
Sökresultat:
1524 Uppsatser om Sub surface flow wetlands - Sida 6 av 102
Ökat flöde genom timmersorteringen vid Ala sågverk
Ala sawmill in Ljusne, Hälsingland, has increased its flow through the sawing plant during the last couple of years. The problem now is the sorting plant, as this part of the mill is now slower than the rest. A close analysis of the sorting plant was therefore necessary to be able to increase the flow through. The aim of the project was to find solutions that can lessen downtime and increase flow. The goal was to increase the flow from 650 to 925 logs through the sorting plant per hour.
Ergonomisk och användarvänlig släplift anpassad för skidanläggningarnas och fjällturismens utveckling. : Rapport, examensarbete 2012
Surface lift adapted for today?s user Today?s T-bar lift looks almost the same as when it was launched in 1938, even though a lot has happened in the ski and mountain industries. New equipment has developed without any major adjustment to the lift. Snowboard, sit ski and downhill biking are just some examples of the evolution that demands new seating positions. It?s also very common for families to spend their holidays in the mountains nowadays.
Arbetsglädje : En kvalitativ intervjustudie om hur fem lärare i grundskolans tidigare år beskriver arbetsglädjens betydelse och påverkan
The goal of this study is to examine what five teacher?s impression of the teacher?s role is in their previous years. How important the ?joy at work? is in relation with the educational progress? And what aspects that contributes to the? joy at work? and what obstacles that stops them. The essay will also go through the concepts of a teacher role, with connection to the theoretical perspectives of Csikszentmihalyi?s Flow and Antonovsky?s Salutogenesis (KASAM).The method I used was interviewing five teachers and I used Larsen?s chapter of ?content analysis? as a basis, I also used Flow and KASAM as theoretical references in my analysis.
Simulering av ett värmesystem i COMSOL Multiphysics : Pipe Flow Module
Syftet med detta arbete är att simulera ett värmesystem i COMSOL Multiphysics, Pipe Flow Module, Non-Isothermal Pipe Flow som innehåller ekvationer och randvillkor för att modellera inkompressibel strömning och värmeöverföring i rör.Data om processen och dess komponenter har samlats in från industrin där arbetet är utfört och i vissa fall modifierats för att bättre beskrivas i programmet.Utifrån insamlad data har en modell byggts upp och två simuleringar har gjorts. En stationär för starten av systemet, den har sedan legat till grund för en dynamisk som simulerar förloppet från start till normaldrift.Tiden det tar för det aktuella fallet att nå drifttemperatur är 16 timmar. En felströmning upptäcktes samt att en av pumparna inte kommer att klara en start från 20 °C..
Kassaflöde och Kapitalbindning. En studie av vilka åtgärder och faktorer som vägs in i beslutssituationer i bygg- och anläggningsbranschen.
Background: Today there are high claims on organizations to show a positive economic view. To satisfy the demands and expectations from interested parties it is very important to carefully plan the companies tied up capital and cash flows. Purpose: The purpose with the thesis is to describe what actions organizations take to resolve the conflict between showing a positive cash flow and the need to tie up capital.The purpose is also to explain the different factors that must be considered when making decisions regarding cash flow and capital tied up. Method: A qualitative study of the actions and factors wich must be considered when decisions in swedish construction companies are made regarding cash flow and capital tied up. Results: A model of the factors and actions that affect cash flow and capital tied up in projects.
Hänsyn till mark och vatten vid slutavverkning : en fältstudie på känsliga marker
The purpose of this study is to investigate if there is enough consideration taken to sensitive forest areas close to water or wetlands during clear cutting assignments, and to estimate the extent of damage made by forestry machines used at that time. A field and literature study is used to show how to improve and prevent the damage made in the wake of the machines.
This study is made for Sydved, and shall culminate in a policy to prevent ground damage during their clear cutting assignments.
The areas which were part of the field studies were clearcuttings on fine grained soil close to water and wetlands. The purpose was to find out if the water had been affected, what had been done to prevent ground damages and what more could have been done.
The results of the field studies show that more work needs to be done to reach up to expectations. More information about the assignment area, better planning of sensitive regions, and strengthening of the main haul roads with brush are some of the improvements that can be done. There is also a need for more exact guidelines, follow-ups and education for everyone involved to have the same goals and understanding to prevent ground damage..
Flödesanalys av plåtsammansättning : Strävan mot Just-In-Time och minskat slöseri
The Volvo Trucks plant in Umeå is a highy complex manufacturing facility where the same production line handles a variety of different models. This require flexible and agile processes with high quality standards. This thesis studies the flow of material through a production line and how Volvo can use their existing manufacturing monitoring system to optimize the flow of materials.The goal with the thesis is to identify eventual problems with the flow of materials and to deliver a few proposals on how the production line can improve its productivity. The theory of LEAN, Just-In-Time and Supply Chain Management serves as the scientific reference to this project. By analyzing the flow of material, performing interviews and observing the processes a few problems are identified.
