Sökresultat:
367 Uppsatser om Wind erosion - Sida 4 av 25
Utvärdering av konsekvenserna för nätanslutning av vindkraftparker i Sverige vid införandet av nätkoden Requirements for Generators
Grid codes are becoming more demanding on power generating units due to the factthat the complexity of the power grid is increasing. The penetration of wind powerhas grown over the last years and it is clear that wind farms need to be addressedwith the same type of grid codes as conventional generation units. There is howeveran undeniable difference between the technology in conventional synchronousgeneration units, and the asynchronous generation units in wind farms.This thesis has reviewed the current grid code in Sweden and compared it to the newcode proposed by ENTSO-E, ?the Requirements for Generators?, in the aspect ofwind farms with an installed power of 30 MW or more. The comparison has beencomplemented by an analysis of how wind farms of two different technologies(Doubly fed induction generators and full power converters) can meet therequirements and technical proposals have been given on how to be able to meetcompliance with the new grid codes.The Requirements for Generators contains many non-exhaustive and optionalrequirements, because of this it has been difficult to, at this stage, exactly point outthe technical impact on the grid connection of future wind farms in Sweden.
Supermarket Strategies : Kvalitativ studie av Ica Maxi, Coop Forum och Citygross konkurrensstrategier
This thesis investigates if a system for small scale electricity production located in anurban environment can be profitable. The work has been divided up into two parts,one extensive literature study and one case study. The purpose of the literature studywas to investigate the area, resulting in a choice of which technology to be studied indepth in a case study.In the case study a system containing small scale wind turbines and photovoltaicsmounted on Gränby Centrums roof was examined. From data containing wind power,wind direction and total irradiation, possible production from a system weresimulated. Three products of each technology were examined in the simulations.From the simulated production an economic analysis was carried out, this toinvestigate if a system is profitable.
VINDKRAFTSETABLERINGAR : EN JÄMFÖRANDE STUDIE OM NÄRBOENDES INSTÄLLNING TILL VINDKRAFT OCH VINDKRAFTSETABLERINGAR I SVERIGE OCH BRASILIEN
To achieve a sustainable development, three aspects have to take equal place in the society; environmental, economical and social. To reduce the impact on the environment and the amount of greenhouse gases supplied to the atmosphere, industrialized countries and less developed countries must start cooperating. Also the use of renewable energy sources, like solar, hydro and wind power, have to increase.Wind power has great potential as a future energy supply. It is cost efficient, quickly developed and the resource is abundant and available worldwide.Examinations made in Sweden, indicates that there are difficulties establishing wind power at the same pace as the environmental goals, set by the Swedish government, requires. Mainly because people living nearby potential areas for wind power farms, appeal against the decision.This study aims to investigate differences between how people in Sweden and Brazil look at wind power as a future energy source and at the establishing process.
Tillförlitlighet hos trafikolycksklassificering
Today?s wind power plants are only compensated for their reactive power consumption at no-load. As the wind power plants grow bigger the amount of reactive power they need also increases. This is no longer a problem that can be ignored, especially as the net owners are beginning to charge the reactive power they transport.In this thesis a couple of different methods of compensation and their prices will be discussed and evaluated. Problems, such as self-excitation, that can occur if one fully compensates the wind power plant will also be brought to surface.
Undervattensvågbrytare - En modellstudie
Today?s wind power plants are only compensated for their reactive power consumption at no-load. As the wind power plants grow bigger the amount of reactive power they need also increases. This is no longer a problem that can be ignored, especially as the net owners are beginning to charge the reactive power they transport.In this thesis a couple of different methods of compensation and their prices will be discussed and evaluated. Problems, such as self-excitation, that can occur if one fully compensates the wind power plant will also be brought to surface.
Erosionsskador hos barn och ungdomar
Aim: The aim of this study was to examine and explain the various methods available to rate the erosion damage, and on which teeth and tooth surfaces of erosion damage mostly occurs in children and adolescents.Method: A literature review was conducted, based on 15 scientific articles that have been reviewed, evaluated and analyzed. Articles were searched for in the database PubMed.Result: Six of the articles used the TWI (tooth wear index), which is an index to diagnose the tooth wear in the primary and permanent dentition. Eight articles used other indices as they considered that the TWI was not sufficiently developed to register the degree of tooth wear on some teeth. Tooth wear in the primary dentition occurs most often in the canines and incisors. Tooth wear in the permanent dentition was found in the literature to be mostly occurring on the occlusal / incisal surfaces of all teeth and tooth surfaces.LyssnaConclusion: There is no common index in the articles but many of them use the TWI.
VSM och 16 förluster
With background in the rapidly growing need to find solutions for sustainable energy production and the increasing interest for wind power, this report was written. With take-off point from the wind power plant Big Glenn, which has been built in the harbour of Gothenburg, a model of the adjacent power grid has been created in Simulink/SimPowerSystems. Parameters for the power grid and its components has been provided by Göteborg Energi Nät, that has also been the supplier of measurement data of produced power, the power need from loads in the vicinity, voltage levels, current values and also the variation of power factor at the wind power plant.The SimPowerSystems model has been used to perform simulations of power flow in the grid. These simulated values have then been compared to the measured values to verify the functionality of the model. Further, the model has been used to perform simulations of a grid fault, which causes a voltage drop.
