Sök:

Sökresultat:

7921 Uppsatser om Virtual Design and Construction - Sida 8 av 529

Produktionseffektivisering : - Få processens samtliga aktörer att sträva mot samma mål genom ökat samarbete och delaktighet i produktionens olika skeenden.

The productiontime in the construction industry contains of many different participants which will take part in different events. When there is so many people working with the same project it is easy tosee one self just as a part of the game. The consequence of this is that they don?t see themselves as important participants whos knowledge, opinions and experience can be useful in the whole production process. This might lead to that they feel neglected and the consequence of that will be lackof motivation.

Immateriella värden & design -eller ?Det skall tåla ögats slitage?

Bakgrund: I konkurrens om morgondagens konsument kommer sannolikt materiella värden inte räcka till. Företag måste också kunna erbjuda immateriella värden genom upplevelser. Ett sätt att göra detta är via produktens design. Den företagsekonomiska relevansen understyrks ytterligare av det faktum att lite forskning finns kring immateriellt värdeskapande och design. Syfte: Syftet med uppsatsen är att bidra med förståelse för hur design kan tillföra immateriella värden till en produkt.

Hus på väg : En kostnadsstudie över flyttning av tre enfamiljshus

This thesis treats Building Information Modeling, BIM, in the production stage. Brieflydescribed BIM is virtual model of a building object where all information about theobject is gathered. All the involved operators in the construction project have access tothe model and can gather or share information about the project. There are several waysto apply BIM in the production stage. This thesis primarily deals with visualization of theobject, preparation and planning, the ability to take amounts from the model andcoordination and clash control.The basic issue was highlighted by Byggdialog AB.

ARBETSMILJÖ OCH OLYCKOR I BYGGBRANSCHEN

The construction industry accounted for 19 % of all work-related fatalities in Sweden between 2010 and 2013. The exam report has been done to find out what underlying causes there are to the high number of fatalities and to the occupational statistics of the construction industry. Moreover it has been reviewed what improvements can be done to reduce accidents and fatalities in the construction industry. The report consists of a survey of statistics, laws and regulations affecting the work environment and of literature concerning the subject. It has been conducted an interview and a questionnaire survey at the construction company Asplunds Bygg and an interview with an inspector from the Work Environment Authority.

Ägarstrukturen i Sverige : Hur påverkar den företagens resultat?

Frågan om verkligheten och dess beskaffenhet har länge orsakat stor förbryllning hos människan, vilken historiskt sett har försökt förklarats på olika sätt. Inte minst genom olika slags gudaläror. Idag lever vi helt annorlunda än vad vi gjorde för exempelvis 1000 år sedan. Det är inte längre gudar som är den dominerande verkligheten ? det är IT-tekniken.

Utveckling och design av spegelskåp för badrum

This report is a documentation of a Master?s thesis of 20 credits performed at the educational program of Technical Product- and Production Development with Design at Halmstad University. The project is carried out in cooperation with Hafa AB in Halmstad.The purpose of this project was to bring forth a concept of a bathroom cabinet for Hafa?s new selection Young through creative design methods. The selection is supposed to attract the younger purchaser but also a target group that dare to experiment with home furnishing and appreciates new design.

Informationsutbyte från BIM-modeller : Från BIM-modell till format hanterbara av förvaltning- och GIS-system

BIM has been a trend in recent years when it comes to design and construction ofnew buildings. However, there has been less talk about what happens to BIM modelsafter the construction phase.This issue has been raised at the Forsmark construction documentation department.This thesis aims to look at how the information in a BIM model can be transferred tofacility management and GIS systems and thus add value, even after the constructionphase.Questions raises how such an exchange might look like and whether it is reliable.How should a claim be brought to planners for such an exchange to work.This thesis tested some of the most common methods for this kind of exchange ofinformation from BIM models to facility management and GIS. It was formats like IFC,Fi2xml and a database connectivity that was analyzed by a computer simulation of amodel provided by Forsmark. The model consisted of an existing office building atForsmark, modeled in Autodesk Revit.The results indicate that the formats tested require a precise plotting of the models.The loss of information that came to light in the simulation could be attributed tofailure modeling in Revit. Even such things as naming of areas must be consistent.

BIM i produktionsskedet

This thesis treats Building Information Modeling, BIM, in the production stage. Brieflydescribed BIM is virtual model of a building object where all information about theobject is gathered. All the involved operators in the construction project have access tothe model and can gather or share information about the project. There are several waysto apply BIM in the production stage. This thesis primarily deals with visualization of theobject, preparation and planning, the ability to take amounts from the model andcoordination and clash control.The basic issue was highlighted by Byggdialog AB.

