Sökresultat:
1083 Uppsatser om Slump flow - Sida 6 av 73
Del projekt inom ClampCal - Utvärdering av mätmetoder för temperatur, viskositet och densitet samt röregenskaper
The dissertation were performed on SP, Technical Institute of Sweden.
The dissertation were carried out on the measurement technical department, this dissertation is a part of a bigger project, project ClampCal.
One of SP?s returning assignments are flow-measurement. When flow-measurement is performed, the flow has to be stopped so that a meter can be installed in the pipes where measurement is going to take place. At every stop there is time delay in the flow which causes the customers to loose money. This is why SP wanted to find a better solution so that measurement can be done without any stops in the flow.
Usage of a so-called Clamp-on meter was considered, but since the measurement uncertainty is too large it takes some investigation on the parts where the largest uncertainties occur and thus find a solution that can diminish the uncertainty as much as possible.
The parts that were considered to have an opportunity to reduce measurement uncertainties were the fluid temperature, its characteristics and the pipe geometry and its characteristics.
For the fluid temperature a Pt100-sensor with four different radii for various pipes was used.
Förslag till energieffektivisering och energideklarationsunderlag : Munkebergsskolan och Bredängens äldreboende i Luleå
This examination work is performed at the institution of industrial economy and production at Jonkoping technical university, for JELD-WEN Door Solutions plant in Forserum.Today the focus in the company is on to reduce their inventories binding of capitals as well as inventory of products and that includes to get a good control of the supply and handling of material which is of great importance.JELD-WEN Door Solutions is one of the worlds leading producers of windows and doors and the head-office is located in Oregon, USA.A great number of wooden doors are manufactured by the company in varying of constructions, classifications and performance.The production of the plant in Forserum has a project- and customer focus manufacturing where only internal doors are produced. The overall market they are concentrated on is to different institution such as schools, hospitals etc.The purpose of this work is to investigate possibilities to improvement of material- and production control at JELD-WEN. The report will handle the master production schedule to and from the production divisions within manufacturing industry. Focus will be on the way for information- and material flows from arrival, transport within the company and further on to customers.Further a map of the flow was performed which gave a clearer picture of the connection between the flow of information- and material for the manufacturing process. On the basis of the mapping of the flow, the group discovered that the flow of material had some improvement potential.
Design för Flow : En analys av designkriterier för användbarhet
Human Computer Interaction (HCI) handlar om att utveckla produkter med god användbarhet. Med användbarhet menas att system ska vara lätta att använda och lära. Jakob Nielsen är en av förgrundsfigurerna när det gäller riktlinjer för hur detta ska uppnås. Han har utvecklat tio kriterier som kan användas för att ett så bra system som möjligt ska kunna utvecklas.På senare år har forskare börjat se till, inte bara tekniska aspekter utan även till de känslor som användaren kan tänkas uppleva under det att denna interagerar med en webbsida. Ett flertal forskare har utvecklat teorier kring begreppet Flow.
Akustisk design av studiorum för musikinspelning
Detta projekt genomfördes i samarbete med akustikern Erling Nilsson på företaget Ecophon i Hyllinge. Uppdragsgivare var musikproducenten Magnus Ågren som äger studion Flow Music i Malmö. Uppgiften var att förbättra akustiken i ett av Flow Musics studiorum. Rummet hade före projektet en hård och obehaglig akustik. För att komma fram till ett åtgärdsförslag specificerades först hur enskilda akustiska egenskaper skulle påverkas för att ge ett så bra resultat som möjligt.
Opera i Stockholm, Stadsgårdskajen
The report is about efficiency of a current production group where there is no clear production flow and there are some buffers between the operations. The efficiency is done with the help of a tool that is calledWork process of flow production which is used by Atlas Copco CTO. The most obviously results are that the lead time drops from 25 hours to 425 minutes and that the balancing loss decreases from 85 % to 8 %. The report focus on decreasing transports, decreasing buffers, more reliability in lead time and quality. And a more stimulating labour content for the workers is another result..
En tand för en tand och en våtmark för en våtmark - ett återskapande värt pengarna? : En undersökning av nyttan och kostnaderna av att restaurera våtmark med hjälp av Contingent Valuation Method.
The goal of this study is to examine what five teacher?s impression of the teacher?s role is in their previous years. How important the ?joy at work? is in relation with the educational progress? And what aspects that contributes to the? joy at work? and what obstacles that stops them. The essay will also go through the concepts of a teacher role, with connection to the theoretical perspectives of Csikszentmihalyi?s Flow and Antonovsky?s Salutogenesis (KASAM).The method I used was interviewing five teachers and I used Larsen?s chapter of ?content analysis? as a basis, I also used Flow and KASAM as theoretical references in my analysis.
En flödesutjämnande driftstrategi för Uppsalas fjärrvärmesystem : En ändrad styrning av framtemperaturen
This thesis examines a possible control strategy to minimize flow fluctuations in Uppsala?s district heating system. High variations in flow rate may lead to complications caused by hydraulic constraints in the district heating system. These complications, such as inadequate pressure and temperature levels, increase the risk of heat delivery failures. It is therefore important to avoid such situations both for the producer and for the customers.Typically, the forward temperature is controlled by using a rough correlation with respect to the outdoor temperature.
Effektivisering av produktionsgrupp : Improving the efficiency of a production group
The report is about efficiency of a current production group where there is no clear production flow and there are some buffers between the operations. The efficiency is done with the help of a tool that is calledWork process of flow production which is used by Atlas Copco CTO. The most obviously results are that the lead time drops from 25 hours to 425 minutes and that the balancing loss decreases from 85 % to 8 %. The report focus on decreasing transports, decreasing buffers, more reliability in lead time and quality. And a more stimulating labour content for the workers is another result..
