608 Uppsatser om Wind Farm - Sida 1 av 41

En vindkraftparks inverkan på Gävle Energis elnät

The effects from a planned Wind Farm on the grid utility Gävle Energis electrical grid have been studied. The Wind Farm is planned to be built in the forest 15 km north of Gävle and will have 23 turbines with rated power from 2 to 2.5 MW, resulting in a total installed power between 46 MW and 57.5 MW. The grid connection will be made at 70 kV. The aim of the analysis was to determine what effects the Wind Farm would have on the power grid in the form of electrical disturbances (flicker etc.), need for new investment and raised operational cost. To allow the connection of the Wind Farm technical solutions (new lines, power stations and grid reinforcements) have been constructed.

Simulering av elektriska förluster i en vindkraftpark : Utveckling av programvaran Wind Farm ElectricSystem Calculator (WFESC)

When planning new Wind Farms, the cost for the internal electrical grid is estimated to account for 8-9 % of the total investment cost. On top of that, the cost for accumulated reduced income over several years (due to electrical losses), has to be added. The economic lifespan is relatively long (about 20 years) which means that an error in the loss calculation could lead to a bad decision basis. The accumulated reduced incomes due to electrical losses can be higher than the initial investment cost for the internal electrical grid.Today, Statkraft Sweden is using a template number when estimating the electrical losses in a Wind Farm. The actual losses are probably lower than the template number which could lead to an unnecessary high loss cost when planning a new Wind Farm.The aim of this M.Sc.

Projektering av vindkraftspark i Juddhult, Småland

The aim with this study was to collect fundamental information, and to plan, a windpower farm in Juddhult , Småland in southern Sweden. The goal is to collect the bestavailable projecting planning support. The pieces of this projecting planning supportthat will be presented is; Environmental Consequence Description (MKB), productioncalculations, comparisons between different plant types, economic calculations, evaluatethe economy and give some farm design suggestions. The imagined Wind Farm will belocated in forest environment and which may cause a number of new problems. Specialinterest that will be affected, where special consideration because of the forestenvironmental is requested is, hunting, wetlands, ancient monuments and windturbulence.

Finansiering av vindkraft : fallstudie av Lau Vind AB

The wind power increase of Gotland as well as other parts of Sweden during the last ten year period has meant that this renewable energy source has increased its share over other fossil sources. The year of 2011 became the first when the wind power produced more energy than an average nuclear reactor. Now that wind power is in an expansive phase, the land issue will be of great interest. Land with good wind resources will be of interest to wind energy developers. The problems that this essay is based on are; how can landowners altering the economic conditions at a wind power establishment? What opportunities and obstacles exist for landowners who choose to set up wind power on their land? The purpose of this essay is to highlight the economic conditions that exist for landowners for the establishment of Wind Farms, with regard to compensation for the leasing and return on invested capital.

Vägar och markanspråk inom vindkraftsparker i Västerbottens län : Hur verkliga mått förhåller sig till vad som uppges i miljökonsekvensbeskrivningar

The purpose of this study was to increase the level of knowledge in the field of Environmental Impact Assessment (EIA) for wind power. The study includes six wind power farms in the County of Västerbotten in northern Sweden. The main questions were: What are the real dimensions of roadways and land claims for both roads and wind power turbines? How do those dimensions correlate with the dimensions stated in the EIA? Are there any differences in values of the dimensions between the wind power farms that are included in this study? The width of the roadways and the land claims for both roads and wind turbines in wind power farms were examined on site. The results from the examinations were compared with the dimensions available in the EIA for each wind power farm.

Meningen med meningsförändrande innovation inom robotikbranschen : En explorativ fallstudie

The purpose of this study was to increase the level of knowledge in the field of Environmental Impact Assessment (EIA) for wind power. The study includes six wind power farms in the County of Västerbotten in northern Sweden. The main questions were: What are the real dimensions of roadways and land claims for both roads and wind power turbines? How do those dimensions correlate with the dimensions stated in the EIA? Are there any differences in values of the dimensions between the wind power farms that are included in this study? The width of the roadways and the land claims for both roads and wind turbines in wind power farms were examined on site. The results from the examinations were compared with the dimensions available in the EIA for each wind power farm.

Vindkraftetablering och uranborrning i Dalfors-Dalarna; Acceptans bland närboende

The dependency of fossil fuels has to decrease in order to reduce emissions of green house gases. Wind turbines generate electricity with low environmental impact, but the local opinion in Sweden is sometimes an obstacle to new developments. The acceptance of nuclear power increases at the same time. Mining uranium is once again on the agenda and prospectors are currently drilling for uranium. This cross-sectional study deals with acceptance of Wind Farms and uranium drilling.

Förstudie för en vindkraftpark på Malmölandet i Norrköping : En undersökning av förutsättningarna för en vindkraftpark på ett sen tidigare planerat område

This is a feasibility study that examines various aspects of building a Wind Farm on Malmön in Norrköping. The feasibility study deals with interests of conflict, park design, electrical connections, production calculation, financial calculations and operating- and timetable.The report is divided into two distinct parts. First a theoretical part, which deals with conflicting interests, park design and electrical connections. Second a part with simulations dealing with production calculations, and financial calculations.Opposing interests are mapped so that problem areas can be found, and help put focus on the right places at a future environmental impact assessment (EIA). There are a number of areas where planners have to assess on an EIA, this thesis point on the most important areas.

