Sökresultat:
595 Uppsatser om Stone-heating oven - Sida 34 av 40
Energianalys av Svensk Växtkrafts biogasanläggning i Västerås
Svensk Växtkraft is the owner of the biogas plant in Västerås. The company is planning to increase
their treatment capacity at their biogas plant. In connection to this work it is also possible to make
some energy saving changes to the biogas plant. The objective of this study was therefore to make
an electricity and heat survey of the biogas plant, a detailed study of the heat consumption in the
sanitation step and also a comparison of energy consumption with the present sanitation method
and an alternative strategy where the waste is treated in 55 °C during 10 hours (the current method
is heating to 70 °C during 1 hour).
The energy survey was conducted in close collaboration with staff at the biogas plant. The current
during normal operation was measured, power was calculated and multiplied by the time of usage to
obtain the energy consumed.
Effektivisering : En utredning om åtgärder på en industrifastighet
AbstractDelta Terminal owns an outdated industrial building which they now rent out to businesses. This property currently has a high energy con-sumption and therfore it is desirable to improve the efficiency. In ordet to reduce the energy consumption within the industrial building enve-lope, the heating systems and lighting are being investegated. A good building envelope emits less heat and thus reduces the energy consump-tion. An energy audit is a tool used to determine the energy loss.
Lönsam energieffektivisering : Ett samarbete mellan ÅF och kund
This thesis project has focused on studying ÅF?s business concept Energy Collaboration, which is their way of selling energy efficiency services. Thereforeongoing projects have been analyzed. The purpose was to determine achieved energy efficiency, costs and profitability for the studied projects. It was concluded that the Energy Collaboration is a good way of selling energy efficiency services, since the customer takes no risk and energy savings of about 15-25 % can be achieved with simple measures.
Energy analysis of a fruit drying plant in Adeiso, Ghana
The purpose of the project has been to work out recommendations that reduce the energy-related costs and environmental impact of HPW Fresh & Dry Ltd., a fruit
drying factory in Ghana. The factory produces electricity with diesel and biogas but also purchases electricity from the national electricity company. Heat for the drying
process is produced from biogas, kerosene and solar panels. In the project the energy system was analyzed by measuring production and consumption of heat and electricity.
The project results show that the factory can become self-sufficient on heat if the available energy is used more efficient. The production units for both electricity and heat have low efficiencies.
Gårdsbaserad biogas på Nya Skottorp : utvärdering och optimering av anläggningen och uppgradering av biogasen
Biogas is an expanding sector within the broad field of agriculture and animal production. Small-scale biogas offers local combined power and heating production and the substrate is transformed into high-quality biological fertilizer. This bachelor thesis focuses on a pig farm in south-western Sweden, where biogas is produced from pig manure, evaluates and suggests ways of optimizing the process and investigates whether investing in an upgrading plant would be a feasible and more cost-efficient option. The results show that the biogas plant is working well, although the production differs from the original plans. This shows in turn that planning and examining the basic conditions before making the investment is of great importance, as well as monitoring and keeping detailed statistics of the running process.
Kraftvärmeverk i glesbygd - en möjlighet?
Our purpose in this paper is to examine if there is any profitability for a company with a factory in the timber industry to invest in a combined heat and power, CHP. Based on analysis and the results that the paper generates, we will give Derome AB a suggestion on how it is a profitable investment or not to installing in a CHP.By investing in a CHP plant, you can get a high efficiency, which means that companies can use their resources more effectively. The Swedish wood industry has by-products of production that can be used for combustion in their boiler which is an advantage.The essay is a qualitative study where we have a case company, Derome AB. In this company, we interviewed two employees who have knowledge in the study. They have helped us to provide information and data about their business.We chose to use the pay-off- and the net present value method, NPV, to see if there are profitable advantages for the investment.
Inventering av förorenade områden enligt MIFO-fas 1 : Erasteel Kloster AB, Söderfors
Erasteel Kloster AB Söderfors have been commissioned by the county administrative board in
Uppsala län to make an inventory of possible contaminations in theirs industrial- and landfill areas on the basis of the Swedish Environmental Protection Agency?s; ?Method of Surveying Contaminated Sites-phase 1? (MIFO-fas 1). The inventory starts with maps and archive studies, place visits and interviews, and finally a risk classification is done. A risk classification is a compilation of four categories; pollutant toxicity, contamination level, possible spreading condition of the pollutant, sensitivity and protection value of the environment.
In this paper five partial areas (Holmen- and Jörsöområdet, Järnsvampsområdet,
Ingsådeponin, Östra verken and Myrområdet) have been described from a historical point of
view. Only parts of four areas have been risk classified (Holmen- and Jörsöområdet,
Järnsvampsområdet, Ingsådeponin and Östra verken), due to that the other areas isn?t own by Erasteel Kloster AB.
Holmen- and Jörsöområdet
Holmen- and Jörsöområdet have during the entire activity time been carried out as the
production core in the company.
