Sökresultat:
3880 Uppsatser om Total cost - Sida 2 av 259
Markberedning med traktorgrävare, prestation och kostnad
This study investigated the performance and cost of scarification with a tractormounted excavator. Due to variations in terrain conditions the performance variedbetween 0.08 and 0.11 ha/E15h and, with a machine cost of 366 SEK/h, the cost ofscarification varied between 3 330 and 4 750 SEK/ha..
Managing IT Costs by ABC
The purpose of this essay is to identify costs for providing First-line and Second-line support, and then allocate these cost to different goods and services (cost objects) being supported. The thesis also intends to improve the overall cost awareness in IT settings..
Triage - hälsoekonomi : resursallokering och kostnadsberäkning för olika proriteringsnivåer inom akutsjukvård
When a person arrives at the emergency ward at the Uppsala University Hospital with his or her symptoms he or she explains the problems and then a priority process starts. The staff evaluate at which emergency level the patient is located in a model called Triage. The Triage model helps to decide the priority need and is based upon templates which point out in which of the 5 categories a patient is to be placed, to eliminate any future risk regarding his or her health. A lower triage level means lower priority but implies better health when the evaluation takes place. To obtain optimal effect of the Triage model the evaluation of symptoms must be reproducible so that patients with the same symptoms are placed at the same triage level regardless of whom among the staff conducts the evaluation.
The purpose of the study was to see if the resources are allocated based on priority level of the patients.
Framtagning av nyckeltal som indikerar kvalitetsbristkostnader : Development of key performance indicators revealing the cost of poor quality
Since the 1980s, companies have taken a larger interest in quality and it´s economic impact within the company. Having the knowledge that it´s not quality that costs money, but it´s rather the lack of quality. The work immerses itself in the field of cost of poor quality and the development of key performance indicators.The thesis is performed at Bufab Holding in Värnamo. Bufab Holding is a trading company which mainly buys and sells C-parts. C-parts include fasteners, other small metal-, rubber- or plastic parts such as wires, springs and electronic fasteners.The aim of this thesis was to make a survey of the cost of poor quality and to find key performance indicators (KPI) for cost of poor quality that can be continuously monitored.
Timeliness cost for agricultural sprayers : weed control in cereal crops
Evaluation of machinery costs is necessary for selecting appropriate farm machinery. Timeliness cost due to untimely operations is an important component of machinery costs. Timeliness costs can be high for crop sprayers, since pesticide application must be carried out within a short time interval. This Master thesis investigated the timeliness cost and the probability of a suitable workday for spraying. Timeliness factors were estimated for four different crops (oats, spring wheat, winter wheat and barley) using historical weed trial data.
Logistiska lösningar för en lönsam byggprocess
This is a study, the purpose of which is to investigate how the construction company Sefab Bygg AB is able to increase its profitability and render a more efficient production process through logistic solutions. The study is made during one of Sefab´s present projects. The project includes sanitary renovation of 650 apartments in the co-operative Opalen in Norrköping.To find out whether changes of logistic routines are profitable or not, it?s necessary to evaluate the Total cost of the changes. A Total cost analysis is a mapping of all the costs for a particular material, on one hand for the present situation and on the other after the change.
Företrädaransvar enligt SFL
This thesis, in the field of healthcare logistics, has been carried out at Hjärt- och Medicincentrum (HMC) at the University Hospital in Linköping during the fall and spring of 2012/2013. The thesis is done by two students at Linköping University at master?s level within the framework of Industrial Engineering and Management.As Sweden's county councils should not make a profit or loss, it is important that the councils are aware of how much care processes cost. Kardiologiska kliniken at HMC in Östergötland?s county council is one of the clinics that are profitable.
Tillåtligheten av drogtester i arbetslivet
This thesis, in the field of healthcare logistics, has been carried out at Hjärt- och Medicincentrum (HMC) at the University Hospital in Linköping during the fall and spring of 2012/2013. The thesis is done by two students at Linköping University at master?s level within the framework of Industrial Engineering and Management.As Sweden's county councils should not make a profit or loss, it is important that the councils are aware of how much care processes cost. Kardiologiska kliniken at HMC in Östergötland?s county council is one of the clinics that are profitable.
