Sök:

Sökresultat:

265 Uppsatser om Thermal insulation - Sida 16 av 18

Stomme i småhus ! : - En teoretisk studie av olika bärande vägglösningar !

This report aims to examine the design of a passive house. The design addresses the selection ofmaterial, sizing and selection of both building services systems and building technical features suchas load-bearing framework and moisture control. Interior layout is designed for a family of twoadults and one child.A big part of the report is devoted to an in-depth comparison of three different wall constructions ofpassive house standard. The structures that have been compared are a lightweight timber structure, aheavier concrete structure and a sandwich wall of the brand Weber Leca. The report covers variousaspects such as air flow, wall thickness, the risks associated with the construction, U-value, thermalbridges, power consumption, price, and assembly costs.

Kartläggning av OFP och defektrelaterade parametrar : Inriktning på termisk utmattning

I både kvalitets- och kontrollarbete finns det behov att kunskapsmässigt komma så nära verkligheten som möjligt vid fastställande av defektparametrar för oförstörande provning (OFP). Orsaken är att olika acceptanskrav och bedömningsgränser är svåra att klarlägga när man inte kan förlita sig på att uppgifter är realistiska. I projektet har olika erfarenheter använts för att få en bättre helhetsbild i området för defektparametrar och oförstörande provning.Denna rapport redovisar den inledande delen av forskning och utvecklingsprojektet PLANT 2, där olika defektparametrar kartlagts och en teoretisk bedömning utförts med avseende på hur signalsvaret påverkas för OFP-metoderna virvelström (ET) och ultraljudsprovning (UT) i form av puls-eko (PE) och ?time-of-flight-diffraction? (TOFD).Definitionen av redovisade defektparametrar följer i stort SKI-rapport 95:70 [1]. Defektparametrar i denna rapport redovisas i bilaga 1.Vid bedömningen av defektparametrarnas inverkan på OFP-tekniker, har drift¬inducerande defekter och tillverkningsdefekter hanterats separat.

Kartläggning av OFP och defektrelaterade parametrar : Inriktning på termisk utmattning

I både kvalitets- och kontrollarbete finns det behov att kunskapsmässigt komma så nära verkligheten som möjligt vid fastställande av defektparametrar för oförstörande provning (OFP). Orsaken är att olika acceptanskrav och bedömningsgränser är svåra att klarlägga när man inte kan förlita sig på att uppgifter är realistiska. I projektet har olika erfarenheter använts för att få en bättre helhetsbild i området för defektparametrar och oförstörande provning.Denna rapport redovisar den inledande delen av forskning och utvecklingsprojektet PLANT 2, där olika defektparametrar kartlagts och en teoretisk bedömning utförts med avseende på hur signalsvaret påverkas för OFP-metoderna virvelström (ET) och ultraljudsprovning (UT) i form av puls-eko (PE) och ?time-of-flight-diffraction? (TOFD).Definitionen av redovisade defektparametrar följer i stort SKI-rapport 95:70 [1]. Defektparametrar i denna rapport redovisas i bilaga 1.Vid bedömningen av defektparametrarnas inverkan på OFP-tekniker, har drift¬inducerande defekter och tillverkningsdefekter hanterats separat.

Färgkomponenter som avgår vid bandlackering

På SSAB i Borlänge har man upptäckt att avgaser från färgen förorenar ugnarna vid härdning. Avgaserna består av lösningsmedel och andra flyktiga föreningar som sedan förkolnas och faller ner på lackerade plåtband. För att komma runt det här problemet har SSAB tillsammans med Akzo Nobel Industrial Finishes AB, i Gamleby, tillverkat en färg som inte ska ge ifrån sig något lösningsmedel och på så sätt minska bildandet av föroreningar i ugnarna. Färgen heter NOVA GreenCoat och innehåller rapsmetylester, RME, som är ett reaktivt lösningsmedel och ska binda till bindemedlet i färgen och på så sätt hindras från att avgå vid härdning.Syftet har varit att undersöka om en viss metod fungerar bra för att samla upp avgaser vid härdning. Avgaserna analyserades med GC-MS och härdningen studerades med FTIR.

Bergkyla och bergvärmeutredning för industrilokalen Rödbergsmyran 5 i Umeå, Västerbotten.

