Sökresultat:
455 Uppsatser om Voltage stability - Sida 12 av 31
SPICA - ARISTO JÄMFÖRELSE studie av analysprogram med avseende på spånningskollaps i elektriska kraftsystem
Safe operation of a large synchronous power system as Nordel is not an easy task.There are several aspects to take into consideration. This thesis focuses on the problems due to voltage collapses in a transmission system.The ability to foresee an upcoming collapse is vital to maintain stable operation of the grid. The grid operator at Svenska Kraftnät (SvK) uses the computer program SPICA to predict the maximum transfer limit at specified transfer sections. SPICA uses actual states from the grid to predict the transfer limitation, and a quarter later a renewed estimate is produced and so on. This means that the operator can se his transfer limits vary every fifteen minutes.Our task in this project is to validate the accuracy of the limitations obtained by SPICA.
Åsktransienter och överspänningar : En spänningsfylld simulering av elkraftsystemet vid Forsmark 3
A power system will inevitably be subjected to transient overvoltages, most often produced by switching operations and lightning strikes. These transient overvoltages may harm sensitive equipment without sufficient protection, but it is not an easy task to predict what transients may occur or how they affect the system. A fault occurred in a low voltage system at Forsmark 2012 and overvoltages from lightning were concluded as the probable cause. The three aims with this thesis are to develop and test a model of the power system at Forsmark 3, analyse the transient behaviour of the system when subjected to lightning surges and identify critical parameters, and lastly to provide a tool for investigating the protection of the system. The modelling and simulations were performed in the freely available simulation program LT Spice.
Aggregatstabilitet, jordbearbetning och fosforförluster i ett typområde på jordbruksmark :
Large amounts of phosphorus (P) are lost from the arable land due to water erosion. Both phosphorus attached to particles and dissolved phosphorus (mainly phosphate) are transported away with drainage-water and surface runoff. Good soil structure is important in minimizing these losses.
In this study, soils from 50 fields were analysed with respect to aggregate stability as measured by dispersion of clay together with the content of total phosphorus (TotP), particulate phosphorus (PP) and phosphate phosphorus (PO4P) in the water phase. All soils were clay soils with clay content varying between 21 and 54%.
Towards a function for an Arabidopsis protein involved in sucrose dynamics
System based models of plants rely on descriptions and assigned functions of genes, and currently 50% of the genes in Arabidopsis thaliana has either no assigned function or a function based on homology only. Mitogen activated protein kinases (MAPK's) are key players in cell signalling and are conserved among eukaryotes, though their targets are highly diverse. A recent study has described a small Arabidopsis protein (80), without homology to any described protein, as a phosphorylation target of the MAPK's MPK3/6. Further work established ?-glucan phosphorylase (PHS) as interacting with 80 and described a delayed senescence phenotype for 80 knock-out plants.
Analys av fördelningssystem för bostadshus
The purpose of this project is to analyze earthing systems for houses. By practical measurements and theoretical analyzes consequences of possible faults, that can occur within the facility and in the low-voltage distribution network, is illustrated. The reason for this project is that nowadays one has to arrange with a main equipotential bonding system for buildings. Apart from that, if necessary, bathrooms must be provided with a supplementary equipotential bonding system.The practical measurements verify that potential differences in facilities may be due to voltage drops in the PEN conductor between the origin of the electrical installation and the power transformer.Based on the theoretical analyzes of possible faults, it is considered that the requirement for supplementary equipotential bonding systems for bathrooms in most cases can be questioned, when basic insulation, fault protection, residual current devise and main equipotential bonding system already provides an adequate level of protection.A PEN conductor loss may result in a situation where metallic parts attached to the equipotential bonding system starts working as earth electrodes. Equipotential bonding system may also increase the incidence of stray currents. If TN-C-S systems is provided with a local connection to earth a redundant system against PEN conductor loss is obtained.
Trafikverkets effektstyrningssystem - EFS 132 kV : Bidraget till minskade förluster
The technological legacy from the early electrification of the Swedish railroads has resulted in a power grid with a lower grid frequency than the national power grid from which it is fed. Energy transfer between these power grids with different frequencies requires substations, adapting the grid frequency for the rail road power grid. For this purpose, a feeding power grid has been built, stretching across the country from Boden in the north to Tälle/Häggvik in the south.Power transfer in the Swedish power grid results in voltage angle differences which increase with increasing loads and transfer distance. These voltage angle differences are transferred from the power feeding substations to the rail road power grid, will in some extent cause loss of energy due to unwanted power flows from north to south.To minimize the losses due to this phenomenon, a power management system called EFS 132 kV has been developed and implemented. The system minimizes the unwanted power flows and controls the desired power flow for a good distribution of loads between the power feeding substations.This thesis investigates the extent of the transmission losses avoided due to the EFS 132 kV that coordinates the idling angles to a common reference point.The results indicate that EFS 132 kV affects the power flow, especially between the northern substations through an improved load distribution.
Analys av PWM-mönster i Matlab
One of ABB Power Systems´s business areas is HVDC (High Voltage Direct Current) technology. HVDC is used for transmissions for both short and long distances. One of Power Systems?s products is called HVDC Light. HVDC Light is a relatively new technology for power transmission, but have before only been used for motor drives applications.
