Sökresultat:
392 Uppsatser om Thermo-electricity - Sida 21 av 27
En kostnadsanalys av energieffektiva flerbostadshus
In Sweden the real estate sector accounts for 33 % of energy consumption and just below 10 % of the emission of carbon dioxide. As a consequence of the external pressure from climate change it?s in everybody?s interest to reduce the energy consumption and thus reduce the emission of carbon dioxide. An additional incentive to reduce the energy consumption is the substantial increase of the energy price since the deregulation of the electricity market in 1996.In this study the techniques that exist to build multi-storey residential buildings with high energy performance will be investigated. Further the study intends to investigate the optimal energy performance from a real estate economic perspective.In order to investigate the optimal energy performance a model has been created with the parameters investment cost, rental revenues, operation and maintenance cost, discount rate and investment horizon.The result shows a relationship between a high investment cost and a high energy performance for newly constructed multi-storey residential buildings.
Partnering för bättre samarbete men till vilket pris? : En studie av offentlig beställares argument till partnering
The electric vehicle market has potential to contribute to Sweden?s national goal to have a fossil fuel independent transport sector by 2030. However, the market answers to a lot of challenges making it difficult for the market to fully reach its potential. The volume of electric vehicles has seen a steady increase during the last year (2012), although many of these vehicles are mostly for PR purposes or bought by the public sector that wants to lead by example. Still, barriers in the form of high purchase costs, an anxiety for the limited battery capacity and the lack of standardisation are some of the problems that the market is struggling to solve.
Övertoner i elnät vid Skellefteå lasarett : Harmonics in power grids at Skellefteå Hospital
The goal of this paper is to find out how solar cells can improve energy efficiency on-board M/S Sydfart. The paper is based on a number of energy measurements on board the M/S Sydfart. The solar surface is calculated by measuring the available space for installing solar panels. Global radiation data is taken from STRÅNG's database, the data is then used to calculate the theoretical power produced by the solar cells. Energy efficiency is analysed in two ways.
Utsikten : Hållbara uppvärmningsalternativ för vandrarhemmet på Finnhamn
Finnhamn is a small group of islands in the Stockholm archipelago. At Stora Jolpan, the biggest island, there is a hostel. The main building was built in 1915 and is called Utsikten. The purpose of this project is to on behalf of the Archipelago Foundation (Skärgårdsstiftelsen) find alternative systems that can replace the existing heating system of Utsikten (an oil-fired boiler and electricity heaters) to a system with renewable energy. The alternative system that this project focuses on is a system of solar collectors combined with a wood chip boiler.
Tidsupplösning vid miljövärdering av fjärrvärme : Kontorsbyggnad med solvärmeproduktion - en fallstudie
The demand for environmental assessments on buildings and energy consumption is increasing as well as the energy performance requirements for buildings. At the same time it is increasingly common with self-producers of heat and electricity generation.The main purpose with this master thesis is to investigate how time resolution affects the environmental assessment of energy consumption in office buildings connected to district heating (DH). Environmental assessments were done with both attributional LCA and consequential LCA with system expansion.Fortum´s DH system in Stockholm was analyzed and district heating production was simulated in a Matlab-model. Greenhouse gas (GHG) emissions for the production were calculated. The heat demand of the office Gångaren 16 in Stockholm was simulated in IDA ICE.
Utveckling och konstruktion av dämpare och låssystem för vågkraftverk
The division of Electricity at Uppsala University is developing a wave energy converter(WEC) consisting of a linear generator connected to a bouy at the water surfacethrough a wire cable called the connection line.During extreme conditions, the wave power plant will experience forces up to 500kN, which lead to unnecessary wear and will ultimately cause the failure of theconverter. To prevent this there is a need for a damper.The wave energy converter works at a maximum efficiency when the translator?sare centered with respect to the stator. Due to tidal movements the position of thetranslator can deviate. There for a mechanical divice that will compensate for this isneeded.This report describes the further development of an earlier project where a tidalwave compensator for a wave energy converter of Seabased AB was developed.
Komponentuppdelning av elnätetpå lokalnivå
Sweden will, in accordance with the EU-directive 2003/54/EC, move from post-regulating the electricity power grid-tariffs by using a fictitious grid, to a regulation in advance which uses the actual power grid as a starting point. For this purpose a component breakdown of the grid needs to be made to determine the value of the network and by that the tariff price that is reasonable for the network business in question to charge.The primary breakdown criteria is the voltage-level and type of region. Voltage-level is crucial for the cost and complexity of a grid-part, because the higher the voltagelevel is, there are more and stricter laws and rules to follow. This work is limited to the distributionpart of the grid, in other words voltage levels from 20 kV and below.The type of region is crucial to the type of components you can and want to use. In city environments both overhead-wires and independent substations are undesirable for both practical, safety and aesthetic reasons.
Miljövärdeflödesanalys av Risifruttiproduktionen : En utvärdering av värdeflödesanalys och miljövärdeflödesanalys
This report is the result of a thesis work carried out on the Risifrutti production at the company Procordia Food AB. The thesis is at a master level and is the final work for the author to receive a Master of Science in Innovative production at Mälardalen University. The thesis comprises 30 credits and has lasted for 18 weeks. The thesis is mainly a research on whether it is possible to perform an Environmental Value Stream Map (E-VSM) in a food processing industry and an evaluation if the tools E-VSM and Green Performance Map (GPM) are useful in this type of industry. An extra part to this research is to use the results from the E-VSM and give Procordia Food AB information on improvement potentials in the Risifrutti production. The author has found it difficult to collect some of the quantitative data to the E-VSM, mainly regarding energy, but by using the Value Stream Mapping (VSM) tool and other Lean tools the author was able to identify and quantify several wastes in the Risifrutti production. Recommendations for improvements based on these wastes have been given to the company. In the research part of this report the utility of the Value Stream Map, Environmental Value Stream Map and Green Performance Map in a food processing industry have been analyzed. The author has found that the Value Stream Map has been a useful tool since waste and unevenness in the tact of the production has been identified. The Environmental Value Stream Map and the Green Performance Map are also great tools when a company wants to analyze their environmental impact and then invest in environmental improvements. However, no profound energy analyzes has been done in the Risifrutti production because of the lack of energy meters for steam, electricity and compressed air in the production lines..
