CFD simulering av kallras : Undersökning av temperatur- och luftbeteende intill höga glasfasader och i vistelsezon med golvvärme som en värmekälla
Glass has sophisticated front properties and are used as facades in high buildings. During cold periods, these glass facades could cause thermal discomfort, due to cold downdraught. Cold downdraught can be countered by placing heaters under glass surfaces. Nowadays technology offers highly insulating windows, which is why there is an interest to investigate the indoor climate with only underfloor heating. The research in this area is limited, and few empirical methods are available.
Pellets - en framtidsmarknad?
With higher prices for oil and increased focus on fossil fuels impact on the environment the heating sector are searching for alternative fuels. Pellets are a quite new product whose production has risen exponential in recent years. Today there are small-, medium-and large-scale users, where the large-scale consumers are the heating sector. The heating sector is mainly using oil to cover the increased demand during cold periods.
The purpose of this study is to analyze the potential of pellets if it would replace thermal power plants oil and coal. The study will also analyze the economic impact a conversion would mean for a heating plant and if the pellet is a reasonable substitute.
2008 statistics from the Swedish district heating association were analyzed and a calculation was performed to determine how many tons of pellets is needed to replace coal and oil.
Kostnadsuppföljning avproduktionskalkyler
Calculations are an important part of planning around a construction project. From concept to completion of the project calculation is a tool to try to predict the actual cost. During the production stage in particular, deviations occur which makes the actual cost different from the calculations.This thesis is done in collaboration with JM Residential Stockholm. The study includes a cost follow-up in which a comparison was made between the calculated production cost and actual cost for the five projects. The aim of the study was to observe the most common reasons that a project deviates from the calculated production cost and then summing these causes in a number of categories.
Närklimat vid avvänjning av smågrisar :
SUMMARY
Several studies have shown that weaning pigs are in great need of heat. The reason for this is
mainly because the pigs are given very little feed just after weaning. Some of the pig producers
of today have tried to get along with these problems by building some kind of hut for the
pigs. Some of these pig houses have been included in this study.The study has shown shortcoming
functions for the pig cottage. The expected heat increase has not occurred.
Värmeförluster vid utvändigt placerade ventilationssystem
To be able to handle tomorrows need for limited energy consumption we need to reduce our use of energy. The building sector stands for around 40 % of all energy consumption in the society. The government has put up a goal to reduce the energy consumption in our buildings with 20 % by year 2020 and 50 % by year 2050 compared with year 1995. To be able to do reach that goal we need a more energy efficient building stock.The main part of the energy used in our buildings is used for space heating. By installing ventilation systems with heat recovery on the exhaust air it is possible to use the heat-energy in the exhaust air to warm up the incoming air.
Energihushållning och varsamhet för äldre byggnader : Chefsbostaden i Strömsholm, ett timmerhus från 1900-talets början
This report is the result of a degree project in building engineering, at an advanced level. The project evaluated a building from a technical and historical point of view, and focused on its energy consumption, particularly the energy used for heating. The building in question was a small apartment building in Strömsholm, Sweden. It was made in 1902, from vertical logs, a not so common form of the traditional log house. The goal of the project was to evaluate if the energy consumption could be reduced in accordance with building preservation regulations, that is without damaging any of the building?s cultural or historical values.The building was surveyed with the help of archive and literature studies, interviews and inspections.
TILLFÄLLIGA EFFEKTTOPPAR I FJÄRRVÄRMEN : Kan man med hjälp av lagrad värme undvika att de uppstår i betonghus?
Climate and environmental issues is now high on the agenda. We live in a generation that must try to solve some major environmental problems. Buildings and habitations account for approximately 40 % of Sweden's total energy today. To reduce this figure, as needed, more research in the field of energy efficiency is required.This thesis concerns the heating of buildings. The load on district heating is heavy during certain times of the day.
MOLNU : Att utveckla ett gemensamt gränssnitt
Climate and environmental issues is now high on the agenda. We live in a generation that must try to solve some major environmental problems. Buildings and habitations account for approximately 40 % of Sweden's total energy today. To reduce this figure, as needed, more research in the field of energy efficiency is required.This thesis concerns the heating of buildings. The load on district heating is heavy during certain times of the day.
Metoder för lastprioritering i fjärrvärmecentraler
A problem in the field of district heating is the oil burners needed to provide power when a peak load occurs. One possible way of reducing the needed amount of oil is to reduce the power demand for space heating in the district-heating substations when the need for district heating water exceeds a certain limit. This can be done by use of a locally working controller function.In this Thesis the options concerning load priority are evaluated. To evaluate the potential for using controller functions concerning peak load priority an experiment was brought out in a chosen district-heating substation. The impact on the indoor thermal comfort during a heat reduction was also taken into account.
