Sökresultat:
807 Uppsatser om Wind measurement - Sida 16 av 54
Energiförbrukning för putsade, odränerade träregelväggar i fuktigt respektive torrt tillstånd
In recent years, moisture damages have been noticed in rendered, undrained stud walls. The design is built on the principle one-stage tightening which means that there is no air gap in the construction. The damages have occurred when water has permeated through the rendering in leaking connections and fittings for windows, doors, canopies, balconies, terraces and awnings. Behind the plaster carrier, which consists of either polystyrene or rigid mineral wool, plasterboard has often been used as a wind protection barrier. In many cases the wind protection barrier and the underlying wooden studs have been exposed to mould and in some cases even rot.
Användning av nyckeltal, Key performance indicators, som underlag till resurseffektivisering av produktion
Mattias MogardGustav von HeijneSammanfattningFör framgångsrika företag är det essentiellt att ha kontroll över sina resurser. Studien tar upp ett ämne som handlar om att skapa en överblick och en medvetenhet om resurseffektivitet inom ett företags produktion.Performance measurement är ett tillvägagångssätt för att kvantifiera aktiviteterna inom en produktion. Data struktureras genom nyckeltal, Key performance indicators (KPI:er), till övergriplig och användbar information. ISO 22400 är en uppsättning standardiserade nyckeltal med ändamålet att appliceras på automatiserad produktion. Studiens syfte är hitta vilka av nyckeltalen från ISO 22400 som är lämpliga att använda vid mätningen av en helt automatiserad produktionskedja som tillverkar motorblock.
Verkligt värde i praktiken : En studie av tillförlitligheten vid fastighetsvärdering till verkligt värde
The ongoing harmonization process aims to incorporate IFRS regulations into the Swedish accounting. As a consequence investment property?s starting from 2005 may be valued using the fair value method, in accordance to IAS 40. This involves major changes for listed property enterprises that from now on can value a large extent of their assets to fair value. All parties don?t appreciate this progress, opponents to fair value have expressed great concern that fair value don?t work in practice.
Fortsatt gran eller självföryngrad björk efter stormfällning? : en ekonomisk analys
The southern part of Sweden, Skåne, is frequently exposed to storms causing great damage to Norway spruce (Picea abies L. Karst.) stands. A storm during the winter 1999/2000 raised the attention of the problem. A lot of forest owners got large areas of spruce stands wind thrown during this storm. Can naturally regenerated birch (Betula sp.) be an alternative on these wind-exposed sites? This was the main question I was facing when discussilig the problems with Esben Möller Madsen, Söderåsens forest district.
The aim of this master thesis was to present an economic analysis of Norway spruce versus
birch.
Mjukvaruplattform för riggstyrning
Today the competition in the automobile industry is getting all tougher. The technology behind cars becomes more advanced. To get ahead of competitors car companies has to look into new areas of innovation.One important area is vehicle safety. Bigger companies have come so far in vehicle safety that difference between cars more depends on the car type (size) than the technology behind it.There is one area where vehicle safety that still has great opportunities for improvement, which is in active safety. The term active safety states that the car has the ability to identify treats and automatically respond to the treats.
Stärkelsers funktion som konsistensgivare vid olika temperaturer i pulversoppa : en experimentell kvantitativ studie
More often consumers demand instant dry soup that can be prepared with a water temperature below 100o C, which is currently not possible, because the dry soup becomes too thin when using water with a lower temperature. In this study, various kinds of starch studies were made to optimize the starch used in the existing product to make it more viscous at both high and low temperatures. The result was that one of the two starches present in the existing product was retained by change in quantity as it contributed to important flavor parameters. The second was removed and replaced with a starch that made the product more viscous at lower temperatures. To find out if the new product differed from the existing product a viscosity measurement and a sensory paired preference test were made.
Radiologiska tecken vid lungödem hos hund och katt :
Williams, E. 2003 Radiologic sign of lung oedema in the dog and cat.
To determine if the descriptions of lung oedema in the literature accurately describe the presence and frequency of radiologic signs, thoracic radiographs of 55 dogs with mitral regurgitation due to endocardiosis (ME), 46 dogs with dilated cardiomyopathy (DCM), 9 dogs with hunting oedema, and 20 cats with hypertrophic cardiomyopathy (HCM) were analysed. The location, type (diffuse or patchy, without or with air bronchograms) and presence of pleural oedema, bronchial wall thickening, widened pulmonary veins, and heart enlargement with subjectively and by the VHS measurement, were determined, and analysed by chi squared test with respect to disease. The dogs nearly always had diffuse oedema, whereas 35% of the cats had a patchy pattern, which agreed with the literature. The common occurrence of cranioventral and caudioventral oedema in heart failure was not described.
