Sökresultat:
2967 Uppsatser om Wind power station - Sida 6 av 198
Projektering av vindkraftspark i Juddhult, Småland
The aim with this study was to collect fundamental information, and to plan, a windpower farm in Juddhult , Småland in southern Sweden. The goal is to collect the bestavailable projecting planning support. The pieces of this projecting planning supportthat will be presented is; Environmental Consequence Description (MKB), productioncalculations, comparisons between different plant types, economic calculations, evaluatethe economy and give some farm design suggestions. The imagined wind farm will belocated in forest environment and which may cause a number of new problems. Specialinterest that will be affected, where special consideration because of the forestenvironmental is requested is, hunting, wetlands, ancient monuments and windturbulence.
Självförsörjande elgenerering : Kan Orust bli självförsörjande på förnybar el?
Orust Kretsloppsakademi is a nonprofit organisation, with a goal of annually generate the same amount of electrical energy that is consumed. Orust is an island on the west coast of Sweden, north of Gothenburg. The population of 15 000 reaches 40 000 during summer, due to the large amount of vacationer. The total electricity demand is 174 GWh a year with a maximum power need of 32 MW. This report presents an analysis for the plausibility of their plan and from a power system stability perspective, the effects on the electrical grid.The conclusion is that the restraints for development of power generation from wind, solar and wave generation, are the power systems capability to transfer power, primarily in the transformers of the grid.
Vindkraft: en undersökning av fem europeiska länders vindkraftutveckling och faktorer som kan påverka den
En del länder väljer att investera och utveckla vindkraftmarknaden mycket, medan en del länder väljer att inte göra det. I Europa startade vindkraftutvecklingen under 1970-talet. Efter en trög start är den europeiska vindkraftutvecklingen nu marknadsledande och fortsätter att expandera i hög takt. Tyskland har den högsta installerade kapaciteten av vindkraft i världen, och Danmark har den högsta installerade kapaciteten per capita. Dessa länder, samt Spanien, Sverige och Storbritannien har alla satt nationella mål för utvecklingen av vindkraften.
Stormskador i stickvägsgallrade bestånd i sydvästra Sverige :
A storm in January 2005 felled 75 millions cubic metres of forest in South Sweden. Previous studies of wind damage in thinned stands indicated the importance of early thinnings. The risks of wind throw increased by increasing age and height of the stands. Previous studies also indicated increasing risk of wind throw along the strip roads. The aim of the present study was to investigate wind damage in Norway spruce stands in South Sweden in relation to time of the first thinning and different pattern of strip roads (width, length and direction).
Vindkraftverk av UHPC 2.2 : En undersökning av högpresterande betong med syntetfiberarmeringen STRUX
Användandet av betong som ersättare för stål vid produktionen av vindkraftverkstorn har ökat den senaste tiden. Betongtorn är betydligt billigare än ståltorn men problem som sprickbildningar, frostsprängningar och följaktligen armeringskorrosion har uppstått bl a på grund av vibrationer från rotorn. I fundamentet i vindkraftverk kan ovan nämnda problem också uppstå och det uppfyller således inte alltid funktionskraven. Det här examensarbetet undersöker möjligheten att eliminera dessa problem genom att använda en sorts högpresterande betong kallad UHPC 2.2 med syntetfiberarmeringen, STRUX. Jämförelser mellan tidigare empiri om högpresterande betong och laborativa tester på UHPC 2.2 visar att den senare är beständigare och ger möjligheter till en större sprickfrihet.
Webbradion : ett nytt medium
The purpose of this essay is to study the role of web radio in Sweden. To fulfill the purpose we have done a case study of two Swedish radio stations: Sveriges Radio AB, which is a public service station, and a commercial station called Mix Megapol. By interviewing two persons from each station and analyzing the contents of their web sites, we have tried to see how the relationship between radio, Internet and web radio looks like. Thus, our method is qualitative. We have come to many conclusion of which some are: The new medium web radio borrows qualities from the traditional radio.