VINDKRAFTSETABLERINGAR : EN JÄMFÖRANDE STUDIE OM NÄRBOENDES INSTÄLLNING TILL VINDKRAFT OCH VINDKRAFTSETABLERINGAR I SVERIGE OCH BRASILIEN

To achieve a sustainable development, three aspects have to take equal place in the society; environmental, economical and social. To reduce the impact on the environment and the amount of greenhouse gases supplied to the atmosphere, industrialized countries and less developed countries must start cooperating. Also the use of renewable energy sources, like solar, hydro and wind power, have to increase.Wind power has great potential as a future energy supply. It is cost efficient, quickly developed and the resource is abundant and available worldwide.Examinations made in Sweden, indicates that there are difficulties establishing wind power at the same pace as the environmental goals, set by the Swedish government, requires. Mainly because people living nearby potential areas for wind power farms, appeal against the decision.This study aims to investigate differences between how people in Sweden and Brazil look at wind power as a future energy source and at the establishing process.

Vindkraft eller kärnkraft - En jämförelse

The scope of this project is to make a comparison of costs associated with wind and nuclear power in order to decide which one of these is the most suitable in the case of an increased demand for electricity. It is also investigated if there are other factors that can influence the choice of energy source.An average cost is calculated in terms of kronor per kilowatt-hour (SEK/kWh) using cost of investment, operation & maintenance and taxes & subsidies. Total investment cost is recalculated to production cost using the annuity method at three different interest rates (6%, 9% and 12%).The comparison is made between three cases of wind power and two cases of nuclear power. For wind power there are two ocean-based (300MW and 100MW installed capacity, respectively) and one land-based (60MW) Wind Farm. For nuclear power there is one EPR-reactor (1600MW) and one AP1000-reactor (1100MW).

Behovet av eget kapital vid köp av jordbruksfastighet :

My purpose with this study was to find out if it is possible to buy a farm today for a person who want to start a farm but has very little own capital. In old study?s they have come to the conclusion that you will need at least 20 % own capital to succeed to management the farm. But in the last year the cost for arable land approxley has increased with 30 % in Sweden and the crops have doubled in price. So it would be interesting to see if the banks have a new vision on the need of the own capital when you buy a farm. I have chosen two different farms who was for sale in Östergötland, one dairy farm and the other farm was a plant farm.

Vindkraft för uppvärmning

This final thesis contains three major parts, which all have been time demanding:* Designing and construction of a small wind turbine.* Designing and construction of an electrical system.* Thesis with fundamental facts about wind, wind power and design.The thesis contains basic theory in wind power and the energy systems it can be combined with. Different types of wind turbines, which components they consists of and important issues to consider when designing is also mentioned. In the end of this report the technique of our wind turbine will be presented. In the end you can also read about our experiences during the time of designing and construction..

Habitat use and ranging behaviour of GPS tracked juvenile golden eagles (Aquila chrysaetos)

Throughout its wide distribution in the northern hemisphere, the golden eagle occurs in a diverse range of environments, e.g., mountainous, forest and open areas. The literature on juvenile golden eagles is limited, and this study provides further knowledge on habitat use and ranging behaviour during the post-fledging period in boreal Sweden. A total of 14 golden eagle juveniles were tagged with GPS transmitters during 2010 and 2011, and nine could be followed during the entire post-fledging period from fledging until migration. The juveniles fledged at the end of July and beginning of August and initiated migration during October and beginning of November. The length of the post-fledging period, until migration started, ranged from 49 to 97 days. During this period, the juveniles? distance from their natal nest and their GPS height increased with time as their flying abilities developed.

Utvärdering av konsekvenserna för nätanslutning av vindkraftparker i Sverige vid införandet av nätkoden Requirements for Generators

Grid codes are becoming more demanding on power generating units due to the factthat the complexity of the power grid is increasing. The penetration of wind powerhas grown over the last years and it is clear that Wind Farms need to be addressedwith the same type of grid codes as conventional generation units. There is howeveran undeniable difference between the technology in conventional synchronousgeneration units, and the asynchronous generation units in Wind Farms.This thesis has reviewed the current grid code in Sweden and compared it to the newcode proposed by ENTSO-E, ?the Requirements for Generators?, in the aspect ofWind Farms with an installed power of 30 MW or more. The comparison has beencomplemented by an analysis of how Wind Farms of two different technologies(Doubly fed induction generators and full power converters) can meet therequirements and technical proposals have been given on how to be able to meetcompliance with the new grid codes.The Requirements for Generators contains many non-exhaustive and optionalrequirements, because of this it has been difficult to, at this stage, exactly point outthe technical impact on the grid connection of future Wind Farms in Sweden.

Livscykelkostnader för vindkraft : En jämförelse av fallstudier

I denna rapport har det utförts två fallstudier från två olika vindkraftsanläggningar och med hjälp av en utarbetad modell har livscykelkostnaderna jämförts för de två fallstudierna.Resultatet visade att livscykelkostnaden per producerad kWh sjunker allteftersom den installerade effekten blir högre.Kostnadsmodellen som utarbetats och tillämpats för resultaten har visat sig ha hög verifierbarhet då resultaten har varit jämförbara med litterära studier..