Lagringsmätning för AD-information
Målet med detta projekt var att hjälpa IT-Mästaren att kunna fakturera sina kunder på ett smidigare sätt. Deras dåvarande lösning av kundernas dataanvändning var tidskrävande och ineffektivt, därför ville de automatisera systemet. Det nya systemet skulle användas för att administrera kundernas servrar med hjälp av ett grafiskt gränssnitt och sedan kontakta dem för att få fram olika värden för respektive kund som ska presenteras på IT-Mästarens hemsida. På så sätt skulle de kunna fakturera sina kunder på ett mer effektivt sätt och även få bättre överblick av kundernas användning. I och med utvecklingen utav detta system så fördjupande jag mig dels i egna kända områden men jag lärde mig också nya kunskaper. Det gällde inte enbart teknisk utveckling utan också undersökning av exempelvis hämtningen av alla data som skulle göras.
Tidssynkroniserade mätningar i vattenkraftstationer
Vattenfall and Svenska Kraftnät perform start-up tests, where hydropower generators are used to power up the electrical grid in case of a blackout. To monitor the electrical grid, Phasor Measurement Units (PMU) are used. Each PMU is individually equipped with a GPS-receiver to precisely timestamp the data relative to the official time UTC. During the test, it is also of interest to timestamp the measurement signals from individual hydropower generators to later compare with PMU-data, and thus study the power grids impact on the generator. The aim is to work out an appropriate method to make these measurements and to build a data acquisition system, capable of timestamp data relative to UTC, from a generator in one of Vattenfalls hydroelectric power stations. The problem is that the generator is located in an underground station which hampers the reception of GPS-signals and wiring should be avoided if possible. Time synchronization has been solved by using Vattenfalls network, which is synchronized by the network protocol NTP.
Verifiering av beräknad energiprestanda för flerbostadshus byggda år 2007-2009
The building industry consumes approximately 40 % of the total energy consumption in Sweden, where the using stage is dominating with 80 %. There is a lot of work in progress to reduce energy use in the building industry, and the demands from authorities regarding energy use increases. As a part of this work Building and planning department of Sweden has established a requirement that has been applied since 2006, and restricts a maximum energy use for buildings.The requirement includes that an energy simulation must be done in advance to demonstrate that it is possible to meet the demands.Reality is however more complex than an energy simulation program, that frequently underestimates the energy use of buildings. The purpose of this thesisis to study and analyse deviations between estimated and actual energy use in modern apartment buildings. The study includes four apartment buildings in Stockholm, Gothenburg and Jönköping that were built in 2007-2009.
Nollenergihus i Borlänge : Är det möjligt med biomassa, solenergi och vindkraft?
This report is of technical character and treats how to plan a small building in Borlänge, Sweden.The technical components that have been treated in the report are the construction, foundation,installations and thermic abilities of the house. In addition to planning this house the report alsocontains a part that deepens in net zero energy buildings. The purpose of the report is toinvestigate if the house in Borlänge can be constructed to meet net zero energy buildingdemands.Energy efficient houses such as passive- and net zero energy houses are showing more frequenton the market in Sweden. Ongoing climate changes and growing consciousness about theenvironment in society have contributed to that the environment is a well discussed topic. Toconsume small amounts of energy and at the same time produce local energy is thereforesomething that lies in the future and future houses.
En studie av sex ISA-system
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Undersökning och framtagning av ett moduluppbyggt datainsamlingssystem
This report is about a thesis that is performed in and for SYSteam Engineering AB in Motala. The thesis work is divided into three parts, study of the market, programming and electronics. The study part consists of examining and comparing different data acquisition systems for testing of different circuit boards, taking into account the modularity, real-time applications, mobility, environmental, interface hardware and software, to be able to define a general module-based data acquisition system in both hardware and software that enables for future developments.The programming part consists of getting started with Visual Studio, which integrates the Measurement Studio for C#. NET. Measurement Studio includes classes and user controls for testing and measuring and offers tools for acquisition, analysis and presentation of real world data.
Mätramar för vederlagsmätning och timmersortering på sågverk
The measuring of logs is important in the sawmills process to the sawn products. The technology of automatic wood measurement is continuance developing. This study has the purpose to see how the different techniques and the routines works of measure frames for determining of wood value and sorting in sawmills. The study is performed as a literature study and a survey. The survey includes some of the Swedish sawmills that produce more than 10 000 cubic meters sawed products per year.
Dynamisk simulering av avfallskraftvärmeverk
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.