Sökresultat:
8059 Uppsatser om Time-sensitive - Sida 38 av 538
Kalkylverktyg För Sågklingor
The purpose of this report is to survey Swedex AB?s production costs and to gather all info into a manageable calculation tool. This was made by time and motion studies, interviews of the personnel. All factors were gathered into an Excel chart.The calculation was made according to an additional-charge-method that was considered to satisfy Swedex AB?s goal.
Capacity studies on DeLavals sort gate DSG10
In the dairy production it is necessary to be able to sort cows. Dairy cows are sorted for many different reasons i.e. regrouping into production strings or for treatments i.e. inseminations, pregnancy and health checks, vaccinations or hoof trimmings. One labour saving way of conducting sorting is by using an automatic sort gate.
Vindkraft och rennäring
The Swedish Parliament has decided to increase the share of electricity produced by wind power. The same parliament has decided that the Sami have the right to herd reindeer over 50% of the country's land area. In this literature review the potential impact wind power development and associated infrastructure may have on reindeer husbandry conditions are examined.
The unique physiology of the reindeer enables it to live out of grazing in the arctic climate in the north of Sweden. For reindeer husbandry to be long-term productive and sustainable, it is important that there is enough land for grazing. The research available on how reindeer are disturbed by human activities such as roads, mines, hikers, etc., clearly indicates that the reindeer avoids areas close to such disturbance.
Byte av kontaktdonsgränssnitt för Scania bromssystem
This master thesis was carried out at Scania in Södertälje, Sweden. It investigates the possibility of changing a connector interface that is used when there is a need for splicing the wheel speed sensor and thereby determine the consequences.The problems that exist with the current connector interface occur during assembly, as more time is required to complete a connection in a reliable manner. A complete connection requires joining the male and female connector, insert the connection into a protective retainer and then strap a cable tie on each end of the retainer. This process makes it more time consuming and it requires 20-30 seconds to complete the connection. Solving this problem would save time and enable easier assembly, therefore resulting in economical benefits.This thesis was accomplished through discussions with different sections at Scania, studying available documentations, observations during assembly, writing a requirement specification and contacting suppliers.The aforementioned methods resulted in four connector suggestions, the DT and DTMH connector from Deutsch, MCON connector from TE connectivity and MLK connector from Kostal, each of them compliant with the set demands of the surrounding environment.
Projektplanering inom konsultföretag : en modell för planering, budgetering och uppföljning
BackgroundToday a common approach to solve a complicated problem is to assemble a temporary workforce in order to solve the problem by working together within a project. One of the difficulties with working in projects is to maintain the planned budget. Working hours and costs are often exceeded. Many companies presume that any certain project will succeed, a presumption that leads companies not to anticipate risks involved in a project. In companies today there is seldom time for evaluation or moderation of a project, in order to have time for evaluation there is a great need for an adequate planning of the project.IntentThe intention with this study is to create a model for planning, budgeting and evaluation of projects within consultancy companies.MethodWith the help of interviews and discussions within the group Hamnar och Byggkonstruktioner at Sweco has evidence to present a proposal on planning, budgeting and monitoring been developed.ResultsA model has been developed to ease for consultancy companies to plan, budget, monitor and evaluate projects.
Optimizing amount of straw for growing-finishing pigs : considering time spent in manipulative behaviour
In support to a decision to be made by the Swedish central competent authority on a minimal amount of straw for conventional growing-finishing pigs, a study using 168 pigs provided 7 different amounts of straw (20, 40, 60, 80, 100, 200 or 300 grams/pig/day) was performed. The straw was provided either once or four times per day. Detailed behaviour observations were made using focal animal sampling and continuous recording for one hour between 9 and 10 am and again between 3 and 4 pm. The data analysis is presented in three ways: broken stick model, polynomial trend line and logarithmic trend line. No method was suitable on its own but the use of all the methods simultaneously was found to portray the data in the best way.No significant differences were found when comparing pens provided with straw once or four times per day.
Införande och systemanpassning av Process Engineer i målerifabriken, Saab Automobile AB
Real-time systems are required to answer to external stimuli within a specified time-period. For this to be possible, the systems behaviour must be predictable. The use of active databases in real-time systems introduces unpredictability in the system, e.g. due to their use of active rules. The behaviour in active databases is usually specified in ECA-rules.
Vindkraftens framtida scenarier
In several countries that have been early in the development of wind farms, there is today a second hand market for the used wind turbines. The European Union (EU) has established a waste hierarchy in order to minimize throwaway mentality. The second hand market is a part of this as the steps are to minimize, reuse, recycle, extract energy and landfill.In order to promote the development of renewable energy, there are energy certificates for the producers that provide it, wind power being one type of renewable energy. After 15 years the energy certificates for a specific wind turbine are no longer paid, and after that there are several different scenarios for the wind turbine. The scenarios investigated in this bachelor?s thesis are export of the wind turbine to countries that are not as far along as Sweden in their development towards renewable energy, selling in Sweden to individuals, and recycling of the wind turbine, as it mostly consists of metals and therefore is recyclable.
