Sök:

Sökresultat:

654 Uppsatser om Transportable buildings - Sida 7 av 44

Vätskekopplade värme- och kylåtervinningssystem Utveckling av ett verktyg för energiberäkningar

According to a decision of the European Commission, measures are to be taken to reduce the use of energy in the EU. The goal is to reduce it by 20 % compared to the current use. This shall be done to the year 2020 (European Commission, 2011). One industry that use large amounts of energy is the construction of buildings which account for almost a third of the energy use (Brogren, 2012). The major part of the energy that is used in the construction industry is not used when the buildings are built, but rather during the rest of their subsequent lifetime.

Utbyggnad Av Eriksberg

During the years of development in the 60s and 70s the need for new housing in Sweden arose. Sweden was going to be the most modern country in the world. This period has later been called ?the time of the big programmes?. One of the parts in this building of a welfare society was a large policy of building politics with few counterparts in history.

Utredning av fastighetsel i ett äldre och ett ombyggt flerbostadshus i Gävle

The residential and service sector in Sweden accounts for approximately 38% of the total energy usage and Sweden has an aim to reduce the total energy use by 20% by 2020 compared to 2008, which means residential sector will have to improve energy efficiency. As part of that a law was instituted by the Swedish parliament that all properties must have an Energy Performance Certificate (EPC) to thereby give the property owners a greater insight into energy use in their buildings and propose recommendations for energy-efficiency measures. On the EPC, a value on the building's energy performance in terms of energy use in kWh / m2 per year is declared, of which electricity is a share of it. Instructions on what to include in the amount facility electricity for running the facilities is regulated by the authority for building, Boverket while SVEBY has made an interpretation of the regulations in their report "Brukarindata bostäder" where they have a table on what should be included in the amount and what not to include.This report is a study of two similar apartment buildings, where one of the buildings recently underwent renovation, to see if the declared amount of energy for electricity, in the EPC, is consistent with the measured value, and whether there has been any reduction in facility electricity in the renovated building after the renovation.The result shows that the measured value of the building electricity was 2.6 kWh / m2 per year, 28,8 %, lower than the declared value in the building that have not undergone a renovation. Calculation of values from previous years (2011) by the same percentage of facility electricity as in the results of the measurements, 56.7%, it becomes clear that the declared value for facility electricity in the EPC of the renovated building do not correspond with reality and that there has been an increase in use of facility electricity after the renovation..

Projekteringsförslag för JM AB av fastighet 3:2 i Bukärr, Särö

The climate changes that are occuring in the world have resulted in that the EU callingfor a 20 % reduction in energy consumption to the year 2020, to reach that goal theEU want the public sector to go forth as a good example. Västfastigheter owns andmanage the hospital buildings in the Västra Götaland region. To be able to reducetheir energy usage Västfastigheter has hired several consulting firms to chart out theenergy consumption on each hospital building. The biggest energy savings potentialhave been calculated and what the cost will be to perform each action. The energyaudit have been completed and stand as the decision basis for Västfastigheter?s choiceon which action packages that should be implemented.

Styrsystem för testriggar till linjära aktuatorer

The climate changes that are occuring in the world have resulted in that the EU callingfor a 20 % reduction in energy consumption to the year 2020, to reach that goal theEU want the public sector to go forth as a good example. Västfastigheter owns andmanage the hospital buildings in the Västra Götaland region. To be able to reducetheir energy usage Västfastigheter has hired several consulting firms to chart out theenergy consumption on each hospital building. The biggest energy savings potentialhave been calculated and what the cost will be to perform each action. The energyaudit have been completed and stand as the decision basis for Västfastigheter?s choiceon which action packages that should be implemented.

Hur kan kostnaden minskas för dörrmiljöer utan att försumma funktionen?

The door and its surrounding, is an important part of all buildings. It often amount to a significant part of buildings total costs. The more demands of functions the largerdoes the costs grow.The purpose of this report is to analyze those demands and how to fulfill them.Another purpose is to examine of which reasons the cost grow and how to avoid it inthe best possible way. The study will be performed in collaboration with Bjerking AB. To define the demands a literature study will also be performed.

Brandsäkerhet i ett småhus

This essay includes the planning and designing of a house as well as writing a rapport about howto increase fire safety in small buildings.More than 6000 homes burn in Sweden every year (Brandskyddsföreningen, 2012c). Thedevastation and the costs are usually very high. This report examines possible measures to reduceboth personal injuries and economic losses resulting from house fires in small buildings.Swedishbuilding regulationsplay a major role when it comes to constructional fire safety. However therequirements inSwedish building regulations are very low for small buildings and this is anargument for raising the requirements.The report shows and describes possible methods to build safer with regards to fire in terms ofmaterials and different building structures. Major focus has been on fire cells but other solutionsare also examined and described.

Byggnadsminnesförklaring : ett långsiktig hållbart skydd?

There are currently 2160 buildings in Sweden that are protected by law with the designation as a cultural heritage building, which is the strongest protection that can be obtained for a building of cultural historic significance. The purpose of this thesis is to research how strong and sustainable the protection of such a designation is and how you can motivate a revocation. Furthermore, this thesis aims to give an overall insight into all cases where there has been a revocation.To achieve the protection of a designation as a cultural heritage building, the object has to be of outstanding interest on account of its cultural historic value. In the first part, this thesis gives a short historic background of the cultural heritage law and its terms, like outstanding interest and cultural historic value. The County Administrative Board's documents about revocation are the main source for this research.There have been 24 cases of revocation and the frequency of such cases has increased in the past ten years.

