Sökresultat:
1998 Uppsatser om Steel construction - Sida 3 av 134
Samarbete i byggprocessen : entreprenörens förväntningar på byggherren
Everywhere you look in today?s society many kinds of people are constantly interacting with each other. Especially in large groups of people working together, the phenomenon is even greater. In the construction industry there are many kinds of parts that need to come together in order to get sustainable and successful results. Therefore the relationship between the contractor and the construction client must be at its best.
Induktiv provning av ferritiskt rostfritt stå
The report examines the factors which may be a contributing cause to the problems that are present when ferritic stainless steel are eddy current tested in a warm condition. The work is carried out at Fagersta Stainless AB in Fagersta which manufactures stainless steel wire. In the rolling mill there is an eddy current equipment for detection of surface defects on the wire. The ferritic stainless steels cause a noise when testing and this noise complicates the detection of defects.Because of this, a study was made of how the noise related to factors such as steel grade, temperature, size and velocity. By observing the signal and with the possibilities to change the equipment settings the capability to let a signal filter reduce the noise level were evaluated.
Utvärdering av den bärande tegel- och betongstommen i en byggnad från år 1916
This Master thesis is about a postal- and telegraphic building in Eskilstuna, Sweden. The construction methods for the specific building and buildings in general from the same time are described. The purpose of the report is to describe the loads acting on the building and how it has been built and why it has been rebuilt during the years. After this, possibilities of reconstruction and adaptation for today?s demands can be evaluated.
Utredning och implementering av en prototyp för integration av Prevas FOCS och ABB 800xA
ABB and Prevas have initiated a collaboration to sell a system to optimize steel industry furnaces, called FOCS. The purpose of this thesis is to investigate possibilities for integrating Prevas FOCS and ABB 800xA.The result of the investigation is used for an implementation of a prototype of the integrated system. The study shows a general method that can be used when implementing two software systems. The prototype of the integrated systems is made with usability principles in mind. This is a very important aspect in order to create a good working environment for the operators of a steel plant.
Åtgärdsförslag för att öka leveransprecisionen inom
materialanskaffningen: en fallstudie på Atlas Copco Secoroc
Atlas Copco Secoroc tillhör en av de tre ledande tillverkarna av bergborr- verktyg. Sandvik Steel har under en längre tid varit Atlas Copco Secorocs enda leverantör av hålvalsat borrstål. Samarbetet mellan företagen har lett till specialiserade produkter och en relation som är svår och tidsödande att bygga upp med en ny leverantör. Relationen har dock blivit påfrestad då leveransprecisionen från Sandvik Steel inte är tillräckligt hög. Den låga leveransprecisionen medför att Atlas Copco Secoroc får svårt att leverera sina produkter i tid.
Användbarhetsutvärdering av det lätta sandwichmaterialet Hybrix för bilkarossapplikationer
This M.Sc. thesis is a material application evaluation commissioned by the advanced body engineering department at SAAB Automobile AB. The purpose of the thesis is to evaluate implementation of the innovative sandwich design material Hybrix into an automobile body. Today the most commonly material used in the body is galvanized steel sheets and by shifting material to Hybrix several problematic issues have to be dealt with. Hybrix is an innovative sandwich sheet that inherits thin stainless steel face sheets and a stainless steel fibrous core.
Byggdamm : Vad krävs för att minimera spridningen på ROT-projekt under produktionsskedet
Dust that arises during the construction process is called ?construction dust?.People who are exposed for construction dust for a long period of time are atrisk to develop several forms of lung problems, allergies and cancer. Todayconstruction dust is a huge problem during the production in Skanska´srenovation projects. Every day workers are exposed of the unhealthyconstruction dust and it can cause lung problems and diseases after 10-30years. This is a problem that must be taken into account to obtain a betterworking environment on Skanska´s building sites.Skanska Sweden AB has given two students the task to investigate possibleproblems about the spreading of construction dust.
Underlag för BREEAM-certifiering : Kristianstad Nya Galleria
The company Olofsfors AB manufactures drive belts for forest machinery, known as ECO-Tracks, and abrasion-resistant steel and cutting edges for graders, excavators and tractors, known as Bruxite and SharqEdges. Manufacturing these products requires the steel to be heated and molded, then submerged in water and hardened. The water used in the hardening of steel is pumped to the process from pits below the floor and then pumped back to the pit after it?s been used. Since the temperature of this water rises after being used to harden the steel the temperature of the pumping pit needs to be adjusted to maintain its setpoint of 21°C.