Småskalig vattenkraft vid Olofsfors bruksmuseum : Med faunapassage
In Sweden there are 1894 small-scale hydropower plants in operation, which together generate 4.3 TWh of electricity per year according to Swedish hydropower compound (SVKF, 2011). This corresponds to the annual consumption of about 860,000 Swedish households (based on an annual consumption of 5000 kWh). In the mid-1950s there were around 4000 small-scale hydropower plants in operation in Sweden before cheap fossil fuels and uranium competed with them, in the current situation only 1,894 of these are in use. If slumbering small hydropower plants once again would be taken into use and some new ones are built, we would be able to extract about 7 TWh of renewable electricity from these annually in Sweden, representing about 1.4 million households.The thesis intends to calculate and construct a hydroelectric power plant at the existing dam in Olofsfors and give suggestions on how the power station should run during the time that fish migration is greatest in Leduån.The turbine and generator to the station in Leduån at Olofsfors is designed by the height of the fall and the water flow through the dam. The turbine selected for the station is a CK-1000RM turbine with a 4-pole 250 kW generator from Cargo & power turbine Sweden AB, which is expected to deliver 1.2 GWh per year.
Syntes och egenskapskarakterisering av volframoxid framställd med magnetronsputtring
The system tungsten-oxygen has potential of being suitable for decorative coatings since ceramic coatings are often hard and wear resistant, and since modulations in oxygen content or incorporation of small ions could give bright colours. The aim of this report was to investigate the relationship between process parameters and the properties of the films, with the wear resistance being of special interest.Samples with tungsten to oxygen ratios in the range of 100:0 to 25:75 at% were made using reactive sputter deposition, either with constant gas flow, or gas flow controlled by optical emission of the plasma. The hysteresis of the system, which means that a certain gas flow will cause different pressure and/or target voltage depending on in what way the flow is reached, makes it interesting to control the process where the system makes the steep change from metallic tungsten to ceramic tungsten oxide. This is difficult and thus requires precise control equipment.The samples were analysed using X-ray diffraction, X-ray photoelectron spectroscopy and an empirical wear test suitable for small components like cell phone cover for example, in order to characterize the structure, composition and wear resistance of the coatings. The results could be divided into three groups: (I) tungsten-like, with very low oxygen content; (II) mixed phase and (III) tungsten oxide like, with oxygen content close to 75 at%.
Beteende hos lekvandrande lax i Klarälven ? utvärdering av en fiskfälla
During the migration season in 2013 a study on spawning migrating salmon and the effect of water flow on the behavior was conducted of the salmon at the Forshaga hydropower station in the River Klarälven. The River Klarälven with its nine hydropower plants on the Swedish side, constituting migration obstacles for the migrating salmon. Fortum Generation AB has together with the County Administrative Board restored a salmon trap at the lowermost hydropower station in Forshaga, aiming at making it possible for the salmon to swim into the trap, and thereafter be transported by truck past the power plants and then continue their journey to the spawning grounds on their own. Unfortunately, it is believed that the trap does not work as well as it should. In this study, I focused on salmon position in relation to water flow and if the number of salmon that swam into the fish trap differed between salmon with previous experience of the trap (experienced) and salmon without experience (unexperienced).
Modellerade och uppmätta kväveflöden i energiskog som bevattnas med avloppsvatten
The aim of this essay was to study the nitrogen flow in two willowplantations, at different locations in the south of Sweden, that wereirrigated with sewage. The study was also performed to compare thedifferences in nitrogen flows between two years, 1998 and 1999. The studywas made in three parts. First, the denitrification activity was measuredusing the acetylen inhibition method. Second the nitrogen flow, as well asthe water- and heat flows, were modeled through the SOIL-SOILN-modelThird; the nitrogen flow was calculated to compare with the results fromthe model.The results from the measurements were then compared with the resultsfrom the SOILN-simulations to detect differences in the denitrificationrate.
Just In Time : Effektivisering av materialflöden med hjälp av principer från Inventory Management och Production Management
AbstractManagement is a field that started getting attention in the beginning of the 20th century by Frederick Taylor. His publication is called the Principles of Scientific Management and is based on the principles of using scientific methods to find the best way of conducting each operation within a production facility. Many of Taylor?s principles may appear obsolete today but the matter of an effective material flow is still highly current. Efficiency is the relationship between the input into an operation and its result.
Flödesoptimering i begränsande resurs
Most companies have a bottleneck in their production, that is a constraining re-source. When the demand is higher than the capacity in the constraining resource it is impossible to produce the demanded output. This problem leads to delayed deliveries, unhappy customers and ultimately to decreased revenue. Bottlenecks therefore has a significant role in production and must be handled thereof.MW Power in Sävsjö, Sweden designs and manufactures water and steam boilers for the customer's unique needs. MW Power invested in a new plasma cutting ma-chine but the machine has not reached the expected capacity.
Skadliga nollflödespunkter i Fortum Värmes fjärrvärmenät i Stockholm : En analys av dess förekomst och effekter
When several production units provide a district heating network, water is pumped from different directions. When the flows from the plants finally meet in the network, the water can be completely still. These places are called zero flow zones. In district heating networks with several plants, which also have different supply temperatures, large and frequent temperature fluctuations can occur when the zero flow zones move. This may cause wear on the pipes, a phenomenon called low cycle fatigue.For this reason it is important to examine where and when zero flow zones that cause temperature changes occur.