Sök:

Sökresultat:

245 Uppsatser om Vowel duration - Sida 12 av 17

Energianalys av Vikan Kross och Asfalt

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Amningsduration i relation till amningsstart hos förstföderskor : En kvantitativ longitudinell studie

Bakgrund: Hälsofördelarna med amning är välkända, och sedan 1992 försöker svenska sjukhus arbeta efter internationella amningsrekommendationer. Trots detta framkommer brister i vården och amningsstatistiken i Sverige sjunker.Syfte: Syftet med denna studie var att undersöka amningsdurationen hos förstföderskor, om den kunde associeras med vården de fått i samband med barnets födelse och första levnadsdygn, samt med mammornas skattning av amningsstöd vid amningsstart.Metod: Designen var en longitudinell kvantitativ tvärsnittsstudie och urvalet var icke slumpmässigt konsekutivt. I samband med utskrivning från BB, tillfrågades 63 mammor om att delta i en enkätstudie med frågor gällande vården de fått i relation till amning och 52 mammor besvarade enkäten. Efter nio till tolv månader blev de uppringda för en kortare uppföljning och 50 mammor valde att delta.Resultat: Medianen för durationen av exklusiv amning var tre månader och tre veckor och medianen för durationen av partiell amning var åtta månader. Amningsstödet på BB skattades högre vid det första mättillfället, men det påvisades inte ha något samband med amningsdurationen.

Energianalys av lackeringsbox. Utredning av ventilationssystem med åtgärdsförslag

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Metod för beräkning och jämförelse av lönsamhet för trafiksäkerhetsåtgärder

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Bostadsbyggande i Skövde fram till år 2025

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Platschefens ledaregenskaper. Sett ur medarbetarnas perspektiv

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Ventilationssystem med variabla luftflöden - Optimal dimensioneringsmetod för VAV

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

I skuggan av schizofreni : närståendevårdare till personer med schizofrenidiagnos

BakgrundSchizofreni är en psykossjukdom med långvarig duration som kommer och går i skov. Det är oftare män än kvinnor som drabbas och de insjuknar vanligtvis i övre tonåren, kvinnor något senare. Gränsen mellan schizofreni och andra psykoser är svårdragen. Gemensamt för schizofreniformerna är en bristande kontakt med omvärlden, affektiva störningar, tankestörningar och "jag-störning", hallucinationer, vanföreställningar och autism.Psykisk sjukdom drabbar både patient och de som står dem nära. Personer med schizofren diagnos har ofta svårt att klara vardagen, närstående behöver finnas till hands för att ge såväl praktiskt som emotionellt stöd.

Påverkas stereotypt vandrande hos amurleopard (Panthera pardus orientalis) vid ökad förutsägbarhet i samband med utfodring?

Stereotypic pacing is frequently observed in captive carnivores, however the underlying causes of this behaviour remain somewhat unclear. One of these possible causes are unpredictable feeding signals, which may give rise to frustration and subsequent pacing. Animal keepers at Nordens Ark had noticed that their Amur leopards had shown stereotypic pacing in connection to the passing of ATVs (All Terrain Vehicles) used by animal keepers primarly when feeding the animals in the park. The aim of this study was to investigate whether the stereotypic pacing of the two Amur leopards at Nordens Ark were affected by the introduction of a signal associated with feeding. The leopards were trained by classical conditioning to associate the sound of a siren with the delivery of food by an animal keeper.

Uppföljning av EcoDrivingutbildning

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.

Studie av beräkningsmetoder för pålar i kohesionsjord med pågående marksättningar

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Utvärdering av samverkansbjälklag. Stålbjälklagskassett jämförd mot plattbärlag och håldäcksbjälklag

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Underhåll av asfaltbeläggningar. Utvärdering med inriktning mot årskostnad och livslängd

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Strategier hos de stora svenska byggföretagen 1992-2006

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Solvärme för flerbostadshus. Utvärdering av EKSTA bostad ABs solvärmeanläggningar

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

<- Föregående sida 12 Nästa sida ->