Varför BIM?
Is the new technology always the best? This final project tries to determine if BIM is the melody of today, or if traditional 2D drawing is recommended. Perhaps a compromise is necessary, utilizing both methods.In order to answer this question, different views from the industry have been retrieved through reports, producers of software and users. The approach has consisted in building a 3D model of the school Råslättsskolan, house 01, along with interviews with people involved in the building process.When working in 2D it is hard to include the third dimension, mistakes are done and collisions happen that must be corrected, in most cases at the construction site. BIM is an incredible help since the model allows you to detect collisions and correct them.
Kriminalitet sätter mannen på prov ? En studie av identitetsskapande i romanen Snabba Cash.
The aim of this Master?s thesis is to examine how representations of identity construction are performed through the characters in the novel Snabba Cash by author Jens Lapidus. I examine what means the characters are using, and how the identity construction processes are related to the idea of modern society. For a theoretical background I use sociologist Anthony Giddens? theories regarding modernity and self-identity, to study general identity construction.
Driftoptimering av torkmaskin : Driftoptimering av torkmaskin 3 vid Billerudkorsnäs Karlsborg AB
The company Olofsfors AB manufactures drive belts for forest machinery, known as ECO-Tracks, and abrasion-resistant steel and cutting edges for graders, excavators and tractors, known as Bruxite and SharqEdges. Manufacturing these products requires the steel to be heated and molded, then submerged in water and hardened. The water used in the hardening of steel is pumped to the process from pits below the floor and then pumped back to the pit after it?s been used. Since the temperature of this water rises after being used to harden the steel the temperature of the pumping pit needs to be adjusted to maintain its setpoint of 21°C.
Klimatpåverkan vid vägbyggnad -beroende av vald konstruktion
It?s a fact that the climate is affected by the vehicle that runs on the worlds roads. But theconstruction of the road itself is rarely thought of as a climate threat. Svevia and the Swedish roadadministration have opposite views of how the construction of roads should be carried thru. It?sthe difference between those two construction methods that is the base in our thesis.The amount of energy use or the emissions are not analyzed for neither the Swedish roadadministrations nor Svevias construction models.
Parameterstudie av inneslutningsbildning och utvärdering av processföring för tillverkning av plastformsstål
This thesis has been performed at Uddeholms AB with the purpose to investigate theparameters affecting the formation of inclusions during the manufacturing of a low carbonmanganese-steel.A follow-up, steel and slag sampling and evaluations in microscope have been done for a totalof five heats.The results for each heat have been evaluated in relation to the theory from the literaturesurvey and suggestions for changes in the process to reduce the amount of inclusions whichhave a negative effect on the steel quality have been given.The project extends over a large process where many parameters affect the formation ofinclusions. However, a tendency that a higher addition of alloys seems to increase the totalamount of inclusions before and after the vacuum degassing is seen.The majority of the studied inclusions seem to approach the composition of the top slag aftervacuum degassing. Ladle glaze may cause the inclusions which had a different compositioncompared to that of the slag.A high or low ladleage together with a high argon flow during vacuum degassing seems todissolve particles from the refractory which later on get trapped inside the inclusions.The floatation for two heats has been studied where a short floatation seems to give a higheramount of inclusions in casted material.In machined material so called stringers were found. The main composition of those stringerswas pure alumina. Inclusions with a composition of pure alumina were not found in the liquidsteel, thus the pure alumina inclusions must be formed during the casting.
L?gkonjukturens p?verkan inom byggf?retag
The purpose of this study was to gain a better understanding of how medium-sized construction companies adapt and how they choose to reorganize their operations in relation to the recession. The study has as its theoretical starting point theories about organizational learning, the impact of the economy on construction companies and strategies for dealing with recessions. The
method used to conduct the study was semi-structured interviews with representatives from 15 different construction companies. The results of the study show that they used several strategies to adapt and reorganize the business in accordance with the recession. Some construction companies had to make cost savings as a result of the recession.
Vädrets påverkan på byggarbetsplatsen
This exam report contains studies about how the weather affects the construction site from a planning and productivity perspective. In 1960?s the contractors started to build during the winter, since then the demands to obtain a good construction has been higher on both the contractor and then promoter.In this report you will see how the different actors at the construction site handle the weather problems. By several interviews of the actors at the construction site there have been opinions about the weather situation which has been collected. To get a wide perspective of the problem, field studies from four different construction sites been made.Weather statistics over Halmstad is a mayor part of this report.