Sökresultat:
9524 Uppsatser om VBX; Ventilation-system; Heat recovery - Sida 6 av 635
Utveckling av lastmodell för Uppsala fjärrvärmenät
The aim of this study was to develop a load prognosis model for Uppsala district heating system to be used as a tool for heat production optimization. The methodwas to build three models for the different customer types; housing, industry andoffices and then scale them for the total system using data from Uppsala districtheating system. The heat load consists of two parts, one that is temperaturedependent and one that is dependent of the social behavior of the customers. Thetemperature part was modelled with an ARX model using an outdoor temperatureprognosis as input signal. The social behavior part was modelled using the mean ofthe social behavior from some days before and additionally by distinguishing betweenweekdays and weekends.
Samkörning mellan värmepumpar och fjärrvärme : Bostadsrättsföreningen Bogården
This diploma work covers an investigation over the heat - and hot water systems of thetenant-owner's association, Bogården. The heat - and hot water needs of Bogården aresatisfied by both district heating as well as three heat pumps. Implemented investigationshows that the heat pumps are not used in a profitable way. Apart from that, the reservepossibilities are small. There is also a risk of the growth of Legionella bacterium in thehot water system.Since the heat pumps are already installed, HSB-Gävleborg (responsible for Bogården)has a wish to investigate possible proposed actions for optimization of existing plant.After completed investigation, a new proposed action is presented.
Prestandaförändringen hos en bergvärmeanläggning efter fem års drifttid
The aim of this report was to do a case study at a geothermal heating system which has been in operation for about 5 years, and study if its performance has changed during this period of time. A literature study about the processes involved was also done in purpose of background knowledge.The tenant-owner?s association Duvan at Petterslundsgatan in Uppsala installed year 1999-2000 a geothermal heating system. The purpose of this installation was that they hoped it would lead to a smaller usage of district heating which would lead to a reduction of the heating expenses for their buildings. The geothermal heating system consists of 19 energy wells and 4 geothermal heat pumps, and it is one of the first systems of that size in the region of Uppsala.
Nerver i karpala flexorretinaklet på häst
The anatomy and physiology of reptiles and mammals are in many ways different, and will therefore possibly complicate anesthetic administration. Lizards are ectothermic and one should keep in mind that a decrease in the lizard?s environmental temperature may result in reductions in anesthetic metabolism. Respiratory depression is a profound problem because lizards lack a diaphragm, making inhalation and expiration completely active processes. This, in combination with cardiac shunting and breath holding makes the effects of anesthesia unpredictable.
En byggnads energibehov : En studie om energieffektivisering av en befintlig byggnad i södra Sverige
The purpose of the study was to investigate the use and losses of energy in an existing older building. Another purpose was also to look through various options for heating systems with renewable energy in the building. The aim was to reduce the use and losses of energy. The first step was to study the related electricity bills of the building and also perform measurements and calculations of the building envelope and ventilation. The next step was to find out the possible actions for energy saving by performing measurements and calculations.
Metoder för lastprioritering i fjärrvärmecentraler
A problem in the field of district heating is the oil burners needed to provide power when a peak load occurs. One possible way of reducing the needed amount of oil is to reduce the power demand for space heating in the district-heating substations when the need for district heating water exceeds a certain limit. This can be done by use of a locally working controller function.In this Thesis the options concerning load priority are evaluated. To evaluate the potential for using controller functions concerning peak load priority an experiment was brought out in a chosen district-heating substation. The impact on the indoor thermal comfort during a heat reduction was also taken into account.
Kylapotentialen i Drefviken för Vattenfall Heat AB
Vattenfall Heat AB is a district heat provider in Drefviken, but has yet to establish any cooling systems in this area. This thesis examines the potential client base within the area today and over the coming 20 years. The feasibility of the most common cooling technologies is evaluated and results show a total potential for an installed capacity of 30 MW providing 50 GWh of cooling per year. One of the examined areas shows good prospect for heat driven absorption chillers during the summer months when the heat load is limited..
Motor till unikt luftvärmeväxlarsystem
Gtherm is an innovation company who has an unique air heat exchanger underdevelopment. The purpose of this thesis is to provide data of suitable motors for theheat exchanger and to find suitable motor suppliers.A motor specification was designed. It is an important basis for the search of suitablemotors. A compilation was made of nine motor suppliers and the suitable motorsfrom those. The compilation can be used by GTherm in their choice of suppliers andmotors.The compilation of the demands on the motor and analysis of suppliers indicated thatthere were no standard motors available to GTherms air heat exchanger.
Anestesi av ödlor
The anatomy and physiology of reptiles and mammals are in many ways different, and will therefore possibly complicate anesthetic administration. Lizards are ectothermic and one should keep in mind that a decrease in the lizard?s environmental temperature may result in reductions in anesthetic metabolism. Respiratory depression is a profound problem because lizards lack a diaphragm, making inhalation and expiration completely active processes. This, in combination with cardiac shunting and breath holding makes the effects of anesthesia unpredictable.