Värmeförluster vid utvändigt placerade ventilationssystem
To be able to handle tomorrows need for limited energy consumption we need to reduce our use of energy. The building sector stands for around 40 % of all energy consumption in the society. The government has put up a goal to reduce the energy consumption in our buildings with 20 % by year 2020 and 50 % by year 2050 compared with year 1995. To be able to do reach that goal we need a more energy efficient building stock.The main part of the energy used in our buildings is used for space heating. By installing ventilation systems with heat recovery on the exhaust air it is possible to use the heat-energy in the exhaust air to warm up the incoming air.
Cirkelformen i landskapet : funktionen och användningen av cirkelformen i landskapsplaneringen
The Circle is a strong form that influences the landscape. It also has symbolic value which influences our feelings and experiences. This Thesis project examines the Circles? characteristics and its significance in various connections. The goal of this Thesis is to examine what role the Circle plays in various situations and what motives there are for using it is landscape architecture.
The basis for this Thesis work is a proposal which has been drawn up for development of the rural area between the villages of Hofterup and Löddeköping in the municipality of Kävlinge.
Effektivare elanvändning på avfallskraftvärmeverk : Förslag till handlingsplan för minskad elanvändning på Renovas anläggning i Göteborg
This thesis has identified and studied measures to allow for reduced use of electricity in a waste incineration plant in western Sweden. The energy extracted from the waste at the powerplant is utilized and sold in form of electricity and heat. Technical and environmentally the combined heat and power plant is by today's standards among the leading waste incineration plants in the world. The owners are constantly striving to improve the efficiency of the waste incineration plant. They have seen the opportunities for savings in reducing internal usage of electricity.
Användarrelaterad energieffektivisering : En studie på länssjukhuset i Sundsvall
Energy efficiency is important both to reduce costs and to reduce greenhouse gas in the atmosphere. In Sweden 40 percent of the energy consumption is related to the buildings sector. Hospitals are complex buildings with different activities in the same building, which requires flexible technical systems for ventilation, heating and lightning. A quarter of the total energy consumption in Swedish hospitals is related to user activities in the hospitals. Therefore it is not only important to work with operational optimization but also to change user activities, to reduce energy consumption.The objective of this thesis was to examine the user-related energy efficiency work at two care units, at the central hospital in Sundsvall within Västernorrlands County.
Utveckling av analysverktyg för verksamheters CO2-utsläpp och energianvändning
With increasing energy prices and increased focus on the environment we saw the need for companies to get control over their energy use and their emission of carbon dioxid. An analysis tool that integrates both these areas is, with our knowledge, not available on the market today. Therefore, our project became to develop such a tool.By doing this degree project we would like to clarify that energy consumption and environmental impact are integrated. The less energy consumed by today?s society the smaller the environmental impact will be.
Matavfall från livsmedelsbutiker : - En analys av den kommunala hanteringen i Sverige samt en detaljstudie av förhållandena i Umeå kommun
Food waste from grocery stores - An analysis of municipal management inSweden and a detailed study of the situation in Umeå municipalityThe objective of this thesis was to analyze the municipal management of food waste fromgrocery stores in Sweden in general and in Umeå municipality in particular. Furthermore theobjective was to account for the different waste treatment methods that can be used and toevaluate them from an environmental perspective. In order to analyze the municipalmanagement a survey was sent to all of the municipalities/municipal waste companies inSweden. A general comparison of treatment methods was carried out on the basis of ascientific review and a system analysis was performed in order to compare three differenttreatment alternatives for the food waste generated in grocery stores in Umeå. The surveyshowed that the legal definition of food waste from grocery stores is unclear and variesbetween municipalities.
Förändrat omhändertagande av patienter med uretärsten : - Lärdomar från ett förbättringsarbete
Bakgrund: Omkring 10-15 % av befolkningen, oftast i arbetsför ålder, riskerar att någon gång drabbas av njursten. Nationella riktlinjer för njurstensbehandling saknas, men studier stödjer behandling inom 48 timmar för snabb symtomlindring och minskade besvär för patienten. Inom studerad verksamhet var tiden från diagnos till behandling lång och återinläggningarna var många, varför ett förbättringsarbete initierades.Syfte: Syftet med förbättringsarbetet var att halvera tiden från diagnos till behandling för patienter med akut behandlingskrävande uretärsten, samt minska negativa effekter relaterade till obehandlad uretärsten. Vidare syftade studien av förbättringsarbetet till att beskriva ett tvärprofessionellt teams erfarenheter av aktuellt förbättringsarbete gällande patienter med uretärsten.Metod: Ett tvärprofessionellt team bedrev förbättringsarbetet med stöd av Nolans modell för förbättringsarbete, vilket studerades genom en deskriptiv fallstudie med induktiv ansats. Effekterna av förbättringsarbetet utvärderades med Statistical Process Control (SPC).
Energisparande åtgärder för uppvärmning i en 70-tals villa : Energy-saving measures for heating in a 70-century detached house
Detta examensarbete på 15 högskolepoäng har som syfte att undersöka några åtgärder för minskade uppvärmningskostnader. Då det byggs mycket nytt idag får man inte glömma bort alla befintliga byggnader. Det första steget mot minskad energianvändning är att minimera uppvärmningsbehovet. I detta arbete har vissa utvalda åtgärder beräknats på en 70-tals villa för att se vad man sparar in. Genom mätningar och information från villans byggnadsbeskrivning beräknas byggnadsdelarnas U-värden.