Självförvållad sinnesförvirring : Konsekvenser av att fingera tillräknelighet istället för uppsåt vid gärningar som begåtts under självförvållad sinnesförvirring
This thesis, in the field of healthcare logistics, has been carried out at Hjärt- och Medicincentrum (HMC) at the University Hospital in Linköping during the fall and spring of 2012/2013. The thesis is done by two students at Linköping University at master?s level within the framework of Industrial Engineering and Management.As Sweden's county councils should not make a profit or loss, it is important that the councils are aware of how much care processes cost. Kardiologiska kliniken at HMC in Östergötland?s county council is one of the clinics that are profitable.
Hur skall den totala vårdkostnaden för en hjärtprodukt beräknas? : En fallstudie av tre hjärtprodukter vid Hjärt- och Medicincentrum på Universitetssjukhuset i Linköping
This thesis, in the field of healthcare logistics, has been carried out at Hjärt- och Medicincentrum (HMC) at the University Hospital in Linköping during the fall and spring of 2012/2013. The thesis is done by two students at Linköping University at master?s level within the framework of Industrial Engineering and Management.As Sweden's county councils should not make a profit or loss, it is important that the councils are aware of how much care processes cost. Kardiologiska kliniken at HMC in Östergötland?s county council is one of the clinics that are profitable.
Kalkylering av bearbetningskostnader
At a manufacturing company, due to the competition the price is reducedtowards the manufacturing cost. Therefore it is important to maintain control ofones costs and keep calculations up-to-date.This thesis deals with cost accounting at a aluminium-processing company. The report focuses on calculating machine cost per hour since the manufacturing costs are the major part of the total product cost.Managers on the company believe that the costs they use in calculations todayneither is up-to-date nor advantageous in a market aspect and due to that their calculations need to be revised. The machines cost per hour is a major part in the manufacturing calculation. The company wants to provide a competitive price that also covers their costs.
Kostnadsuppföljning avproduktionskalkyler
Calculations are an important part of planning around a construction project. From concept to completion of the project calculation is a tool to try to predict the actual cost. During the production stage in particular, deviations occur which makes the actual cost different from the calculations.This thesis is done in collaboration with JM Residential Stockholm. The study includes a cost follow-up in which a comparison was made between the calculated production cost and actual cost for the five projects. The aim of the study was to observe the most common reasons that a project deviates from the calculated production cost and then summing these causes in a number of categories.
Påverkar goodwill kapitalkostnaden?
Does goodwill affect the cost of capital? Goodwill is an asset which is characterized by much uncertainty regarding both what it is and how much it is really worth. Based on economic theory about information risk and principal-agent problems as well as theory regarding the cost of capital we test for the hypothesis that debt and equity investors perceive goodwill as something risky and hence demand compensation for taking on this extra risk. The proxies used for the cost of capital are cost of debt, beta and the EP-ratio. On a general level we find that increasing the level of goodwill seems to result in higher cost of capital as represented by the three proxies.
Uppvärmning av mjölkgård med ved, flis eller havre :
The background for my thesis is the fact that with rising electricity and oil prices it becomes interesting to calculate on alternative heating systems. I have chosen to calculate upon my parents? farm, which today heats the dwelling house with wood. This is very time-consuming work, time which could be spent on other work.
The main objective for this study is to compare three different heating systems to decide how they differ considering effort and cost.
The result from the calculations was that grain-heating system demanded the least amount of work, but the Total cost was a little higher compared to chips heating. Chips heating required half as much work as today?s wood heating and had a little lower Total costs compared with the corn heating.
Which system to choose largely depends on how the own work is valued.
En kostnadsanalys av energieffektiva flerbostadshus
In Sweden the real estate sector accounts for 33 % of energy consumption and just below 10 % of the emission of carbon dioxide. As a consequence of the external pressure from climate change it?s in everybody?s interest to reduce the energy consumption and thus reduce the emission of carbon dioxide. An additional incentive to reduce the energy consumption is the substantial increase of the energy price since the deregulation of the electricity market in 1996.In this study the techniques that exist to build multi-storey residential buildings with high energy performance will be investigated. Further the study intends to investigate the optimal energy performance from a real estate economic perspective.In order to investigate the optimal energy performance a model has been created with the parameters investment cost, rental revenues, operation and maintenance cost, discount rate and investment horizon.The result shows a relationship between a high investment cost and a high energy performance for newly constructed multi-storey residential buildings.