Comparative analysis of Thermal Barrier Coatings produced using Suspension and Solution Precursor Feedstock
The research work performed in this thesis has been carried out at the Production Tech-nology Centre where the Thermal Spray research group of University West has its work-shop and labs.This research work has been performed in collaboration with the International Advanced Research Centre for Powder Metallurgy and New Materials (ARCI), Hyderabad, India.First of all, I would like to express my sincere thanks and gratitude to my supervisors Dr. Nicolaie Markocsan and Dr. Nicholas Curry for their guidance, great support and valuable suggestions without which this work could not have been possible. I would also like to thanks Prof. Per Nylén for keeping faith in me and providing me an opportunity to work at PTC, which is a great place to perform research.
Beräkning av värmeenergiförluster i flerbostadshus genom analys av den totala fjärrvärmeenergianvändningen :
This thesis has been carried out on behalf of IV Produkt AB and intends to set an average ratio of thermal energy losses in apartment buildings that were built during the 1960-1990. This shall be derived by analyzing the total district energy consumption that has been divided into three parts: heat energy losses (the actual heating requirements), the heating of domestic hot water and heating energy consumption for the controlled ventilation.Three different residential areas that were built during the years 1962-1966 and one that was built in 1993 has been analyzed. All residential areas are located in Växjö urban and contains between four and six apartment buildings.The analyzed objects have a mechanical exhaust ventilation systems and district heating as the heating method. No own laboratory work or experiments have been done in this thesis, the calculations have been done on the basis of parameters from VEAB, interviews with property managers, and literature studies. By calculations, we have got a result that is reported in Chapter 6.
Undersökning av förskolan Temmelburken certifierad enligt Miljöbyggnad : Termiskt klimat, energianvändning och höjning av certifieringsnivån
WSP building physics in Stockholm has certified the preschool Temmelburken in Bromma with the system of certification Miljöbyggnad. The rating of the building became BRONZE. In this thesis the preschool has been investigated with respect to the three areas: thermal climate, use of energy and improving of the level of certification. The thermal climate at the preschool has been investigated by a questionnaire survey and by measurements in order to do comparisons between the results from the two investigations as well as with the results of the simulations that WSP has done at the certification of the preschool. The differences between the results from the simulations and the questionnaire survey for winter as well as from the measurement performed with a comfort meter the 19th of March are concidered to be reasonably small since they give rise to the same rating according to Miljöbyggnad. Operational data for the use of energy for the preschool have been obtained in order to do comparisons with simulations performed by WSP and Svenska Besiktningar AB. The comparison shows that the simulated values for the specific use of energy are lower than what the real specific use of energy would be for the preschool, since just the operational data for the heat energy is higher than the simulated values. At the investigation of the possibility of improving the level of certification it was found that the rating of the preschool can be raised from BRONZE to SILVER by improving the ratings of the ?thermal climate summer? and the ?daylight?.
Tillämpning av högpresterande isolering : PIR-isolering - ett effektivt isoleringsmaterial
Högpresterande isolering är en typ av material som finns tillgängligt men inte används på den svenska marknaden i den utsträckning som de bör göra. I denna rapport kommer det högpresterande isoleringsmaterialet PIR att ligga i fokus och det jämförs främst med det traditionella isoleringsmaterialet cellplast men paralleller dras även till mineralullen.PIR- isoleringen har 40 % bättre värmekonduktivitet än cellplasten och detta innebär att materialet har bättre isoleringsförmåga som bidrar till tunnare konstruktioner. Isoleringen är därför idealiskt att använda för passiv-, lågenergi och nollenergihus. En annan egenskap som utmärker PIR- isoleringen är dess brandegenskaper som uppfyller en högre brandklass än cellplasten, trots att det är ett plastmaterial.PIR- isoleringen är ett dyrare material, dock sparas pengar in redan vid produktion då fukt- och vindskydd kan uteslutas i en konstruktion. Om högre energikrav ska uppfyllas kan pengar även sparas in på sikt genom lägre energikostnader..
Optimering av OTEC-system
Ocean Thermal Energy Conversion, OTEC, is a sustainable energy conversion technology that is not yet commercialized. OTEC is a technology that utilizes the temperature difference in oceans between the warm surface water and the cold water at 1 000 m depth to run a Rankine Cycle. This technology can produce electricity and provide synergies like fresh water, air conditioning and aquaculture. A simulation program for three alternative OTEC systems has been created in order to decide which OTEC system is most profitable; closed, open or hybrid system. In this simulation a production cost analysis is performed in order to investigate and decide which one of the three systems that has the lowest production cost. The production cost analysis also analyzes if the profitability is affected by the size of the facility. After these analyzes, the most profitable of the three different OTEC-systems is expanded by an installation of solar collectors in order to see if the thermal efficiency is improved. The result shows that the most profitable system varies with the size of the facility.
Solenergi på Nya Karolinska Solna
In today?s society climate change has grown to one of the largest global issues. To reduce emissions of greenhouse gases, large changes of the energy system are required. An increasingly popular solution is investments in local production of renewable energy resources like wind, solar or geothermal power. The following report examines the possibility for implementing a solar power plant on the new hospital Nya Karolinska Solna. Two different technologies for extraction of solar energy has been studied, solar thermal collectors to meet the need of heating and solar cells to satisfy the need for electricity linked to operating the hospital building.