Potentiell fosforfrigörelse från sedimentet i Bornsjön, sydvästra Stockholm : The potential leakage of phosphorus from sediment in Lake Bornsjön, south western Stockholm
Lake Bornsjön is situated 30 km southwest of Stockholm in a rift valley lake and consist three basins outstretched in northwest-southeast direction. The surface area is 6,7 km2 with a maximum depth of 18,3 meters, a mean depth of 9,8 meters and a retention time of the water of 6,5 years. The drainage area is 42 km2 and consists mainly of arable land (ca 1000 ha) and productive forestry land (2500 ha), but in the drainage area there are also restored and fairly newly constructed wetlands.Today the Stockholm area receives its drinking water from Lake Mälaren, but if there would be any pollution of this source, Lake Bornsjön would act as the water source. The area surrounding the lake was bought already in 1899 by Stockholm Stad for protection of the lake and was taken over 1993 by Stockholm Vatten AB. It has been a water protection area from 1988 and it was also accepted as a nature reserve in 1995.
Vad är ett lyckat projekt ur ett intressentperspektiv? : En studie av Trainee in TIME
AbstractThe concept project is today used in several contexts and has different meaning in different contexts. Lately, projects have been seen as a form of organization and more companies convert from traditional organizing to organizing in a project form. The purpose and focus of today?s project is not only to increase quality and competence development for management but also to integrate different actors in order to e.g. increase customer value.LänsTeknikCentrum AB (LTC) in Jönköping is running different projects in order to support companies in Jönköping County.
Automatisk rengöring av Primary Charge Roller : Invegon Equip AB
Real-time systems are required to answer to external stimuli within a specified time-period. For this to be possible, the systems behaviour must be predictable. The use of active databases in real-time systems introduces unpredictability in the system, e.g. due to their use of active rules. The behaviour in active databases is usually specified in ECA-rules.
Trädens utveckling efter att de har lämnats som naturhänsyn : tillväxt, mortalitet och strukturell förändring 6-18 år efter avverkning
Today green tree retention, together with leaving dead wood, is a common practice with the aim to reduce negative impacts on biodiversity and environment due to clear-felling. To better understand whether this conservation practice also makes a long-term difference, it is important to know what happens to these trees after harvest. Few studies have made an assessment of what happens to retention trees over a longer time period. In this study I inventoried retention trees that were left at clear-cuts six, twelve and eighteen years ago. I carried out a re-inventory of 57 retention patches (divided into free-standing tree groups, small swamp forests and edge zones) and free standing dead trees, spread over 25 previous clear-cuts in central Sweden.
INFORMATIONSSYSTEM FÖR PALLHANTERING : Pallet management software
BackgroundToday a common approach to solve a complicated problem is to assemble a temporary workforce in order to solve the problem by working together within a project. One of the difficulties with working in projects is to maintain the planned budget. Working hours and costs are often exceeded. Many companies presume that any certain project will succeed, a presumption that leads companies not to anticipate risks involved in a project. In companies today there is seldom time for evaluation or moderation of a project, in order to have time for evaluation there is a great need for an adequate planning of the project.IntentThe intention with this study is to create a model for planning, budgeting and evaluation of projects within consultancy companies.MethodWith the help of interviews and discussions within the group Hamnar och Byggkonstruktioner at Sweco has evidence to present a proposal on planning, budgeting and monitoring been developed.ResultsA model has been developed to ease for consultancy companies to plan, budget, monitor and evaluate projects.
Ständiga förbättringar hos Drive Sol Worldwide AB
The purpose with this report is to give structure to the storage area betweenproduction and packaging at Spaljisten AB in Åseda. The purpose is also to givesuggestions for improvements of work tasks and thereby simplify and improve thematerial handling at the packing process.The background of the task is that Spaljisten AB is going to increase theirproduction and thereby they also need to increase the packing rate of theirproducts. They will manage this by installing a new automated packing line andincrease the efficiency of the old manual one. The theoretical background ismostly obtained from literature which contains relevant facts for our report.The storage area has been studied visually in order to search for improvements oftoday?s layout.
Design och implementation av konfigurationsverktyg för funktionsblock
Abstract In high voltage substations there is an increasing demand for computerized equipment, and automation of operation and supervision. The future primary equipment will provide the possibility to collect more information and to provide better control for improved effectiveness. Since ABB has got a large customer target, each product must be custom made to fulfil the customers (often from different countries) demands. Later these products will be configured by engineers who may not be familiar with the tools used at ABB. This is a very expensive and time consuming.