Industrialiserat byggande : Fältfabrikens användning, utveckling och framtid

The construction industry is currently receiving much criticism for inefficiency and slow development while demands for reduced built in moisture and efficiency increases. This report examines whether the use of field factories can meet these requirements and what factors that will be critical for future use of field factories. Industrialized construction with field factory is compared with traditional loose timber construction and industrial construction in the fields of execution, logistics and working environment. The aim of this report is to provide a basis for field factories current and future use and development. To achieve the aim of the report, people with experience in the use of the various methods was interviewed and literature studies in the various fields done.

Arbetsmiljö och säkerhet : På mindre företag inom byggindustrin

The accident frequency in the construction industry has shown a downward trend every year but this trend was broken 2010th. It is often lack of precautionary measures within work environment and safety that is the cause of accidents. The big construction companies understand the importance of precautionary measures within work environment and safety, as they spend a lot of money and time on that matter. By examining the work environment and the safety of the small construction companies you can see how they work. The report will presents how these small companies work with work environment and safety, and also how they follow the safety instructions that are available and how they make use of safety equipment.

Lastbalanseringsalgoritmer : En utvärdering av lastbalanseringsalgoritmer i ett LVS-kluster där noderna har olika operativsystem

Denna rapport behandlar en undersökning av olika lastbalanseringsalgoritmer i Linux Virtual Server. Undersökningen har gjorts i ett webbkluster (Apache var webbservern som användes) med tre heterogena noder, där operativsystemet var den detalj som skiljde dem åt. Operativsystemen som ingick i undersökningen var Windows Server 2008 R2, CentOS 6.2 och FreeBSD 9.0. De faktorer som undersöktes mellan de olika algoritmerna var klustrets genomsnittliga svarstid vid olika belastning och hur många anslutningar som kunde hanteras av klustret, detta gjordes med verktyget httperf.Undersökningen ger svar på hur ett heterogent webbklusters genomsnittligasvarstid och arbetskapacitet kan skilja sig åt beroende på vilken algoritm som används för lastbalansering. Resultatet visar att den genomsnittliga svarstiden håller sig låg tills en hastig stigning inträffar.

Mjölkkyl till espressomaskin : Impressive cooler

The project was made in cooperation with Coffee Queen AB, Arvika. The task was to develop and design a new cooler for the milk to Jura Impressa X9, an espresso machine. The good assistance with staff at Coffee Queen and engineers in China and at KPA in Karlstad led to a solution to the problem. It was a long road to get there, many different concepts was developed. When the day came to decide which concept to work with, the choice stood between two different technical solutions.

Blir nog att jag tar och går och tar en tupplur nu. Om pseudosamordningar med gå och ta som förstaled.

This study provides a Construction-Grammar analysis of Swedish pseudo-coordination construction with the verbs gå "go" and ta "take" on the basis of an examination of empirical data. Factors bringing about different readings of gå and ta pseudocoordinations are discussed, showing that the readings correlate with certain semantic properties of the first and the second conjunct. Three distinct pseudocoordinations with gå are proposed, differing as to their readings: inceptive, surprising and imperfective. The single ta pseudocoordination is claimed to have both inceptive and intentional readings. It is illustrated that the readings of gå and ta pseudocoordinations are affected not only by inherent lexical properties of single conjuncts but also by their interaction with construction-level characteristics.

Optimeringsflöde av modelleringsprogram vid broprojektering : Analys av de tre modelleringsprogrammen Tekla Structures, Revit 2013 och Rhinoceros

This thesis treats Building Information Modeling, BIM, in the production stage. Brieflydescribed BIM is virtual model of a building object where all information about theobject is gathered. All the involved operators in the construction project have access tothe model and can gather or share information about the project. There are several waysto apply BIM in the production stage. This thesis primarily deals with visualization of theobject, preparation and planning, the ability to take amounts from the model andcoordination and clash control.The basic issue was highlighted by Byggdialog AB.

iPad på en byggarbetsplats : Det effektiva och papperslösa sättet att arbeta på

Quality assurance of construction projects and create effective ways of working, is intoday's pressed position, major objectives for building contractor companies. This thesis is an attempt to see if it is possible to achieve these goals with the new modern tool iPad.The author of this thesis has during the latter half of his one year practice work in Uppsala for the Swedish building construction company NCC Construction Sverige AB, conducted a study on the possibility of using the iPad on an construction site. This has been done with active field studies in which applications have been tested and also the supervisors receptive. The usability of the iPad has always been in focus since it is important that the applications are easy to use and easy to learn.The results of the work, as presented in this report, points at opportunities in efficiency if the iPad is introduced and used on construction site. There are many useful applications for the iPad, and with a system that can handle the synchronization between the iPad and the computer, the workflow will be streamlined significantly..

<- Föregående sida 8 Nästa sida ->