Sök:

Sökresultat:

40 Uppsatser om Upgrading - Sida 2 av 3

Vasaparkens nya kläder : en studie av ett förnyelseprojekt i förhållande till platsens historia

In 2007 the project with the renewal of the Vasa Park in Stockholm won the Siena Prize. The architects responsible for the project described how they aimed for Upgrading the park within its historical framework. Since the project was a renewal and not a restoration of the park, I thought it would be interesting to study how the architects proceeded with this work. The aim of this essay has therefore been to examine how the last renewal of the Vasa Park has chosen to approach the history of the place. To understand the historical development of the park and how the renewal project was carried out, I started with a literature survey consisting of books, the program of the renewal and articles about the project.

Undersökning av Södra-transportörernas användande av KOLA-systemet

The purpose of this study was to create a picture of Södra´s round wood transporters usage, and positive or negative experiences of the KOLA-system. The KOLA-system, owned and managed by SDC, is a program for handling timber orders and displaying their locations on digital maps. The study was conducted as a twenty-three question internet-based survey. Of those asked to complete the survey, 57 percent chose to answer the questions. The results of the study indicated that several of the transporters found the system quite good and used it to a large extent. The system also had many deficiencies however, and there was clear potential for further increasing the usage of the system.

Integration av simuleringsmodeller för bränslesystemet i JAS 39 Gripen

In this final thesis two simulation models have been integrated. The simulation models are models of JAS 39 Gripen?s fuel system, software and hardware. The time consuming and costly work to develop software has made the department of fuel system to build two models in Xmath/Systembuild. The software model also simplifies the comprehension of how the software in the control computer of the fuel system works.

Restvärmeåteranvändning från absorptionsvärmepumpar : en kartläggning av möjligheter och begränsningar vid Vattenfall Värme Uppsala Block 5

Vattenfall district Heating power plant in Uppsala produces district cooling with absorption heat pumps which leads to a large amount of waste heat that has to be cooled with evaporative cooling towers. The Environmental Court has ordered Vattenfall to survey the possibilities to recover the heat, which is the focus of this thesis.The study begins with an overview of the system, and conditions and limitations for waste heat recovery is examined. In the next step alternatives to recycle the heat is evaluated, either by direct recovering or by Upgrading.First, the technical possibility of each alternative is discussed, and then the operation time and the amount of recovered heat is calculated. Those alternatives which are possible are brought further to an economic analysis.The cost of investment for each alternative constitutes the basis for a present value analysis. The results are put together in a table where the total amount of recovered heat is compared with the present value for the different alternatives.

Energieffektivisering i flerbostadshus för studentboende

Uppsalahem AB is a municipally owned real estate concern that owns and administrates housing for nearly 30 000 people. The company puts a lot of effort into reducing the energy use of their housing stock. This project is a master?s thesis in the energy systems programme at Uppsala University, carried out in collaboration with Uppsalahem. The aim of this thesis is to provide energy saving measures for fourteen student housing buildings in Uppsala, Sweden.

Förbättring av utnyttjandegrad i robotcell

When a company in the manufactory industry makes costly investments, it's important that these are used as much as possible. The company in this case claims that their invested robot cell, with CNC machine isn't used enough. The questions here are: How can we improve the use of the robot cell? Which products are appropriate for the production in the robot cell? As a method to come to a conclusion, an analysis has been made over the manufactured products. And also interviews with machine operators and the production management.

Energieffektivisering och solenergi i en universitetsbyggnad : Undervisningshuset och Biblioteket i Uppsala

Akademiska hus is a real estate company that specializes in providing Swedish universities with housing facilities for educational and research purposes. The company strives to reduce its use of energy by 40% between the years 2000 and 2025. The aim of this thesis is to determine which measures can be taken to reduce the need of purchased energy in a building that is used by theSwedishUniversityof Agricultural Sciences inUppsala.In order to determine the results of various changes to the building envelope and ventilation system, the building was modelled in the computer simulation program VIP-Energy. Other proposed changes to make the use of energy more efficient concerned water use and lighting. The need of purchased energy can also be reduced by producing electricity or heat on site, using solar energy.Results show that economically viable measures include Upgrading windows and faucets, adjusting control systems for ventilation and lighting, and installing roof mounted solar panels for power production.

Prim, Stadsförnyelse i Barcelona

This final project discusses renewal and Upgrading of the area of Prim. It is discussed how this industrial area can be an attractive neighborhood with a varied range of services and commercial trade. Prim is located 2km north-east of the center of Barcelona. The area boarders to a deep railway valley that historically has separated Prim from its neighboring districts. At present there is almost no housing, services or commercial trade within the area and the industry is discontinued or the existing industrial buildings are derelict.