Grubbe Ventilation AB is a sheet metal and ventilation company who provides design, installation, service, and repair of ventilation. The company is expanding their business by building a new facility in Umeå, Västerbotten. The property is designed to be used for both office and industrial work.Grubbe Ventelation AB has not yet decided upon wish system which is to be established to provide the building with heating and cooling. The consulting firm Umeå Projekt Team has therefore been asked to investigate the possibilities to invest in geothermal- heating and cooling.If the investigation of a geothermal heating- and cooling system would provide favorable results it would be a very appropriate alternative that provides energy at low costs and are an environmentally friendly option as the energy comes from stored solar energy in the ground is provided by stored solar energy in the ground.The facility ´s heating and cooling consumptions are calculated in the program BV2 and the result indicate a heating demand of 185 000 kWh per year due to thermal transmittance, transmission losses, heating of warm water and a cooling requirement of 5500 kWh.Three different systems of geothermal heating and cooling were tested in the computer program Energy Earth Design. The results show no difference in the dimensioning of the drill hole if merely heating were to be used or both heating and cooling were to be established.

DELMIA V6 Machining

Staden Sulaymaniyah ligger i den kurdiska delen av Irak och har på senare år utvecklats då många valt att flytta från landsbygden till den centrala delen av staden. Nybyggandet sker under tidspress och långsiktigt hållbara lösningar prioriteras inte. Målet är att ta fram ett hus som är anpassat för majoriteten av befolkningen och samtidigt få ett bra och energieffektivt inomhusklimat. En faktainsamling genomfördes för att ge bakgrundsinformation till projektet. Vidare gjordes en planlösning till huset i AutoCAD vilken har använts som grund till utformningen av huset och smarta lösningar.

Legetimus AB - En kundorienterad marknadsanalys

Staden Sulaymaniyah ligger i den kurdiska delen av Irak och har på senare år utvecklats då många valt att flytta från landsbygden till den centrala delen av staden. Nybyggandet sker under tidspress och långsiktigt hållbara lösningar prioriteras inte. Målet är att ta fram ett hus som är anpassat för majoriteten av befolkningen och samtidigt få ett bra och energieffektivt inomhusklimat. En faktainsamling genomfördes för att ge bakgrundsinformation till projektet. Vidare gjordes en planlösning till huset i AutoCAD vilken har använts som grund till utformningen av huset och smarta lösningar.

Mekanisk integration av en IR-detektor i en Stirlingkylare

The master thesis ?Mechanical Integration of an IR-detector in a Micro Cooler? has beenperformed at FLIR Systems AB in Danderyd. FLIR Systems is a world leader in the design,manufacture and marketing of thermal imaging camera systems.The thesis project is divided into to two areas, Production Method and Noise.The Production Method concerns the positioning of a detector on the cold finger within the IRcamera.The detector has to be positiond with very high accuracy at the center of the cold finger,so it can be placed in line with the optical axis to avoid movement of the picture during zooming.The positioning of the detector is at present done with the help of specially designed guides on aplate on top of the cold finger. The design workes well but the special machining needed for thisplate is very expensive.The goal concerning the production method was to derive a new more cost effective method forthe assembling and positioning of the detector on the cold finger by replacing the guides on theplate with a reusable equipment or some other alignement operation.Several concept ideas have been generated with the help of concept generation methods in theform of concept classification trees and concept combinational tables. Two of these conceptswere selected to be further refined.

Prefabricerade Passivhus

European Union has made a new decision that all new built houses by 2020 shallbe near-zero energy houses. Boverket?s definition of near-zero energy housesintends buildings with good energy performance in which a proportion of theamount of energy that must be added to the building is made of renewable energy.Passive House is a set of requirements from FEBY designed to build energyefficient buildings. This is achieved by reducing loss of heat through the buildingenvelope and to take advantage of the passive heat from solar radiation,installation and heat sources like people living in the house.This project has been made with help of Anebyhus and one of their model houseshave been examined from the report?s issues, including Anebyhus?s energyperformance, requirements for the manufacturing and assembly, how theenvelope must be improved to fulfill the requirements for the Passive House andwhat energy calculation programs are available on the market.The report aims to provide solutions for energy efficient houses that are adaptedfor production of house building.Two visits to Anebyhus has been done to study their manufacture and assemblyof building elements.

