Sök:

Sökresultat:

10944 Uppsatser om Work measurement - Sida 6 av 730

Svenska myndigheters användning av sociala medier : Vilka mål har myndigheterna med sitt användande av sociala medier samt hur mäter myndigheterna effekten av sitt arbete?

Swedish authorities have been dealt a mission by the Swedish state, where each agency works on the basis of their assignment. Communication has become more and more important for authorities, there are several reasons for the use of communication and they may differ from authority to authority. Some authorities claim that the purpose of the communication work is to create awareness and recognition among citizens. A communication form that has become increasingly important for government agencies is social media, according to the government authorities should implement social media in their communication work because it is very important that the authorities are available where the citizens are. Previous research has focused on the risks and opportunities that the social media generates for the public sector.

Att vårda en närstående i hemmet vidlivets slut : En livsberikande erfarenhet?

Background: Peripheral arterial disease (PAD), as a consequence of atherosclerosis in the arteria of the limbs, affects one of ten Swedes older than 65. PAD can develop slowly and silently, and involves an increased risk for cardiac infarction and stroke. Measurement of the patient´s ankle blood pressure and calculation of the ankle-brachial index is an evidence-based method to discover PAD. Objective: To investigate how district nurses and general practitioners perceive this method of examination and experience possible obstacles to why it is not more commonly applied at primary health care centres. Method: Data collected by semi-structured interviews have been processed by qualitative content analysis with a manifest onset.

Definition av stötdämpares fyllnadsgrad

Shock absorber units play a key role in establishing the driving dynamics and performance of automobiles. Öhlins Racing has manufactured high-tech automotive shock absorbers for over 30 years. Öhlins Racing?s advanced technology has contributed to over 200 world championships in automobile racing. Öhlin?s manufacturing process has long utilized automated fluid filling equipment during the final shock absorber unit assembly stage. The filling process consists of vacuum pumping the shock absorber unit and subsequent transfer of fluid. Vacuum pumping is necessary to remove residual air from the shock absorber unit prior to initiating the liquid filling stage. The presence of undesirable gases drastically compromises the performance of a shock absorber. The filling degree, defined as the final ratio of air to oil, is determined by the specific filling protocol as well as the specific equipment utilized.The current investigation aims to develop a viable technique to accurately determine residual air content in shock absorber units. If the filling degree can be appropriately quantified for a specific manufacturing process, then the air/oil ratio may be quantitatively related to shock absorber performance. The utilized measurement method must be completely integrated into the manufacturing process to guarantee shock absorber performance specifications according to the manufacturer?s standards. By utilizing the measurement method developed in this work, the manufacturing process, manufacturing equipment and product specifications can all be tailored to provide improved filling conditions.The developed measurement method provides accurate quantification of the filling degree under a wide range of processing conditions. The method establishes the relative quantity of air in the shock absorber unit by performing in-situ compressibility tests. The fill ratio can be controlled and varied by manipulating the vacuum pressure exerted during the filling process. Performance tests, however, indicate no correlation between filling degree and unit performance..

Från myt till Ptolemaios: Geografin under antiken

This paper deals with the development of scientific geography during Antiquity from its mythical background before the seventh century BC to Claudius Ptolemy during the second century AD. The main focus is on questions concerning the shape of the earth, its place in the universe, size and mapping of the earth. Already before 400 BC, the idea of the earth as a globe was firmly estabished. During classical time, Aristotle used empirical and rational arguments to prove that the earth was a sphere and that it was situated motionless in the center of the universe. In the third century BC, the first reasonably correct measurements of the circumference of the earth was carried out by Eratosthenes.

Konstruktion av förstärkare och insamplingssteg till en PSAADC i 0.25 um CMOS

The aim and goal of this work has been to design and implement a voltage reference network for a 12-bit PSAADC, Parallell Successive Analog to Digital Converter. A chip containing the design has been sent away for fabrication. Because of the long processing time, no measurement data are presented. The main specifications for the voltage reference generator is to generate stable reference voltages with low noise and a good PSRR. Efforts has also been made to minimize the power consumption..

Verkligt värde i praktiken : En studie av tillförlitligheten vid fastighetsvärdering till verkligt värde

The ongoing harmonization process aims to incorporate IFRS regulations into the Swedish accounting. As a consequence investment property?s starting from 2005 may be valued using the fair value method, in accordance to IAS 40. This involves major changes for listed property enterprises that from now on can value a large extent of their assets to fair value. All parties don?t appreciate this progress, opponents to fair value have expressed great concern that fair value don?t work in practice.

Identifiering av parametrar för tillståndsbedömning av en vattenkraftstation

The report begins with a general inventory of possible technical faults in a hydropower plant and of possible fault indicating measurements. Then an investigation is made concerning a few different faults. Based on this investigation a choice on seal box condition and water leakage is made as problem for a more thorough examination, in which it is concluded that the turbine water leakage is larger when the turbine is put into operation. The examination ultimately results in a computer alarm for faults related to the seal box. Finally a few things are mentioned about flow measurement and pressure measurement in relation to the project as a whole..