Den framtida havsnivåhöjningens inverkanpå bebyggelse och infrastruktur : En fallstudie av Värmdö kommun

The sea-level is rising due to climate change. This report inquires into the possibleconsequences of sea-level rise in Värmdö and its archipelago with particular focus on roadsand buildings. Four scenarios with a sea-level rise of 0.5, 1.5, 2.5 meter and a worst casescenario of 3.9 meter are analyzed using a geographic information system (GIS) calledarcMap. The report also examines how Värmdö is taking into account future sea-level rise intheir planning today. The report´s findings show that uplift and sea-level rise cancel eachother out in the scenario with a sea-level rise of 0.5 meter, but that a number of more or lessimportant roads and buildings will be affected by a rise of 1.5 meters.

Flödet av elektrisk och elektronisk apparatur i Sverige 1995 - 2011

The climate changes that are occuring in the world have resulted in that the EU callingfor a 20 % reduction in energy consumption to the year 2020, to reach that goal theEU want the public sector to go forth as a good example. Västfastigheter owns andmanage the hospital buildings in the Västra Götaland region. To be able to reducetheir energy usage Västfastigheter has hired several consulting firms to chart out theenergy consumption on each hospital building. The biggest energy savings potentialhave been calculated and what the cost will be to perform each action. The energyaudit have been completed and stand as the decision basis for Västfastigheter?s choiceon which action packages that should be implemented.

RENOVERING AV MILJONPROGRAMMET TILL PASSIVHUS : Implementering av tysk prefabteknik

Construction accounts for about 35 percent of the total Swedish energy consumption and most of the energy is used by the large housing stock from the so-called ?Million program?. In the national action plan the government has put forward in energy efficiency. It is mentioned that existing buildings account for more than 90 percent of what is expected to be the housing stock within the coming 50 years. In order to meet environmental objectives its required that the existing stock be reviewed for energy efficiency. The goverment is now initiating a national framework with a budget of SEK 300 million Swedish crowns per year for five years, starting in 2010 to achieve the goal on energy efficient buildings. Energy efficiency of buildings in both new construction and above all within the existing stock are addressed.

Föroreningskällor till sjön Anten. En kartläggning och kvantifiering av kväve- och fosfortillförsel

The climate changes that are occuring in the world have resulted in that the EU callingfor a 20 % reduction in energy consumption to the year 2020, to reach that goal theEU want the public sector to go forth as a good example. Västfastigheter owns andmanage the hospital buildings in the Västra Götaland region. To be able to reducetheir energy usage Västfastigheter has hired several consulting firms to chart out theenergy consumption on each hospital building. The biggest energy savings potentialhave been calculated and what the cost will be to perform each action. The energyaudit have been completed and stand as the decision basis for Västfastigheter?s choiceon which action packages that should be implemented.

Nybyggnad till fårproduktion :

In Sweden we need more lambs during March to June. I decided to calculate on a spring lamb production, because to many of the Swedish lambs go to slaughter in the autumn. I counted on 1000 ewes which have 2000 lambs each year, 200 of these lambs stays on the farm and replace old ewes. The buildings are 3600 square meters. I have counted on two different sorts of buildings, the first one is a shed, the second one is three polytunnel sheephouses.

Stadsodling som begrepp i Sverige - bakgrund, nulägesbeskrivning och tänkbar utveckling

The structural rationalization of rural firms in Sweden has led to many new creative ways of developing companies. The agriculture sector is characterized by the need of capital in form of buildings, labor and inventory. The rationalization process has led to free capacity in rural firms when new technology make buildings and inventory not longer necessary for the production process. To get a better cost coverage this free capacity can be used to start-up new business areas that help the rural firm to growth.The study aims to identify factors that motives entrepreneurs in rural firms to develop new business areas. The purpose is also to analyze driving forces that lies behind development of rural firms and the forces that support or not support development in rural firms.The study is built upon five cases that all can be categorized as firms with different size and orientation.

Incitament för energibesparande åtgärder i den byggda miljön

More efficient energy consumption is essential to secure a sustainable future, not least within the building and real estate sector which answers for approximately 40 % of the EU countries total energy consumption. One part of EU: s work to reduce the energy consumption is the directive on energy performance of buildings which among other things have lead to stricter demands on energy performance in new and renovated buildings.One of the difficulties with making buildings more energy effective is that it often demands big investments and although it results in lower operating costs the extent of these savings and therefore also the repayment time can be difficult to decide beforehand. To make it interesting for property owners and also tenants to invest in energy efficient buildings powerful incentives are needed. Favorable loans to energy efficiency projects are one example of governmental instruments that have been tested in other European countries with good results.Reduced operating costs appear to be the main incentive for property owners to make their buildings more energy efficient. The best result of an energy efficiency project is usually achieved by cooperation between property owners and tenants but in order to make that interesting it is important that both parts can profit from the savings.

<- Föregående sida 7 Nästa sida ->