Effektivisering vid produktion av järnvägsbro

Järnvägsbron vid Årstaberg kommer när den är klar att mäta 1,4 km, här passerar över 550 tåg per dygn. Bron är en del av projektet Citybanan och kommer att fungera som en spårväxel som styr fjärr-, regional- och godståg till den gamla östra Årstabron. Pendeltågen kommer då färdas på bron över Årstaviken och in i den nya järnvägstunneln vid Södra station.Entreprenaden gick från början till danska företaget Pihl och Son som efter en del problem gick i konkurs, underentreprenören Züblin fick då ta över projektet. Med en ny platsledning gjordes en hel del förändringar på arbetsgången och arbetsmomenten. Från 4 veckor per sektion, där en sektion mäter ca 30 meter lyckades Züblin tillslut effektivisera till 2 veckor.

Energieffektivisering på Vista

Sweden has distinct seasons with cold winter and temperatures down to minus 25 ?C andpleasant summers with temperatures above 20 ?C. During spring and autumn there could becomechallenges with precipitation. The diverse climate in Sweden affects many homeowners. For thepeople living in leisure boats and permanent housing boats the seasonal changes are clearlyimpacting their economy and the indoor climate.

Kemin bakom framtidens avgasrening : En studie av ureasönderfall under kvävgasatmosfär

The purpose of this work was to provide a better understanding of urea?s decomposition and byproduct formation in an SCR system on heavy trucks. In my experimental setup with TGA-DSC-FTIR (a combination of two thermal analysis methods and a method for gas phase detection), an FTIR method for urea in the gas phase was developed for the qualitative and quantitative determination of urea and its decomposition products. Chemicals such as urea, biuret, cyanuric acid and melamine of p.a. quality were used in this method development. Beforehand, there was no FTIR method available to detect these substances; hence, the aim of this work was to develop an FTIR method to understand the degradation chain of urea. The combination of TGA and DSC was used for analysis of different samples, where urea, biuret, cyanuric acid and melamine in varying amounts have been weighted in for various experiments in order to study the temperature at which a phase transition or reaction occurs, i.e.

Energieffektiva bostäder i Kurdistan - Förslag på bostadshus i den kurdiska delen av Irak

Staden Sulaymaniyah ligger i den kurdiska delen av Irak och har på senare år utvecklats då många valt att flytta från landsbygden till den centrala delen av staden. Nybyggandet sker under tidspress och långsiktigt hållbara lösningar prioriteras inte. Målet är att ta fram ett hus som är anpassat för majoriteten av befolkningen och samtidigt få ett bra och energieffektivt inomhusklimat. En faktainsamling genomfördes för att ge bakgrundsinformation till projektet. Vidare gjordes en planlösning till huset i AutoCAD vilken har använts som grund till utformningen av huset och smarta lösningar.

Jämförelsestudie av tilläggsisolering

Rapporten behandlar och utvärderar tre olika isolermaterial, Polyisocyanurat (PIR), grafitcellplast och mineralull, vid tilläggsisolering av miljonprogrammets byggnationer.  Stora delar av miljonprogrammet är nu i behov av upprustning. Samhällets skärpta krav gällande energiförbrukning gör att nya rationella metoder och material krävs för att tillgodose ställda krav. Att tilläggsisolera är en del i denna upprustning, och eftersom valet av isolermaterial ofta faller på gamla beprövade metoder och materialval, såsom mineralull, syftar denna rapport till att öka kunskapen om alternativa, mer högpresterande isolermaterial.Isolermaterialens egenskaper tas först upp och behandlas i en generell jämförelse där ekonomiska och tekniska aspekter beaktas.För att konkretisera och påvisa utfallet i ett specifikt fall genomförs en studie för ett referensprojekt, kvarteret Hundlokan, som ägs och förvaltas av Fastighets AB Förvaltaren. I studien undersöks tre olika alternativ för vart och ett av materialen vid tilläggsisolering utvändigt av Hundlokans fasader. Samtliga alternativ ställs sedan mot varandra och utvärderas med hjälp av: fukt-, U-värdes-, energi-, kostnads- och LCC-beräkningar (livscykelkostnad).Enklare fuktberäkningar som påvisar relativ fuktighet (RF), ånghalt och temperatur i väggens olika skikt genomförs.

Uppvärmd konstgräsplan : Beräkning av utnyttjningstid för en uppvärmd konstgräplan med alternativa rörplaceringar

For Skattkärr IF a turf field with warming has been projected to increase field?s utilization hours and to have a longer period for athletes to perform their activities outdoors. The technique chosen to heat the plan is a type of a geothermal heating system without a heat pump. The brine, which is water with 30% ethanol, collects heat from the borehole and discharges it to a coil in the field. There is at position 11 boreholes but it is planned to increase the number to 31, which is the design for the facility.

<- Föregående sida 16 Nästa sida ->