Vindkraftsetablering i skog
This thesis assignment at C-level is focused on calculation models and prediction methodswhish can be used in the stage we call ?prospecting? of possible windmill locations. Thelocation is southeast of Halmstad at the Farm ?Stjernarpsgods?. The rapport has two mainareas directed towards this task.
Skogsbolagens syn på vindskadeförebyggande åtgärder efter stormen Dagmar
On the night of the 26th December 2011, large parts of southern Norrland were struck by the storm ?Dagmar? that caused serious damage to the forests. In the past 10 years wind damage has become a hot topic after several major storms. Forest companies own 25% of the Swedish forest and thus influenced largely by wind damage. The main purpose of this study was to examine whether forest companies attitude towards preventive wind damage actions were changed after the storm ?Dagmar?.
The result was developed by doing interviews with two forestry companies.
Störs laxens lekvandring i en kraftverkspåverkad älvsträcka? :
The upstream spawning migration of Atlantic salmon (Salmo salar) at the confluence
area between the power-station outlet and the bypass-channel in river Umeälven (flow 430
m3s-1) was compared in 2004 and 2005, two years with different experimental flow-regimes.
In 2004 the water flow in the bypass-channel was altered during the day with increased
flows during the nights while the water flow in 2005 mainly was altered between the
weekdays and weekends. Salmon showed altered migratory behaviour in this confluence
area, assessed with telemetry (n=116) and echo-sounding, with up- or downstream responses
depending on flow-changes in both the bypass and the power station outlet. Increased
turbine flow through the power-station generally attracted salmon into the tunnel outlet area
while increased spill-flows facilitated salmon to enter the bypass. Echo-sounding in the
confluence area showed an increased swimming activity up- and downstream due to time in
the day and flow-rates through the tunnel outlet. No changes in activity could be detected
due to increasing or decreasing flow through the hydro-power facility.
Tidssynkroniserade mätningar i vattenkraftstationer
Vattenfall and Svenska Kraftnät perform start-up tests, where hydropower generators are used to power up the electrical grid in case of a blackout. To monitor the electrical grid, Phasor Measurement Units (PMU) are used. Each PMU is individually equipped with a GPS-receiver to precisely timestamp the data relative to the official time UTC. During the test, it is also of interest to timestamp the measurement signals from individual hydropower generators to later compare with PMU-data, and thus study the power grids impact on the generator. The aim is to work out an appropriate method to make these measurements and to build a data acquisition system, capable of timestamp data relative to UTC, from a generator in one of Vattenfalls hydroelectric power stations. The problem is that the generator is located in an underground station which hampers the reception of GPS-signals and wiring should be avoided if possible. Time synchronization has been solved by using Vattenfalls network, which is synchronized by the network protocol NTP.
Småskalig vattenkraft vid Olofsfors bruksmuseum : Med faunapassage
In Sweden there are 1894 small-scale hydropower plants in operation, which together generate 4.3 TWh of electricity per year according to Swedish hydropower compound (SVKF, 2011). This corresponds to the annual consumption of about 860,000 Swedish households (based on an annual consumption of 5000 kWh). In the mid-1950s there were around 4000 small-scale hydropower plants in operation in Sweden before cheap fossil fuels and uranium competed with them, in the current situation only 1,894 of these are in use. If slumbering small hydropower plants once again would be taken into use and some new ones are built, we would be able to extract about 7 TWh of renewable electricity from these annually in Sweden, representing about 1.4 million households.The thesis intends to calculate and construct a hydroelectric power plant at the existing dam in Olofsfors and give suggestions on how the power station should run during the time that fish migration is greatest in Leduån.The turbine and generator to the station in Leduån at Olofsfors is designed by the height of the fall and the water flow through the dam. The turbine selected for the station is a CK-1000RM turbine with a 4-pole 250 kW generator from Cargo & power turbine Sweden AB, which is expected to deliver 1.2 GWh per year.
