Sök:

Sökresultat:

556 Uppsatser om Textile installation - Sida 28 av 38

Villkor under garantitid i entreprenadförsäkring, en jämförande studie.

In Sweden there is no legal regulation for the obligations and responsibilities between the contracting parties within the construction, civil engineering and installation sector. To clarify uncertainties regarding the liability, actors from theses sectors have agreed upon a voluntary regulation, called the General Conditions of Contract.When insurance companies want to enter the Swedish construction insurance market, they face a regulatory framework that not only regulates the construction market, it also imposes requirements on terms and conditions that must be included in the construction insurance. These terms are perceived as ambiguities and create difficulties and inhibit the ability for these insurance companies to offer competitive insurances. One of the terms that create these difficulties is the guarantee period, which is period of time starting from handing over the construction project to the employer, during this period the contractor still has the responsibility for the construction project. The guarantee period regulated by the General Condition of Contracts differs from the international use of the term both in length and in content.

Installation av grundvattenrör för användning inom undervisning

Den dokumenterade nyttan med att undervisa på ett varierat vis har gjort att Uppsala universitet vill ge sina hydrologistudenter möjlighet till mera fältarbete. Detta skall göras genom att installera grundvattenrör i vilka grundvattnets nivå samt kemiska sammansättning kommer att undersökas. Detta ställer krav på att området där rören installeras har en sådan geologi och topografi så att fältarbetet blir givande. Därför eftersöks områden med egenskaper som ger variationer mellan rören. Variationer i grundvattennivå förväntas främst uppkomma av olika lagerföljder eller en lutande markyta.

Ip-telefoni med Skype som ett alternativ till PSTN för privatanvändare

The project is a practical and theoretical test of IP telephony with Skype in order to form a base for a comparison between IP-Telephony with Skype and the Public Switched Telephony Network (PSTN). PSTN is the common standard that most of us use for telephony today. The objective for the study is to simplify the choice between PSTN and IP-Telephony for the Swedish private customer user group. The project is supposed to answer the following questions. - How easy is it to start using IP-telephony with Skype? - How is the quality of IP-telephony compared to PSTN? - Are all services provided by PSTN available and accessible using the IP-solution? - How are the usability and the availability of support with IP telephony? - Is IP-telephony a cheaper solution and in that case under which circumstances? Within the project a collection of practical and theoretical tests have been performed to be able to form an opinion on the IP-solution in the following areas, installation, function, quality, usability, costs, accessibility and security.

FRISTADS ? Supply Chains, från tråd till arbetsbyxa

The Swedish Textile industry has since the beginning of the 70-ties moved their production to countries with cheap labour further and further away. The production in the Baltic countries and Asia has become reality for many Swedish manufacturing companies. With today?s technology the communication with remote countries has ceased to be a problem. The difficulties have instead turned out to be more focused on transportation of goods and just in time deliveries to Sweden.

POP UPP Café, med skoven som nabo och Pallet Pavilion : en studie av tillfällig landskapsarkitektur i staden

Av tradition förknippas landskapsarkitektur med permanenta lösningar, men under de senaste åren har den tillfälliga landskapsarkitekturen fått allt större genomslagskraft världen över. Projektens syfte, upphovsmakare, utformning, tidsspann, skala och inverkan varierar. Syftet med denna uppsats är att identifiera vad begreppet tillfällig landskapsarkitektur är samt analysera hur sådan arkitektur kan inverka på människor och städer. Tre projekt valdes ut som exempel att studera: POP UPP Café i Uppsala, Med skoven som nabo i Århus och Pallet Pavilion i Christchurch. En studie av projektens utformning och den respons de fick exemplifierar den tillfälliga landskapsarkitekturens uttryck och varierande inverkan beroende på plats, tid, sammanhang och brukare.

Integration av en CR-insprutare i enforskningsdieselmotor och undersökning avmultipelinsprutning

SammanfattningI utvecklingen av den encylindriga forsknings-diselmotorn Hatz 1H30 på TechnischeUniversität München har tidigare en ottoinsprutare använts i kombination med ettcommon rail-system som en temporär lösning. Ett common rail-system ger möjlighetenatt separera regleringen av insprutningen från de mekaniska komponenterna av motorn.En common rail-insprutare gör det möjligt att göra flera insprut varje arbetscykel ochtillhandahåller möjligheten att elektroniskt variera timingen av insprutningen.Efter att en marknadsundersökning har gjorts bland huvudtillverkarna av injektorerinköptes en Bosch CRI2 injektor från en BMW M47N-motor. Det förra cylinderhuvudetvar anpassat för en ottoinjektor och var därför tvunget att designas om. En konstruktiongjordes för att fästa injektorn och för att försluta förbränningskammaren.För att styra injektorn behövs ett flertal signaler för att utvärdera vevaxelpositionen ochbetämma insprutstimingen. Behandlingen av dessa signaler och mjukvaran för styrningvar först testade med en AFT PROtroniC motorstyrenhet för sig själv i en provrigg meden signalgenerator.

Ip-telefoni med Skype som ett alternativ till PSTN för privatanvändare

The project is a practical and theoretical test of IP telephony with Skype in order to form a base for a comparison between IP-Telephony with Skype and the Public Switched Telephony Network (PSTN). PSTN is the common standard that most of us use for telephony today. The objective for the study is to simplify the choice between PSTN and IP-Telephony for the Swedish private customer user group. The project is supposed to answer the following questions. - How easy is it to start using IP-telephony with Skype? - How is the quality of IP-telephony compared to PSTN? - Are all services provided by PSTN available and accessible using the IP-solution? - How are the usability and the availability of support with IP telephony? - Is IP-telephony a cheaper solution and in that case under which circumstances? Within the project a collection of practical and theoretical tests have been performed to be able to form an opinion on the IP-solution in the following areas, installation, function, quality, usability, costs, accessibility and security. In order to study usability, a test group of ten persons have been used to evaluate the usability of the system.