Kompensering av reaktiv effekt vid vindkraftverk
Today?s wind power plants are only compensated for their reactive power consumption at no-load. As the wind power plants grow bigger the amount of reactive power they need also increases. This is no longer a problem that can be ignored, especially as the net owners are beginning to charge the reactive power they transport.In this thesis a couple of different methods of compensation and their prices will be discussed and evaluated. Problems, such as self-excitation, that can occur if one fully compensates the wind power plant will also be brought to surface.
Simulering av vindkraftverk och närliggande elnät vid Risholmen i Göteborg i SimPowerSystems
With background in the rapidly growing need to find solutions for sustainable energy production and the increasing interest for wind power, this report was written. With take-off point from the wind power plant Big Glenn, which has been built in the harbour of Gothenburg, a model of the adjacent power grid has been created in Simulink/SimPowerSystems. Parameters for the power grid and its components has been provided by Göteborg Energi Nät, that has also been the supplier of measurement data of produced power, the power need from loads in the vicinity, voltage levels, current values and also the variation of power factor at the wind power plant.The SimPowerSystems model has been used to perform simulations of power flow in the grid. These simulated values have then been compared to the measured values to verify the functionality of the model. Further, the model has been used to perform simulations of a grid fault, which causes a voltage drop.
Identifiering av områden med risk för fosforförluster genom ytavrinning : metodutveckling med GIS
The eutrophication of lakes and seas with the algal bloom and deficiency inoxygen that follow, has been given priority by the Swedish government as oneof 16 environmental objectives. The purpose of this project was to develop a toolbased on a simple model, limited amount of data and geographic informationsystem (GIS) to identify areas with risk for phosphorus losses due to surfacerunoff. This tool can act as a decision support to decide where appropriatemeasures should be applied with the aim of reducing phosphorus losses and bythat the eutrophication.The method that has been used is a combination of two models, one calculatingthe potential erosion while the other one identifies areas of erosion (net erosion)or deposition. This ability is of great importance because potential erosionshould be calculated on areas with net erosion. Areas with high potential erosionhave an increased risk for phosphorus losses due to surface runoff.The potential erosion was calculated based on factors which describe how topography(LS), land use (C), soil type (K) and precipitation (R) effect the erosion.All of them have been modified to a greater or lesser extent.
Testplattform för nätverks-RTK i syfte att ge en rikstäckande GPS-tjänst med centimeternoggrannhet
Today?s wind power plants are only compensated for their reactive power consumption at no-load. As the wind power plants grow bigger the amount of reactive power they need also increases. This is no longer a problem that can be ignored, especially as the net owners are beginning to charge the reactive power they transport.In this thesis a couple of different methods of compensation and their prices will be discussed and evaluated. Problems, such as self-excitation, that can occur if one fully compensates the wind power plant will also be brought to surface.
Trafiken till Göteborgs södra skärgård - En annorlunda kollektivtrafik
Today?s wind power plants are only compensated for their reactive power consumption at no-load. As the wind power plants grow bigger the amount of reactive power they need also increases. This is no longer a problem that can be ignored, especially as the net owners are beginning to charge the reactive power they transport.In this thesis a couple of different methods of compensation and their prices will be discussed and evaluated. Problems, such as self-excitation, that can occur if one fully compensates the wind power plant will also be brought to surface.
Rostfritt stål som ett alternativt material till koppar i tappvattenledningar för bostäder
Today?s wind power plants are only compensated for their reactive power consumption at no-load. As the wind power plants grow bigger the amount of reactive power they need also increases. This is no longer a problem that can be ignored, especially as the net owners are beginning to charge the reactive power they transport.In this thesis a couple of different methods of compensation and their prices will be discussed and evaluated. Problems, such as self-excitation, that can occur if one fully compensates the wind power plant will also be brought to surface.
Vindkraft eller kärnkraft - En jämförelse
The scope of this project is to make a comparison of costs associated with wind and nuclear power in order to decide which one of these is the most suitable in the case of an increased demand for electricity. It is also investigated if there are other factors that can influence the choice of energy source.An average cost is calculated in terms of kronor per kilowatt-hour (SEK/kWh) using cost of investment, operation & maintenance and taxes & subsidies. Total investment cost is recalculated to production cost using the annuity method at three different interest rates (6%, 9% and 12%).The comparison is made between three cases of wind power and two cases of nuclear power. For wind power there are two ocean-based (300MW and 100MW installed capacity, respectively) and one land-based (60MW) wind farm. For nuclear power there is one EPR-reactor (1600MW) and one AP1000-reactor (1100MW).
Lönsamheten i vindkraft : en studie om den förväntade lönsamheten i landsbaserad vindkraft
This thesis analyzes the expected profitability in land based wind power plants. The expected profitability is calculated on the basis of a wind power project in Vartofta, Falköping. The information required to calculate the expected outcome is then concentrated to this project, which is in this thesis called project Näs. In project Näs they plan to build three wind power plants, with each an effect of 2 MWh. These wind power plants are very capital intensive investments with a long and uncertain payback time.