine EM7. The cost reduction was achieved by making minorredesigns of the EM7.The project began by studying the EM7´s structure and function by working on itsAssembly line. A short literature study on the subject Design for Manufacturing wasalso done.By working on the Assembly line and by speaking with staff from production anddevelopment departments, a number of ideas for reducing manufacturing costs arose.Estimations of the potential cost reduction size for each proposal were done incollaboration with vendors and the purchasing department. Based on the size of the cost reduction, technical risk, impact on the Assembly lineand the development time the various proposals were ranked. The two highestranked proposals were selected for further development towards finished solutions.One of the ideas that were selected to develop in to a finished solution meant thatsome of the pneumatic valves were replaced with others.

Sammanställning och produktion av ritningsunderlag till båt

Hanterbara båtar is a new company who builds alumina boats customized for people in wheelchairs. Due to the fact that the company only built two boats yet, the production documentation is not complete. The drawing that does exist is not in an exact standard which makes production planning harder.The purpose of this work has been to make the production of the boat easier and simplify further development and modification. Product development in the form of optimizing details is also one of the main purpose of this work.This is all done by making a 3D-Assembly of all the existing drawings. After this is done new drawings will be made and added to the main Assembly.

Byte av kontaktdonsgränssnitt för Scania bromssystem

This master thesis was carried out at Scania in Södertälje, Sweden. It investigates the possibility of changing a connector interface that is used when there is a need for splicing the wheel speed sensor and thereby determine the consequences.The problems that exist with the current connector interface occur during Assembly, as more time is required to complete a connection in a reliable manner. A complete connection requires joining the male and female connector, insert the connection into a protective retainer and then strap a cable tie on each end of the retainer. This process makes it more time consuming and it requires 20-30 seconds to complete the connection. Solving this problem would save time and enable easier Assembly, therefore resulting in economical benefits.This thesis was accomplished through discussions with different sections at Scania, studying available documentations, observations during Assembly, writing a requirement specification and contacting suppliers.The aforementioned methods resulted in four connector suggestions, the DT and DTMH connector from Deutsch, MCON connector from TE connectivity and MLK connector from Kostal, each of them compliant with the set demands of the surrounding environment.

Ergonomisk utvärdering och förbättring av monteringsstation

The purpose of this study was to examine and evaluate an Assembly station at Kalmar Industries in respect to ergonomics. The study was to result in an improved Assembly station with lower risk of work- related injuries. It was the study group?s expectation that the measures taken at the Assembly station can function as guidance and an inspiration for other ergonomic improvements at the company. Several goals related to the purpose were established as guidance for the study.The mechanic?s work situation was mapped through a series of methods.

Ställtidsreduktion i montering av kopplingar

VBG Produkter AB is a process-orientated company that develops, manufactures and markets trailer couplings with belonging coupling equipment, protection equipment against skidding and stands for wagon-bridge for heavy vehicles. The company feels that their set-up time in production for couplings is not at an acceptable level. Due to high demands of customer oriented production the intermediate stock level of included products within the Assembly of couplings has gradually increased which has resulted in high inventory holding costs. VBG Produkter applies Kanban in their production, therefore it is important to produce exactly the necessary amount and avoid overproduction. The objective of this project is to suggest appropriate solutions so that VBG Produkter is able to reduce their set-up time in Assembly of couplings, by identifying internal and external set-up time for the chosen process bushing cell.