Perkolationsfilter : En undersökning av reningseffekt med avseende på järn och mangan
This master thesis has been done in cooperation with Sweco Viak AB in Sundsvall. The aimwith the project is to investigate the purifying effect of percolation filter due to iron andmanganese. The overall goal was to investigate how the parameters surface load,sandfractions, and burden time affect the purifying effect. The expectation is to optimize thedesign and find a demouldning of the filter that gives sufficient purifying with a highersurface load. As an attempt to accelerate the curing of the filter, experiments with a layer ofsand which surface has been covered with manganese ore (MnO2) on top of the filter havebeen done.As test filters 10 L bars were used and the experimental work was performed at thewaterworks in Hassela and Munkbysjön.In Hassela different sandfractions were tested.
I jakten på flow : Gameplay Progression i Pervasive Games
Hur kan svårighetsprogression användas i skapandet av Puzzlehunts med syfte att uppnå en ökad upplevd känsla av flow hos spelaren? Denna frågeställning behandlas i uppsatsen och problemet som måste lösas är hur man kan bygga upp en ackumulerad kunskap om något vars syfte är att hela tiden tvinga dig att hitta nya lösningar på problem. I mer traditionella spel kan upprepning lära spelaren hur spelmekaniken fungerar. I puzzlehunts kan upprepning av spelmekanik inte användas eftersom målet för varje pussel är att hitta mekaniken som löser problemet. Uppsatsen visar att man genom inlärning av hur man skall tänka för att hitta lösningarna till pusslen kan bygga upp en ackumulerad kunskap hos spelaren och därmed även ha en svårighetsprogression och öka upplevd nivå av flow hos spelaren..
Kan faktorerna KASAM, flow samt prestationsbehov predicera arbetstillfredsställelse?
Tidigare studier har visat att faktorerna KASAM, flow samt prestationsbehov har betydelse för hög upplevd arbetstillfredsställelse. I denna studie undersöks om dessa faktorer även är aktuella under svenska förhållanden. En enkätundersökning genomfördes på 137 anställda på tre olika företag för att mäta om de tre faktorerna kan predicera arbetstillfredsställelse. Resultatet visade att KASAM, och särskilt komponenten meningsfullhet, var en stark prediktor av arbets-tillfredsställelse. Även flow, och särskilt dimensionen inomboende arbetsmotivation, hade ett signifikant prediktionsvärde medan det visade sig att prestationsbehov inte predicerade arbetstillfredsställelse.
Kassaflödesanalyser : En undersökning av kassaflödesanalysens användning i förhållande till det tidsperspektiv som styr företagens agerande.
Purpose: The purpose of this thesis is to investigate potential associations between usage of the cash flow statement report and time perspective in which companies? acts and set goals. Method: Our approach is quantitative, using empirical data summarized in a statistical procedure. The result is thereafter analysed through the developed analysis model from which conclusion is drawn. Results: We have in the investigation stated that the usage of the cash flow statement report varies depending on the time perspective in which companies? acts.
Effektivisering av kundorderflöde : En fallstudie på BUFAB Bulten Stainless AB
We were commissioned by Bulten Stainless AB to identify and analyze their customer order flow. Because the company had problems with delays in the production and deliveries to the customer, the task also included investigation of how the company work with prevention and management of delays. The purpose of the project also included to identify critical factors for effective order flow in smaller workshop companies.The information about the flow and how the work takes place within the company were collected through observations on the company and interviews with the staff. This information was used to draw maps over the customer order flow and to write a description of the current situation within the company. Both strengths and weaknesses of the companies work could be identified through analysis of the present situation.
Utvärdering av labpilot - flödesbatteri : Experimentell studie
Results have shown that flow batteries may be a solution in the future as an effective and environmental friendly method to an energy storage system (ESS). The technology is reliable and has a high efficiency that comes with low energy losses and a long lifetime. The range of possible fields is suitable for cutting energy peaks in the power grid, by always have a ready and available energy storage that balances the production. By comparing the advantages of flow batteries with conventional batteries it is mainly the fact that they can conserve energy for a long time without being self-discharged thanks to that the storage capacity is in principle endless and limited by the size of the electrolytes tanks that makes them a great energy storage system. The batteries won?t take any damage or decrease in performance when charging or discharging it or if you exhausts it to 100 % and leave it discharged for a long time.
Kirunametoden-Jämförelse emot en konventionell injusteringsmetod
AbstractWith increasing population and increasing demands for comfort and thus an increase in energy demand, it is necessary to examine various energy-efficiency measures. This work deals with the ability to control the flow through the heating system to achieve the desired comfort with as little energy as possibleA heating system contains of different parts, roughly speaking, you can divide it to three main components: Heat source, Distribution and Heat emitters. All components are working together to bring heat to the building. What is examined in this report are different ways of adjusting the flow and supply temperature and how it affects comfort and energy use in a building.At today ?s date the conventional method is to use a high flow through the heating system, which affects pressure drop and cooling of the fluid.
Utformning av ett materialflödessystem anpassat för HSP-Gripens produktion
Like many small-time companies there is a need to improve the flow of materials at HSP-Gripen AB. The company develops and manufactures hydraulic-powered grapples for the machine- and forest industry. By mapping the material flow in the current production and gathering necessary data, suggestions on how different parts of the production could be controlled is presented in this dissertation. This has been achieved by the study of relevant scientific literature. The suggested ways of controlling the production consist of 2-bin systems, hybrid material flow system as well as a cyclic product-planning.