Sök:

Sökresultat:

1271 Uppsatser om Waste of Electrical and Elektronic Equipment - Sida 46 av 85

Implementering av höghastighetsgränssnitt i 0,15 µm halvledarprocess

This study investigated the possibility of implementing three standards, Transistion Minimized Differential Signaling (TMDS) and two versions of Stub Series Terminated Logic (SSTL), for inter-chip communication in a specific manufacturing process. The two SSTL standards were implemented in one transceiver system while TMDS was implemented in a separate system. The evaluation was done with Spice simulations on schematic level with some parasitic capacitance and resistance. The idea was to investigate the possibility of implementing these standards and get an idea of eventual shortcomings. In order to create models as a basis for evaluation, simulation environments with models for circuit board and packages were created and transmitters and receivers were designed.

Uppgradering av biogas i systemperspektiv med avseende på miljöpåverkan och kostnader

Swedish biogas is currently produced mainly by anaerobic digestion of sewage sludgeat sewage treatment plants, landfills and anaerobic digestion of household or industrialwaste. Also cattle ma-nure from farms can be used to produce biogas. Upgradingbiogas represents an increase in methane concentration from about 65 % to about 97%. In addition, particles and contaminants must be sepa-rated from the upgradedbiogas. There are various methods for upgrading and this report compares sixdifferent methods with respect to environment and economy: water scrubber,Biosling, cryo technology, chemical absorption, Pressure Swing Adsorption (PSA) andmembrane separation.According to the used ORWARE model, chemical adsorption with amine has the leastenvironmen-tal impact (methane emissions) and the lowest costs.

Rening av lakvatten vid deponin Degermyran i Skellefteå kommun : Utvärdering av nuvarande reningseffekt och simulering av mängden bildat lakvatten under 2000-talets klimatförändringar

At Degermyran landfill, situated in the municipal Skellefteå, a leachate treatment system was installed in 2005. One of the aims of this study was to investigate how well the treatment system works by using data from chemical measurements made on the leachate before and after treatment. Further this study had the purpose of investigating how the predicted climate changes of the 21st century will affect the amount of leachate generated at Degermyran by using a modified version of Thornthwaites water balance model. The treatment system has the ability of reducing manganese by 90 %, nitrogen by 73 % och TOC by 79 %. By the turn of this century the amount of precipitation that percolates the waste at Degermyran will be between 254 and 298 mm, depending on the amount of greenhouse gases that will be released in the future to come.

Analys av fördelningssystem för bostadshus

The purpose of this project is to analyze earthing systems for houses. By practical measurements and theoretical analyzes consequences of possible faults, that can occur within the facility and in the low-voltage distribution network, is illustrated.  The reason for this project is that nowadays one has to arrange with a main equipotential bonding system for buildings. Apart from that, if necessary, bathrooms must be provided with a supplementary equipotential bonding system.The practical measurements verify that potential differences in facilities may be due to voltage drops in the PEN conductor between the origin of the electrical installation and the power transformer.Based on the theoretical analyzes of possible faults, it is considered that the requirement for  supplementary equipotential bonding systems for bathrooms in most cases can be questioned, when basic insulation, fault protection, residual current devise and main equipotential bonding system already provides an adequate level of protection.A PEN conductor loss may result in a situation where metallic parts attached to the equipotential bonding system starts working as earth electrodes. Equipotential bonding system may also increase the incidence of stray currents. If TN-C-S systems is provided with a local connection to earth a redundant system against PEN conductor loss is obtained.

Rumslyssnande. Om lyssnande i rytmikmetoden

AbstractThe future of ethanol is depending on good solutions for the production. ENA energy power plant produces electrical power and district heating by heating biofuel. By building an integrated bioenergy plant surplus steam could be used to produce ethanol as fuel to vehicle.This would mean that ethanol is produced renewable energy and the energy for the process derives from the surplus of power.  ENA energy, MDH (the University of Mälardalen) and the energy authority has initiated a research project were different bioenergy combinations integrate with existing power plant.  As a part of the project which size an integrated factory should be to gain the best efficiency for the plant was investigated. Consideration will be taken to the cost of the production in order to be competitive to the price of imported ethanol.  Etanolens framtid vilar på bra lösningar för framställning.  I ENA energi kraftverk i Enköping produceras el och fjärrvärme genom eldning av biobränsle.  Genom att bygga ett integrerat bioenergikraftverk där skulle man kunna använda överskottsånga till att framställa etanol som fordonsbränsle.

Undersökning av kunskaps- och informationsflöden i Passivhusprojekt: med avseende på lufttäthet

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Analys av energilagringssystem portfolio för Volvo hybrid konstruktionsmaskiner

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Passiva filtersystem för rening av lakvatten från avfallsupplag

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Flytta hus. En studie av metodval för tre flyttobjekt i Kiruna stad

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Identifiering av onödigt arbete. En studie vid två specifika projekt

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Solhus i Bahrain Kylning av enfamiljshus med el från solceller

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Betongens yta: porbildning vid gjutning av brokantbalkar med lutande yttersida

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Energisnålt stenhus : Förslag på utformning av enfamiljsvilla i Vejbystrand

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Fuktsäkerhetsprojektering ? från ankommande virke till nyckelfärdigt hus

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

Brokonstruktion i Tibet- Ett led i att förbättra infrastrukturen i området Sichuan

The use of Power Line Communication, PLC, as a communication solution for Automated Meter Reading, AMR, is popular by utilities in Sweden and other parts of the world due to demands of accurate and fast meter reading. However the use of the electrical grid as a communication medium is complex and sometimes problematic. This report handles some of the issues and problems that are important to understand when using the grid as a communications medium. Focus is mainly on investigating high frequency distortion in the Kristianstad power grid own by C4energi caused by a frequency converter. Measurements on site are done to investigate signal damping in the grid, different configurations for the frequency converter and signal strength of the PLC-system.

<- Föregående sida 46 Nästa sida ->