Prim, Stadsförnyelse i Barcelona

This final project discusses renewal and Upgrading of the area of Prim. It is discussed how this industrial area can be an attractive neighborhood with a varied range of services and commercial trade. Prim is located 2km north-east of the center of Barcelona. The area boarders to a deep railway valley that historically has separated Prim from its neighboring districts. At present there is almost no housing, services or commercial trade within the area and the industry is discontinued or the existing industrial buildings are derelict. There is also a lack of green recreational areas.

Skärgårdskvinna under efterkrigstiden: en studie om levnadsvillkor i förändring

Den här uppsatsen handlar om levnadsförhållanden bland kvinnor som är eller har varit verksamma inom någon skärgårdsbunden näring i Norrbottens skärgård. Den fokuserar på de förändringar som arbetsförhållandena och det sociala livet genomgått under perioden från andra världskrigets slut fram till idag, 2006. Jag, som forskare och uppsatsförfattare, har försökt nå denna kunskap genom att söka svar på frågor om hur kvinnornas ställning har förändrats i arbetet, i familjeförsörjningen och i det sociala livet. Metoden som använts är kvalitativ och baserad på semistrukturerade intervjuer och kategorianalys av citat tagna från intervjutranskriptionerna. Teorier som använts är Due Billings och Alvessons kritiskt tolkande perspektiv på genus/kön, samt Zollinger Gieles och Holsts omarbetningar av Talcott Parsons begrepp adaptive Upgrading, integration, inclusion och goal differentiation.

Outnyttjade resurser inom park- och naturvård

As a small and land scarce country, effective waste management is ofoutmost importance in Singapore. In this study the production of biogasthrough anaerobic digestion from the organic fraction of municipal solidwaste (OFMSW) was compared to incineration of the waste. At the momentalmost all of the OFMSW in Singapore is incinerated. Three differentscenarios were compared to the reference scenario (incineration): one with alarge scale biogas plant that can treat half of all OFMSW in Singapore, onewith a medium scale biogas plant about 15 times smaller than the large oneand one with a small scale biogas plant that can treat waste from e.g. ashopping center or a food center.By using life cycle assessment (LCA) the different scenarios were comparedin terms of global warming potential (GWP), acidification, eutrophication,energy use and land use.

Tilläggsisolering - lönsamt enligt en livscykelkostnadsmodell?

It is found that the properties of the record years of 1965-1975 is leaking a lot of energy andthese properties are facing a major energy efficiency. From the energy aspect, the facade isafflicted with poor thermal insulation which is a big problem. To address this problem addinginsulation is a good alternative to reduce overall energy consumption of a building. Thewindows on these buildings are also a problem from the energy point of view. Therefore,there are many reasons considered for energy Upgrading.

Environmental impact assessment of energy recovery from food waste in Singapore : comparing biogas production to incineration

As a small and land scarce country, effective waste management is ofoutmost importance in Singapore. In this study the production of biogasthrough anaerobic digestion from the organic fraction of municipal solidwaste (OFMSW) was compared to incineration of the waste. At the momentalmost all of the OFMSW in Singapore is incinerated. Three differentscenarios were compared to the reference scenario (incineration): one with alarge scale biogas plant that can treat half of all OFMSW in Singapore, onewith a medium scale biogas plant about 15 times smaller than the large oneand one with a small scale biogas plant that can treat waste from e.g. ashopping center or a food center.By using life cycle assessment (LCA) the different scenarios were comparedin terms of global warming potential (GWP), acidification, eutrophication,energy use and land use.

E.ON:s transformatorflöde - en studie av återanvändningen av transformatorer i projekt krafttag

Problem StatementAfter the hurricane Gudrun in January 2005 EON Elnät Sverige AB started the project KRAFTTAG, were 17,000 km of the airborne power grid shall be replaced with cables underground. The transformers in the airborne power grid shall be dismounted, renovated if necessary and then conveyed to stations, of type kiosk.Additional new transformers, more than planned, have been bought. This is due to the dysfunctional transformer flow from the demolished power supply to projects, were the new power supply is built, the general picture is complicated, since the reconstruction involves other companies and many employees at E.ON.PurposeThe purpose of this master thesis is to map and understand the existing transformer flow. The objective is to make a recommendation on how to increase the level of E.ON? s transformer recycling.Methodthe authors have worked with a system approach, including both qualitative and quantitative data.

Produktion av Pyrolysolja från kvistrejekt

Fast pyrolysis is a method for converting biomass into three energy rich products: char, gas and bio-oil, where the latter is most interesting.  Pyrolysis is an endothermic process where biomass is heated in an anaerobic environment and, with the right operating conditions, up to 80 %wt bio-oil can be extracted. Key parameters for fast pyrolysis are: stable reactor temperature (~500°C), short residue time for gas in the reactor (<2 s) and a very high heating rate for the biomass. Today there are several different process solutions for fast pyrolysis, where fluidized beds and rotating cones are most developed. Bio-oil has compared to fossil oil: lower heating value, low pH and also polymerizes with time. Because of this Upgrading is desirable for increasing competitiveness.

<- Föregående sida 2 Nästa sida ->