 Solenergi En del i ett långsiktigt, hållbart byggande

The sun is essential to life on earth and no matter where you are, there is a constant need ofenergy. Nearly 800 000 years ago man learned for the first time to use fire in a controlled way.Since then, fire has given us the opportunity to inhabit places despite a cold climate. In Swedenthe resident sector accounts for a major part of the total consumption of energy. In a time whenenvironmental issues and greenhouse effects are increasing, we also see a future of rising energyprices. With this perspective, we have in this bachelor thesis in the Building Environment at theRoyal Institute of Technology, KTH, in Stockholm decided to focus on the renewable energysource, solar energy.The energy from solar radiation is a free resource and does not have any negative effects uponthe environment.

Livscykelanalys för koldioxidutsläpp från flerbostadshus

Today, about 15 to 20 percent of Sweden?s total emission of carbon dioxide can be traced to the household sector. By examining apartment blocks in a life cycle perspective, the origin of the carbon dioxide emission has been charted and analyzed. This information has been used to create a computational model that calculates the total emission of carbon dioxide from a specific apartment block. The results from the analyzed apartment blocks indicate that both the use of energy and the emission of carbon dioxide have been reduced since the 1960s. Through the examination of building materials, it is possible to lower the emission of carbon dioxide that origins from the construction phase of an apartment block.

Lokalplanläggning Green & Cool

Friginor startades år 1984 och har idag 55 stycken anställda. Deras inriktning är installation av kyl- och frysanläggningar samt service. 2006 startade Friginor ett dotterbolag, Green and Cool, som monterar miljövänliga kylaggregat med koldioxid som köldmedium. Miljöfarliga köldmedier kan ha upp till 3800 gånger så stor miljöpåverkan jämfört med koldioxid. Idag sker monteringen av dessa kylaggregat i bristfälliga utrymmen.

Lokalplanläggning Green & Cool

Friginor startades år 1984 och har idag 55 stycken anställda. Deras inriktning är installation av kyl- och frysanläggningar samt service. 2006 startade Friginor ett dotterbolag, Green and Cool, som monterar miljövänliga kylaggregat med koldioxid som köldmedium. Miljöfarliga köldmedier kan ha upp till 3800 gånger så stor miljöpåverkan jämfört med koldioxid. Idag sker monteringen av dessa kylaggregat i bristfälliga utrymmen. Målet med det här examensarbetet är att ge Green and Cool olika förslag på lokalplanlösningar, ta fram vilken bemanning som krävs för framtida produktion samt titta på olika hjälpmedel för transport mellan monteringsstationerna.

Vindkraft i Sverige : Nuläge och framtidsutsikter med fokus på energilagring

Den här rapporten är gjord för ett kandidatexamensarbete på KTH inom programmet industriell ekonomi med inriktning mot energisystem och hållbar utveckling. Bakgrunden till studien är den ökning av andelen elektricitet i Sverige som genereras från förnybara energikällor, där lagstiftning och politiska mål kring utsläpp av växthusgaser har varit drivande faktorer. Vindkraft är en av dessa förnybara energikällor och produktionen av elektricitet från vindkraft har på senare tid ökat kraftigt i Sverige.Den ökade mängden vindkraft som ingår i det svenska energisystemet ställer ökade krav på regleringen av produktionen i elnätet då vindkraftens effekt varierar med vindhastigheten, den är intermittent. I dagsläget är det främst vattenkraften som används för reglering av vindkraften, men den är till största del utbyggd i norra Sverige och transmissionsbegränsningar i elnätet gör att dess förmåga att reglera elproduktion i södra Sverige är begränsad.Studiens mål är att svara på om det finns teknologier för lagring av energi som är lämpliga och ekonomiskt hållbara för användning i Sverige samt hur dagsläget för vindkraften ser ut i Sverige. En omfattande studie av de i dagsläget aktuella teknologierna för lagring av energi utförs.

OTEC för Tarawa

Ocean Thermal Energy Conversion, OTEC, a technology using the temperature difference between cold deep seawater and warm surface water, can extract the work in the form of electricity. OTEC gives also synergies of drinkable fresh water. The temperature difference has an impact on the efficiency of the technology, which means that the feasibility of OTEC is geographically limited. The project intends to explore the possibility of replacing the atoll Tarawa?s present electricity generation with an OTEC plant and to explore synergies. In the present situation all of Tarawa?s electricity is generated by fossil fuels.

Framtidens elnät : Hur elbilar och solceller påverkar på det lokala elnätet

The purpose of the project is to determine the impact of solar cells and electrical vehicles on the future electricity grid and distribution network. Future electricity grids will be affected differently than it does today. Therefore, it is important to determine the impacts so that the current electricity distribution system can be developed and redesign to achieve the future demand. In Sweden, government has changed rules and laws in order to make it easier for private sector to invest in renewable energy sources. Our project focused on the impact of the solar cells and electric vehicles on the low voltage electricity distribution.

Biosensorsystem fo?r o?vervakning av vattenkvalitet

Sweden's drinking water quality is considered to be high partly due to a high quality of the raw water and a well developed sewage infrastructure. Despite this, there is water contamination that could be prevented by installation of a sophisticated early warning system. Some of the major players in the production of drinking water have already invested in different types of early warning systems to ensure drinking water of high quality. There are various forms of early warning systems where automatic monitoring of E. Coli is an interesting alternative.

<- Föregående sida 28 Nästa sida ->