2188 Uppsatser om Stadium construction - Sida 2 av 146

L?gkonjukturens p?verkan inom byggf?retag

The purpose of this study was to gain a better understanding of how medium-sized construction companies adapt and how they choose to reorganize their operations in relation to the recession. The study has as its theoretical starting point theories about organizational learning, the impact of the economy on construction companies and strategies for dealing with recessions. The method used to conduct the study was semi-structured interviews with representatives from 15 different construction companies. The results of the study show that they used several strategies to adapt and reorganize the business in accordance with the recession. Some construction companies had to make cost savings as a result of the recession.

Vädrets påverkan på byggarbetsplatsen

This exam report contains studies about how the weather affects the construction site from a planning and productivity perspective. In 1960?s the contractors started to build during the winter, since then the demands to obtain a good construction has been higher on both the contractor and then promoter.In this report you will see how the different actors at the construction site handle the weather problems. By several interviews of the actors at the construction site there have been opinions about the weather situation which has been collected. To get a wide perspective of the problem, field studies from four different construction sites been made.Weather statistics over Halmstad is a mayor part of this report.

Värdering av anbud vid kommunala upphandlingar av byggprojekt

The thesis deals with evaluation of tenders for communal construction procurement. Each year the public procurement equals the value of millions of Swedish kronors, of which construction projects makes up a large proportion. These projects tend to often exceed their budgets. The aim with the thesis is to investigate if there are faults in the tender evaluation process. The theoretical framework for the study partly consists of a review on how the communal evaluation work is described in law and practice.

ARBETSMILJÖ OCH OLYCKOR I BYGGBRANSCHEN

The construction industry accounted for 19 % of all work-related fatalities in Sweden between 2010 and 2013. The exam report has been done to find out what underlying causes there are to the high number of fatalities and to the occupational statistics of the construction industry. Moreover it has been reviewed what improvements can be done to reduce accidents and fatalities in the construction industry. The report consists of a survey of statistics, laws and regulations affecting the work environment and of literature concerning the subject. It has been conducted an interview and a questionnaire survey at the construction company Asplunds Bygg and an interview with an inspector from the Work Environment Authority.

Industrialiserat byggande : Fältfabrikens användning, utveckling och framtid

The construction industry is currently receiving much criticism for inefficiency and slow development while demands for reduced built in moisture and efficiency increases. This report examines whether the use of field factories can meet these requirements and what factors that will be critical for future use of field factories. Industrialized construction with field factory is compared with traditional loose timber construction and industrial construction in the fields of execution, logistics and working environment. The aim of this report is to provide a basis for field factories current and future use and development. To achieve the aim of the report, people with experience in the use of the various methods was interviewed and literature studies in the various fields done.

Arbetsmiljö och säkerhet : På mindre företag inom byggindustrin

The accident frequency in the construction industry has shown a downward trend every year but this trend was broken 2010th. It is often lack of precautionary measures within work environment and safety that is the cause of accidents. The big construction companies understand the importance of precautionary measures within work environment and safety, as they spend a lot of money and time on that matter. By examining the work environment and the safety of the small construction companies you can see how they work. The report will presents how these small companies work with work environment and safety, and also how they follow the safety instructions that are available and how they make use of safety equipment.

Blir nog att jag tar och går och tar en tupplur nu. Om pseudosamordningar med gå och ta som förstaled.

This study provides a Construction-Grammar analysis of Swedish pseudo-coordination construction with the verbs gå "go" and ta "take" on the basis of an examination of empirical data. Factors bringing about different readings of gå and ta pseudocoordinations are discussed, showing that the readings correlate with certain semantic properties of the first and the second conjunct. Three distinct pseudocoordinations with gå are proposed, differing as to their readings: inceptive, surprising and imperfective. The single ta pseudocoordination is claimed to have both inceptive and intentional readings. It is illustrated that the readings of gå and ta pseudocoordinations are affected not only by inherent lexical properties of single conjuncts but also by their interaction with construction-level characteristics.

iPad på en byggarbetsplats : Det effektiva och papperslösa sättet att arbeta på

Quality assurance of construction projects and create effective ways of working, is intoday's pressed position, major objectives for building contractor companies. This thesis is an attempt to see if it is possible to achieve these goals with the new modern tool iPad.The author of this thesis has during the latter half of his one year practice work in Uppsala for the Swedish building construction company NCC Construction Sverige AB, conducted a study on the possibility of using the iPad on an construction site. This has been done with active field studies in which applications have been tested and also the supervisors receptive. The usability of the iPad has always been in focus since it is important that the applications are easy to use and easy to learn.The results of the work, as presented in this report, points at opportunities in efficiency if the iPad is introduced and used on construction site. There are many useful applications for the iPad, and with a system that can handle the synchronization between the iPad and the computer, the workflow will be streamlined significantly..

