Sök:

Flödesoptimering i begränsande resurs


Most companies have a bottleneck in their production, that is a constraining re-source. When the demand is higher than the capacity in the constraining resource it is impossible to produce the demanded output. This problem leads to delayed deliveries, unhappy customers and ultimately to decreased revenue. Bottlenecks therefore has a significant role in production and must be handled thereof.MW Power in Sävsjö, Sweden designs and manufactures water and steam boilers for the customer's unique needs. MW Power invested in a new plasma cutting ma-chine but the machine has not reached the expected capacity. The capacity prob-lem is due to time consuming set-up times, machine care and material supply which makes the plasma cutting machines utilization rate 37.5 %.The study?s purpose aims to maximize the material flow through the plasma cut-ting machine. In order to answer the purpose, two thesis questions are used: ?How can increased machine time in the plasma cutting machine be achieved?? and ?How can the ma-terial flow to and from the plasma cutting machine be improved so that the actual capacity can be increased??To answer the thesis questions, the study had a deductive approach in which ex-isting theories has been applied to real life case.In order to streamline the plasma cutting machine and the processes directly re-lated to it, the material flow upstream, the material flow through and the material flow downstream of the plasma cutting machine has been mapped and analyzed. In order to maximize the flow of material through the plasma cutting machine, setup times must be reduced to increase the capacity.The plasma cutting machine requires maintenance by the operator at regular basis where the nozzles and other consumables in the plasma cutting machine burner must be replaced. A SMED-analysis has been undertaken which shows that the internal set-up operations should be converted to external set-up operations. Re-placement of nozzles and consumables should be an external set-up operation and this can be achieved by purchasing more burners.The plasma cutting machine also has access to unmanned production which will be able to increase the capacity, since it can be running after hours.The material flow upstream and downstream must be improved through better planning of cutting orders and with a more efficient return flow. Prioritizing mate-rial supply to the constraining resource is crucial to secure that material shortages do not occur in the plasma cutting machine.If the study proposed measures are implemented, the material flow through the plasma cutting machine will be maximized.

Författare

Jesper Bergström Rickard Karlsson

Lärosäte och institution

Högskolan i Jönköping/JTH, Industriell organisation och produktion

Nivå:

"Kandidatuppsats". Självständigt arbete (examensarbete ) om minst 15 högskolepoäng utfört för att erhålla kandidatexamen.

Läs mer..