VSM och 16 förluster
With background in the rapidly growing need to find solutions for sustainable energy production and the increasing interest for wind power, this report was written. With take-off point from the wind power plant Big Glenn, which has been built in the harbour of Gothenburg, a model of the adjacent power grid has been created in Simulink/SimPowerSystems. Parameters for the power grid and its components has been provided by Göteborg Energi Nät, that has also been the supplier of measurement data of produced power, the power need from loads in the vicinity, voltage levels, current values and also the variation of power factor at the wind power plant.The SimPowerSystems model has been used to perform simulations of power flow in the grid. These simulated values have then been compared to the measured values to verify the functionality of the model. Further, the model has been used to perform simulations of a grid fault, which causes a voltage drop.
Konstruktion av turbinmodell för kaplanturbiner
Denna rapport beskriver arbetet med utvecklingen av en ny modell för kaplanturbiner. Utvecklingen bygger på två kopplade differentialekvationer som under arbetets gång anpassats och implementerats i turbinmodellen.Modellen beskriver hur vattenflöde och turbinmoment påverkas av avvikelsen från den optimala kombineringskurvan för vinklarna på turbinens ledskena och löphjul, och är anpassad för ett referensaggregat med tillgängliga provdata. Även övriga enheter i vattenkraftaggregatet modelleras och sätts samman med frekvensregulator och elnät för att simulera aggregatets reglerstabilitet i önätsdrift.Verifieringen av turbinmodellen sker genom försök att återskapa de befintliga verkningsgradskurvorna med hjälp av modellen. Resultatet visar en god följning av de verkliga kurvformerna, dock med något lägre maximal verkningsgrad.Verifieringen av önätmodellen sker genom att prova stabiliteten i nätfrekvens och turbineffekt vid stegpålastningar. Resultatet ger en stabilare reglerstabilitet än i verkligheten, men uppfyller ändå förväntningarna på en fungerande modell.This report describes the development of a new kaplan turbine model.
Dimensionering av hjälptransformator
The aims of the following project has beento make a proposition how to create aspecific kind of transformer. Thefollowing report evaluates the differentimportant variables and contains asuggestion for a possible design. Intheory it's an ordinary transformer that'ssuppose to transform electrical effect toa high voltage line. The design of thetransformer is using an already existingcurrent transformer design and is adjustedto work for it's specific purpose. Theproject also contains the developing of atransformer simulation model that will beused to evaluate and optimize thedimensions of the resulting transformer..
?Knowing what is going on? : -Tågförares upplevelser av ERTMS
The aims of the following project has beento make a proposition how to create aspecific kind of transformer. Thefollowing report evaluates the differentimportant variables and contains asuggestion for a possible design. Intheory it's an ordinary transformer that'ssuppose to transform electrical effect toa high voltage line. The design of thetransformer is using an already existingcurrent transformer design and is adjustedto work for it's specific purpose. Theproject also contains the developing of atransformer simulation model that will beused to evaluate and optimize thedimensions of the resulting transformer..
Kvalitetsegenskaper på en kravspecifikation
The result from Requirements Engineering is a Requirements Specification. Characteristics of a good Requirements Specification are unambiguity, completeness, verifiability, consistency, modifiability, traceability, correctness and ranked for importance and/or stability.This work defines these quality attributes and answers the questions how to reach these attributes and the diffuculties which exist in this area.This work should be read to get an overwiew of the area Requirements Engineering and Requirements Specification..
Konstruktion av current conveyors via makromodellering
A current conveyor is an active building block that can be used to implement most active and passive components. It differs from the operation amplifier in that it uses current instead of voltage. The current conveyor also has significantly higher voltage gain over a broader frequency range. To simplify the construction of analogue circuits and increase the construction efficiency it is desirable to use a top-down methodology. This means that the whole system is partitioned into a hierarchy of subsystems.
Simulering av vindkraftverk och närliggande elnät vid Risholmen i Göteborg i SimPowerSystems
With background in the rapidly growing need to find solutions for sustainable energy production and the increasing interest for wind power, this report was written. With take-off point from the wind power plant Big Glenn, which has been built in the harbour of Gothenburg, a model of the adjacent power grid has been created in Simulink/SimPowerSystems. Parameters for the power grid and its components has been provided by Göteborg Energi Nät, that has also been the supplier of measurement data of produced power, the power need from loads in the vicinity, voltage levels, current values and also the variation of power factor at the wind power plant.The SimPowerSystems model has been used to perform simulations of power flow in the grid. These simulated values have then been compared to the measured values to verify the functionality of the model. Further, the model has been used to perform simulations of a grid fault, which causes a voltage drop.
Islastens inverkan på brottsannolikheten för glidning och stjälpning av betongdammar
There are many old dams in Sweden and, since few dams are constructed today, the main task in risk assessment on the existing dams is often to reduce the risk of failure. RIDAS (Swedish Guidelines on Dam Safety) is used when designing new dams and assess the existing ones. The guidelines include stability requirements for different failure modes, e.g. overturning and sliding, which imply that the load effect from e.g. uplift and ice load need to be less than the resisting loads or moments.