FEM-analyser av rörstödskonstruktioner
Målet med detta examensarbete, utfört på uppdrag av Vectura Consulting AB, har varit att undersöka möjligheten att ansluta en vindkraftpark till järnvägens kontaktledningsnät. Möjligheten att koppla om vindkraftparken till järnvägens hjälpkraftnät, som bland annat förser växelvärmare och signalsystem med effekt, har också undersökts. Eftersom kontaktledningsnätet och hjälpkraftnätet arbetar med olika frekvenser och spänningar, 16? Hz och 15 kV respektive 50 Hz och 22 kV, måste därför en komplett krets för frekvensomvandling, spänningsomvandling och omkoppling tas fram. Projektet har begränsats till en del av Botniabanan, sträckan Örnsköldsvik-Nordmaling.I denna rapport har trafikfrekvensen på den valda sträckan på Botniabanan undersökts för att bestämma en genererad effekt till inkopplingspunkten, samt för att undersöka när det kan vara lämpligt att koppla om till hjälpkraftnätet.
Utveckling av tyngdlyftningsklove
Målet med detta examensarbete, utfört på uppdrag av Vectura Consulting AB, har varit att undersöka möjligheten att ansluta en vindkraftpark till järnvägens kontaktledningsnät. Möjligheten att koppla om vindkraftparken till järnvägens hjälpkraftnät, som bland annat förser växelvärmare och signalsystem med effekt, har också undersökts. Eftersom kontaktledningsnätet och hjälpkraftnätet arbetar med olika frekvenser och spänningar, 16? Hz och 15 kV respektive 50 Hz och 22 kV, måste därför en komplett krets för frekvensomvandling, spänningsomvandling och omkoppling tas fram. Projektet har begränsats till en del av Botniabanan, sträckan Örnsköldsvik-Nordmaling.I denna rapport har trafikfrekvensen på den valda sträckan på Botniabanan undersökts för att bestämma en genererad effekt till inkopplingspunkten, samt för att undersöka när det kan vara lämpligt att koppla om till hjälpkraftnätet.
Konstruktion av etikettapplikator
Målet med detta examensarbete, utfört på uppdrag av Vectura Consulting AB, har varit att undersöka möjligheten att ansluta en vindkraftpark till järnvägens kontaktledningsnät. Möjligheten att koppla om vindkraftparken till järnvägens hjälpkraftnät, som bland annat förser växelvärmare och signalsystem med effekt, har också undersökts. Eftersom kontaktledningsnätet och hjälpkraftnätet arbetar med olika frekvenser och spänningar, 16? Hz och 15 kV respektive 50 Hz och 22 kV, måste därför en komplett krets för frekvensomvandling, spänningsomvandling och omkoppling tas fram. Projektet har begränsats till en del av Botniabanan, sträckan Örnsköldsvik-Nordmaling.I denna rapport har trafikfrekvensen på den valda sträckan på Botniabanan undersökts för att bestämma en genererad effekt till inkopplingspunkten, samt för att undersöka när det kan vara lämpligt att koppla om till hjälpkraftnätet.
Konstruktion av Batchblandarplattform
Målet med detta examensarbete, utfört på uppdrag av Vectura Consulting AB, har varit att undersöka möjligheten att ansluta en vindkraftpark till järnvägens kontaktledningsnät. Möjligheten att koppla om vindkraftparken till järnvägens hjälpkraftnät, som bland annat förser växelvärmare och signalsystem med effekt, har också undersökts. Eftersom kontaktledningsnätet och hjälpkraftnätet arbetar med olika frekvenser och spänningar, 16? Hz och 15 kV respektive 50 Hz och 22 kV, måste därför en komplett krets för frekvensomvandling, spänningsomvandling och omkoppling tas fram. Projektet har begränsats till en del av Botniabanan, sträckan Örnsköldsvik-Nordmaling.I denna rapport har trafikfrekvensen på den valda sträckan på Botniabanan undersökts för att bestämma en genererad effekt till inkopplingspunkten, samt för att undersöka när det kan vara lämpligt att koppla om till hjälpkraftnätet.