Energianalys av Svensk Växtkrafts biogasanläggning i Västerås
Svensk Växtkraft is the owner of the biogas plant in Västerås. The company is planning to increase
their treatment capacity at their biogas plant. In connection to this work it is also possible to make
some energy saving changes to the biogas plant. The objective of this study was therefore to make
an electricity and heat survey of the biogas plant, a detailed study of the heat consumption in the
sanitation step and also a comparison of energy consumption with the present sanitation method
and an alternative strategy where the waste is treated in 55 °C during 10 hours (the current method
is heating to 70 °C during 1 hour).
The energy survey was conducted in close collaboration with staff at the biogas plant. The current
during normal operation was measured, power was calculated and multiplied by the time of usage to
obtain the energy consumed.
Utvärdering och åtgärdsförslag av energianvändning i kontorsbyggnad
AbstractEmbla 5 is an office building which has done a large improvement. The clients of this building has made an order of WSP and the student Anders Kempe to calculate the use of energy for the building, and after that result proposing further measures which can decrease the energy use of Embla 5.The ground for this report is when calculation of the present energy use of the building is stated. To make that information of a number of parameters such as envelope, the heating system and ventilation has been located and set in to the simulation program IDA ICE which calculate the energy use.To improve the energy use further this project has been concentrated to change the system of ventilation. Today the ventilation system is of the kind CAV (constant air volume) and the air flow is dimensioned for after recommendations from BBR and Arbetsmiljöverket in the office spaces. Consider that Embla 5 is an office building where the people only staying for 8-10 hours/day so was the ide to see how much energy saving if the air flow is reduced the time people not being in the building.
Värmeåtervinning ur ventilationsluft i äldre flerbostadshus : En jämförande studie av centralt FTX- och FX system
En jämförelsestudie har genomförts mellan två värmesystem. Analysen har genomförts med ett flerbostadshus som referensfasighet. Fastigheten är lokaliserad i Södertälje kommun. Analysen går ut på att bestämma vilket värmesystem som är fördelaktigt vid renovering av äldre flerbostadshus med avseende på energi och kostnad. De systemen som har behandlats är ett centralt värmesystem med motströmsvärmeväxlare och ett centralt värmesystem med frånluftsvärmepump.Det centrala värmesystemet (Eq aggregat) är ett centralt från- och tilluftssystem med återvinning (FTX system).
Energieffektivisering och solenergi i en universitetsbyggnad : Undervisningshuset och Biblioteket i Uppsala
Akademiska hus is a real estate company that specializes in providing Swedish universities with housing facilities for educational and research purposes. The company strives to reduce its use of energy by 40% between the years 2000 and 2025. The aim of this thesis is to determine which measures can be taken to reduce the need of purchased energy in a building that is used by theSwedishUniversityof Agricultural Sciences inUppsala.In order to determine the results of various changes to the building envelope and ventilation system, the building was modelled in the computer simulation program VIP-Energy. Other proposed changes to make the use of energy more efficient concerned water use and lighting. The need of purchased energy can also be reduced by producing electricity or heat on site, using solar energy.Results show that economically viable measures include upgrading windows and faucets, adjusting control systems for ventilation and lighting, and installing roof mounted solar panels for power production.
Återhämtning från alkohol och drogproblem : - en fenomenologisk studie av fyra människors återhämtningsprocesser
The aim of this study is to increase understanding about addiction recovery. More specifically, we want to know what people who have had problems with alcohol and/or other drugs perceive as helpful and important for their recovery process and how we can understand this process.The study was conducted by means of qualitative semi-structured interviews with four people who have had alcohol and/or other drug problems. The analysis is based on a transtheoretical model of change from addictive behaviours, coping, interactionist theories and also a recovery perspective, inspired by research on recovery from mental illness . Main findings are that recovery from addiction can be understood as an individual process that takes place in a social context and can follow expected phases, although there are large individual differences in the process. Through the recovery process it has been of importance to the participants in the study to redefine themselves and their problems, get support from others, find ways to cope with their problems, get involved in meaningful activities and to expand their social roles.
Projektering av radiatorsystem och fjärrvärme sekundärsystem : Projektering av radiatorsystem och fjärrvärme sekundärsystem för bostadsrättsföreningen Stålet, Luleå.
Bostadsområdet Stålet i Luleå ägs av en bostadsrättsförening som omfattar 30 stycken lägenhetshus. Riksbyggen är fastighetsförvaltare för denna förening och sköter bl.a. den tekniska förvaltningen. Riksbyggen har fått i uppgift att se över föreningens radiator- och fjärrvärme sekundärsystem för att i förlängningen eventuellt byta ut dessa system pga. eftersatt underhåll och med osäker drift som resultat.