Resan mot partnering

The purpose of this thesis is to examine how the working method partnering has been welcomed in the Swedish construction company NCC and find possible explanations to this. The theoretical background used to understand and discuss our findings mainly builds on value and network dynamics. The empirical study is of a qualitative nature and builds upon 13 semi-structured interviews and the participation in a two-day start up workshop with 21 representatives from involved parties. The study shows that partnering has been positively accepted at NCC. Possible explanations for this can be found in the contrast the method represents to the traditional way of working within the construction industry.

"Jag ska också göra chokladbollar" : En undersökning om hur tillgången till konstruktionsmaterial påverkar barn i förskolan

The aim of this study was to investigate and compare the availability of construction materials affect children's constructions and play. Observations were made when the children were allowed to play and build with very little and much of the material play-doh dough in preschool. The study is aimed at children aged 3 ? 5 years. Interviews were also conducted with educators in departments where the children spent time to give support to this study.The result shows that the children create as many designs of any material amount.

Leverantörsrelationer : - i byggbranschen jämfört med ett företag i produktionsbranschen

Study objects: JM, Folkhem and ABB.Purpose: The purpose with this study are to examine how the supplier relations are in the construction branch and compare that result with how the supplier relations are for ABB a production company.Theoretical: The theoretical chapter illustrates important and relevant parts of supplier relations, purchasing and supplier strategies to give good overview. The theoretical review will combine information from different fields to consent with the research problem.Method: A case study has been made on three different companies, one of the companies was active in the production industry the other two were active in the construction industry. Data was mainly collected through semi structured interviews on each of the three companies.Conclusions: The size of the company decided which point of view the company had on purchasing, traditional or modern view. All three companies had a centralized purchasing organization but the construction firms were more decentralized than the production company. The reason was that the construction firms were dependent with more flexibility when every construction project is unique..

Säkrare byggarbetsplatser : En rapport om arbetsmiljö i allmänhet och fallolyckor i synnerhet

In Sweden there are 299 000 working in the construction industry. The construction industry is one of the industries where most accidents occur every year. During the last ten years there have been 111 death accidents in the construction industry and 48 of them were falling accidents. That means, in average, one death accident every month.Falling accidents gives serious injuries to the persons who are affected by them. It is anticipated that this report will investigate the factors beyond the falling accidents and also to present proposals that can decrease the number of falling accidents in the future.To secure a healthy and safe construction site it is of great importance that both the employers and the employees cooperate towards the same goal.

Effektivisering av byggproduktion med VDC och förstärkt verklighet : Streamlining construction work with VDC and augmented reality

Virtual Design and Construction (VDC) is currently used more and more within construction design and planning as well as construction as a streamlining tool aiming to improve communication and decrease the number of construction defects. VDC is constantly developing, but what comes next? The augmented reality (AR) technology is currently not used within construction in Sweden but should be considered as the next step in line regarding the integration of reality and digital information. Using this technology design can become reality even before it?s actually built.The purpose of this study has been to carry out an inventory of the existing AR technology and its shortcomings, and also to identify possible applications within the construction phase.

Situationsanpassat ledarskap för byggproduktion

A large cost at the construction sites today is the labour cost of the workers. But unfortunately the worker potential is not used to full. It is not unusual to take into a count with a work-­?place-­?additional-­?time of 50% in some cases. By increasing the workers' motivation and responsibility for their tasks may reduce the time considerably, which also increases the potential for greater gains in construction projects.By using the situational leadership may the workers level of maturity develop entirely.

Framtagning av typgodkända formkonstruktioner : Med inriktning mot traditionell väggform

This diploma work was conducted in collaboration with the Swedish civil engineeringconstruction company Skanska Construction in Stockholm. Their interest is todevelop a number of type approved form constructions which can be used during theconstruction of concrete walls. Skanska focuses on improving safety on their projectsand both supervisors and workers have a need for approved form constructions inthe current situation.The study is focused on safety and the purpose is to facilitate the preparation beforethe form work can begin. By studying the literature of the subject and conductinterviews with employees at Skanska Construction, the understanding of the issueand knowledge will be increased.Literature studies, interviews together with production and design have been thebasis for a successful study. The work has resulted in three types of approved formconstructions to Skanska Construction and the drawings can be used of employees atthe company.