Energieffektivisering ombord M/S Sydfart : Med hjälp av solceller
The goal of this paper is to find out how solar cells can improve energy efficiency on-board M/S Sydfart. The paper is based on a number of energy measurements on board the M/S Sydfart. The solar surface is calculated by measuring the available space for installing solar panels. Global radiation data is taken from STRÅNG's database, the data is then used to calculate the theoretical power produced by the solar cells. Energy efficiency is analysed in two ways.
Att veta Gudarnas hemlighet : En sårbarhetsanalys av omständigheterna kring stormen Gudrun med pressure and release modellen
The concept of vulnerability is the capacity or the sensitivity to become damaged. Vulnerability are characterized by one or more of the following terms; a system´s sensitivity to exposure to shock, stress or interference, the state of the system in relations to a threshold of damages, and the system´s ability to adapt to the changing circumstances. Vulnerability in this study is referring to the sensitivity of the circumstances that lead to sustainable livelihood that can´t be maintain and that there is an inability to cope with and manage stress. The choice of making a study in this area is based on that action needs to be taken to moderate the vulnerable aspects of society, in this respect in relations to storms. Analyzes of the social vulnerability to climate change or natural events is needed for effective actions.
Bojkonstruktion
The division of Electricity at Uppsala University runs a project called Lysekil project, they have designed a buoy that uses the waves to create electric power from a generator attached to the bottom of the sea.Uppsala University is closely connected with the company Seabased and the university makes use of their facilities in Lysekil. When they designed the buoy issues occurred, the geometric design was flawed, brackets with a short shelf life and it is generally uneconomic.A study visit was done in Lysekil on Seabased facility. With this visit the project started, which is to improve the design of the buoy and the attachment of wires leading to the generator. In this project we have chosen to use a beam system with three beams that are attached to the buoy. Then a wire attached to a plate that sits between the beams will be leading to the generator. Two proposals for construction are created, what distinguishes them are the brackets between the beams and the buoy.From these constructions, the design that is considered most optimal for our project is chosen.All parts of the buoy have been modeled and the drawings are designed in ProEngineer software.The two constructions are compared with each other, but the whole focus is on the second and final structure. The report begins with an introduction describing Lysekil project, and a task description of our project.The project aims to produce an optimal buoy that will be easy to design, materials restrictive with good durability and an economical solution.Wave power true function has been studied, mechanical and finite element analysis of beams, buoy and plate design.This has been presented in this report, where in the various chapters can read more about the processes. Although the relevant facts and information on this project and buoy development is included.
Förändringar av marknadsdesign och deras påverkan på balanshållningen i det svenska kraftsystemet : En kartläggning och analys av de balansansvarigas arbetsgång
A future expansion of wind power in the Nordic power system makes the balancing for the transmission system operator Svenska Kraftnät (SvK) more complicated. Up to the hour of delivery the balance responsible parties? (BRP) makes prognoses and plans, for consumption and production, to help maintain the balance in the electrical grid. How well this is accomplished is affected by the setup of the market design. Therefore SvK has proposed the following possible changes in market design: Increase the imbalance costsIntensify the regulation of imbalancesIncrease the temporal resolution on the different marketsPresent the prices for balancing power in real-timeModify the balancing market to simplify auction of consumption bidsA mapping over the BRPs? processes within planning and trading on the day-ahead, intra-day, and the balancing market has been performed in this thesis.
Ombyggnad av flerbostadshus : Hur påverkas hyresgästerna av en ombyggnad
During the years 1950-75 was the construction of building apartments in high speed. A rapidly growing reconstruction requirement is the consequence of the rapid construction speed in these years. The technical lifetime of the different parts of the buildings is about to end and the needs for reconstruction is huge. One of Sweden's national environmental objectives is to reduce the urge of energy in buildings. This calls for radical measures to implement energy efficiency of existing assistance particularly in the assistance that is now facing reconstruction.
Regeringens miljösatsningar och deras förhållande till en hållbar livsstil hos det svenska folket : En studie av biståndssatsningars påverkan på hållbar livsstil i givarlandet
Swedish government aid is divided into three main themes: democracy and human rights, the environment and climate, and gender equality and women's role in development. These three themes in aid are considered by the government to be vital in order to fight poverty and create fair and sustainable development. This study will examine two of the four focus areas designated under the theme of "environment and climate". The study observes the relationship between projects in energy and water and how it promotes a sustainable lifestyle. A survey on environmental habits will be conducted.
Underlag till energieffektiviserande åtgärder i nätstationer
Umeå Energi are working towards a goal, that in the year of 2018, they will be completely climate neutral. As a part of this, one target is to reduce their grid losses by 4 % of the 2012 level, which corresponds to an overall reduction of the grid losses of just over 1.7 GWh. In many residential areas, the distribution grid is designed and rated for electric heating as the heating in the houses. As many of the houses later has been converted to other types of heating, their electricity use has decreased and the total power output from many of the secondary substations has decreased significantly. Because of this, many of these stations today are well oversized, which in turn means that the energy losses in these stations are unnecessarily high.In this degree project, 25 secondary substations have been studied, all located in residential areas in and around central Umeå.