Modellering och styrning av flis till en sulfatkokare

At the Skoghall pappermill, sulphatepaper pulp is produced in a continuous digester originally from 1969. To be able to maintain a high level of production there is a need for a process with few disturbances. Variations in how well the wooden chips are packed in the digester is one form of disturbance. Today there are no available measurements on how well the chips are packed. Instead this is regarded as being constant.

En jämförelse mellan TLS och UAV-fotogrammetri : Inmätning av hårdgjorda ytor

At present day there are several different methods for measuring of paved surfaces.The most common methods today are measuring with a total station, the GlobalNavigation Satellite System (GNSS) and terrestrial laser scanning (TLS). Recently thedevelopment of unmanned aerial vehicles, known as drones, has increasedexponentially and today there are several ways of using drones for measuring surfacesby photographing and laser scanning.This thesis contains a comparison between the methods terrestrial laser scanning(TLS), and unmanned aerial vehicle photogrammetry (UAV). The measurements havebeen applied on two different test surfaces, one of asphalt and one of gravel. Thepurpose of the comparison is to investigate whether the airborne photogrammetry isequivalent accurate in its height levels as the terrestrial laser scanning. For thecomparison to be more extensive, these two methods have not only been comparedin precision but also in the areas of ease of use and economy.The precision was analyzed by comparing the height levels in randomly placed controlpoints on the test surfaces.

Konfigurering av slutartider för ljusdetekterande mjukvara

This project measures the upper bound of exposure time for laser reflection detection in the software DotDetector. Via measurement of the exposure time for which distortion happens in a room lit with everyday light we conclude that the upper bound for exposure times are 100 milliseconds. This value does not change as long as the lighting in the room is the same. As future work this project proposes variable upper bounds depending on secondary lighting in the room. Also we propose automating the colour masking of the detection algorithm..

En studie av skillnader mellan monotisk och dikotisk 40 Hz Auditory Steady-State Response

ObjectiveThe objective of this study was to investigate differences between monotich and dichotic 40 Hz Auditory Steady-State Response (ASSR) with Interacoustics Eclipse.DesignThe aspects studied are test duration, relation be¬tween ASSR and behavioural thresholds (BT), reproducibility and correlation between rejects during Brainstem Response Audiometry (BRA) and differences between ASSR and BT. Monotic and dichotic ASSR-thresholds for eight normal hearing subjects (.

Konstruktion av elektrolytisk ozongenerator

The work has been carried out in cooperation with the company Zenit Design in Malmö. The project's goal was to restore, improve and produce an ozone generator. During the project, the authors sought relevant literature in databases, been in contact with US suppliers of fuel cell membranes, Asian suppliers for the processing of Teflon and Titanium parts in mechanical engineering and Swedish suppliers of various standard components. The authors had access to a temporary lab at Zenit and electron microscope at Halmstad University where material tests were performed. The authors have also had access to measurement equipment to measure amounts of ozone.During the work, the authors have mapped how an existing ozone generator works and then have their own development.

Metod för att bestämma drifttid

The usage time is an important part of the specification for products powered bybatteries. The usage time is affected by a number of different elements; technical,environmental and how the product is being used. The method to determine theusage time is intended to define how measurements and calculations are to berealized along with influencing factors to keep in mind. With support from thismethod the intention is to gain control on how well the established usage time canbe expected to cohere with the real value and what affects the value.The study is done specifically for hearing protectors with battery powered built inelectronically functions. The functions can be level dependent function forambient hearing, 2-way radio communication, Bluetooth or FM-radio.The first chapter of the report describes the literature study performed in theproject.

Oäkta Goodwill: Den oäkta goodwilldelens effekt på nedskrivningar av koncerngoodwill

Since January 2005 new rules have been introduced from the International Financial Reporting Standards for accounting of Business Combinations. Goodwill, which is the difference between the purchase price and the value of the net assets in an acquired firm, should no longer be amortized but should instead be treated as an object for yearly impairment tests. Nevertheless, there are many companies making the tests but not impairing goodwill. The theoretical frame of reference looks at goodwill from its two parts; true goodwill and false goodwill. False goodwill is defined as a measurement bias and constitutes a certain percentage of the operating net assets.

Tidssynkroniserade mätningar i vattenkraftstationer

Vattenfall and Svenska Kraftnät perform start-up tests, where hydropower generators are used to power up the electrical grid in case of a blackout. To monitor the electrical grid, Phasor Measurement Units (PMU) are used. Each PMU is individually equipped with a GPS-receiver to precisely timestamp the data relative to the official time UTC. During the test, it is also of interest to timestamp the measurement signals from individual hydropower generators to later compare with PMU-data, and thus study the power grids impact on the generator. The aim is to work out an appropriate method to make these measurements and to build a data acquisition system, capable of timestamp data relative to UTC, from a generator in one of Vattenfalls hydroelectric power stations. The problem is that the generator is located in an underground station which hampers the reception of GPS-signals and wiring should be avoided if possible. Time synchronization has been solved by using Vattenfalls network, which is synchronized by the network protocol NTP.

<- Föregående sida 6 Nästa sida ->